The Light Rail Transit Line 2, also known as LRT Line 2 (LRT-2) or Megatren, is a
rapid transit
Rapid transit or mass rapid transit (MRT), also known as heavy rail or metro, is a type of high-capacity public transport generally found in urban areas. A rapid transit system that primarily or traditionally runs below the surface may be c ...
line in
Metro Manila
Metropolitan Manila (often shortened as Metro Manila; fil, Kalakhang Maynila), officially the National Capital Region (NCR; fil, link=no, Pambansang Punong Rehiyon), is the capital region, seat of government and one of three List of metrop ...
in the Philippines, generally running in an east–west direction along the
Radial Road 6 and a portion of the
Circumferential Road 1, referred to as the Purple Line, and previously known as the Mass Rapid Transit Line 2 or MRT Line 2 (MRT-2).
Although the line is operated by the
Light Rail Transit Authority, resulting in it being called as "LRT-2", it is actually a
heavy rail, rapid transit line. Instead of the
light rail vehicles used in earlier lines, it uses very large metro cars, longer and wider than those used on the
PNR network, and roughly the same size as those used on the
MTR
The Mass Transit Railway (MTR) is a major public transport network serving :Hong Kong. Operated by the MTR Corporation Limited (MTRCL), it consists of heavy rail, light rail, and feeder bus service centred on a 10-line rapid transit network ...
in Hong Kong, MRT in
Bangkok
Bangkok, officially known in Thai as Krung Thep Maha Nakhon and colloquially as Krung Thep, is the capital and most populous city of Thailand. The city occupies in the Chao Phraya River delta in central Thailand and has an estimated populatio ...
and
Singapore
Singapore (), officially the Republic of Singapore, is a sovereign island country and city-state in maritime Southeast Asia. It lies about one degree of latitude () north of the equator, off the southern tip of the Malay Peninsula, borde ...
, and the heavy metro lines of the
Taipei Metro
Taipei Mass Rapid Transit (MRT), branded as Metro Taipei, is a rapid transit system serving the areas of Taipei and New Taipei in Taiwan, operated by the government-owned Taipei Rapid Transit Corporation, which also operates the Maokong Gondola ...
. Until the opening of
MRT Line 7 (MRT-7) in 2022 and the
Metro Manila Subway (MMS) in 2025, it is the country's only line using these types of trains.
Envisioned in the 1970s as part of the Metropolitan Manila Strategic Mass Rail Transit Development Plan, the thirteen-station,
line was the third rapid transit line to be built in Metro Manila when it started operations in 2003. It is operated by the Light Rail Transit Authority (LRTA), a government-owned and controlled corporation attached to the
Department of Transportation (DOTr).
Serving close to 200,000 passengers daily before the
COVID-19 pandemic in the country, the line is the least busy among Metro Manila's three rapid transit lines, and was built with standards such as
barrier-free access and the use of magnetic card tickets to facilitate passenger access in mind. Total ridership however is significantly below the line's built maximum capacity, with various solutions being proposed or implemented to increase ridership in addition to the planned extensions to the line. However, the short-term solutions have had a minimal effect on ridership, and experts have insisted that the extensions be built immediately, despite pronouncements that the system is steadily increasing ridership each year. Regardless, the line encounters periods of peak ridership during rush hour in the morning and the evening.
The line is integrated with the public transit system in Metro Manila, and passengers also take various forms of road-based public transport, such as buses and
jeepney
Jeepneys (), sometimes called jeeps (), are minibus-like public utility vehicles, serving as the most popular means of public transportation in the Philippines. They are known for their crowded seating and kitsch decorations, which have beco ...
s, to and from a station to reach their intended destination. Although the line aimed to reduce traffic congestion and travel times along R-6 and portions of C-1, the transportation system has only been partially successful due to the rising number of motor vehicles and rapid urbanization. Expanding the network's revenue line to accommodate more passengers is set on tackling this problem.
When the line's east extension to
Antipolo, Rizal
Antipolo, officially known as the City of Antipolo ( fil, Lungsod ng Antipolo), is a 1st class component city and capital of the province of Rizal, Philippines. According to the 2020 census, it has a population of 887,399 people. It is the mo ...
opened on July 5, 2021, Line 2 became the first rapid transit line extending outside the
Metro Manila
Metropolitan Manila (often shortened as Metro Manila; fil, Kalakhang Maynila), officially the National Capital Region (NCR; fil, link=no, Pambansang Punong Rehiyon), is the capital region, seat of government and one of three List of metrop ...
area.
Future plans include a three-station westbound extension in the
City of Manila by 2024
and another proposed eastbound extension from station in Masinag towards Cogeo and downtown
Antipolo
Antipolo, officially known as the City of Antipolo ( fil, Lungsod ng Antipolo), is a 1st class component city and capital of the province of Rizal, Philippines. According to the 2020 census, it has a population of 887,399 people. It is the m ...
.
Route

The rail line serves the cities that
Radial Road 6 (
Marcos Highway,
Aurora Boulevard
Aurora Boulevard is a four-to-ten lane major thoroughfare in Quezon City and San Juan in Metro Manila, Philippines. It was named after Doña Aurora Quezon, the consort of Commonwealth President Manuel Luis Quezon. It is one of the major roads ...
,
Ramon Magsaysay Boulevard,
Legarda Street and
Recto Avenue) passes through:
Manila
Manila ( , ; fil, Maynila, ), officially the City of Manila ( fil, Lungsod ng Maynila, ), is the capital city, capital of the Philippines, and its second-most populous city. It is Cities of the Philippines#Independent cities, highly urbanize ...
,
San Juan San Juan, Spanish for Saint John, may refer to:
Places Argentina
* San Juan Province, Argentina
* San Juan, Argentina, the capital of that province
* San Juan, Salta, a village in Iruya, Salta Province
* San Juan (Buenos Aires Underground), ...
,
Quezon City
Quezon City (, ; fil, Lungsod Quezon ), also known as the City of Quezon and Q.C. (read in Filipino as Kyusi), is the most populous city in the Philippines. According to the 2020 census, it has a population of 2,960,048 people. It was foun ...
,
Marikina
Marikina (), officially the City of Marikina ( fil, Lungsod ng Marikina), is a 1st class highly urbanized city in the National Capital Region of the Philippines. According to the 2020 census, it has a population of 456,159 people.
It is loca ...
,
Pasig (depot), and
Antipolo
Antipolo, officially known as the City of Antipolo ( fil, Lungsod ng Antipolo), is a 1st class component city and capital of the province of Rizal, Philippines. According to the 2020 census, it has a population of 887,399 people. It is the m ...
. The rails are mostly elevated and erected either over or along the roads covered, with sections below ground before and after the station, the only underground station on the line.
Stations
The line serves 13 stations along its route.
The western terminus of the line is the station at
Recto Avenue, while the eastern terminus of the line is the station along
Marcos Highway.
Three stations serve as connecting stations between other lines in the metro. is within walking distance to the station of the
PNR Metro Commuter Line; is indirectly connected to the
station of the same name on the
MRT Line 3 through local streets and inter-connected mall passageways inside
Araneta City (formerly Araneta Center); and is indirectly connected to the station of the
LRT Line 1 through a covered walkway. No stations are connected to other rapid transit lines within the paid areas.
Operations and services
The line currently runs from 5:00 a.m.
PST (
UTC+8) until 9:30 p.m. on a daily basis.
It operates almost every day of the year unless otherwise announced. Special schedules are announced via the
PA system
A public address system (or PA system) is an electronic system comprising microphones, amplifiers, loudspeakers, and related equipment. It increases the apparent volume (loudness) of a human voice, musical instrument, or other acoustic sound sou ...
at every station and also in
newspaper
A newspaper is a periodical publication containing written information about current events and is often typed in black ink with a white or gray background.
Newspapers can cover a wide variety of fields such as politics, business, sport ...
s and other
mass media
Mass media refers to a diverse array of media technologies that reach a large audience via mass communication. The technologies through which this communication takes place include a variety of outlets.
Broadcast media transmit informatio ...
. During
Holy Week
Holy Week ( la, Hebdomada Sancta or , ; grc, Ἁγία καὶ Μεγάλη Ἑβδομάς, translit=Hagia kai Megale Hebdomas, lit=Holy and Great Week) is the most sacred week in the liturgical year in Christianity. In Eastern Churches, wh ...
, a
public holiday in the Philippines
Public holidays in the Philippines are of two types, regular holidays and special non-working days.
History
On July 25, 1987, President Corazon Aquino promulgated the Administrative Code of the Philippines. Chapter 7 of this code specified a ...
, the rail system is closed for annual maintenance, owing to fewer commuters and traffic around the metro. Normal operation resumes on Monday.
During the
Christmas
Christmas is an annual festival commemorating the birth of Jesus Christ, observed primarily on December 25 as a religious and cultural celebration among billions of people around the world. A feast central to the Christian liturgical year ...
and year-end holidays, the operating hours of the line are modified and shortened, due to the low ridership of the line during the holidays.
History
Planning and early delays
During the construction of the first line of the
Manila Light Rail Transit System
The Manila Light Rail Transit System ( fil, Sistema ng Magaang Riles Panlulan ng Maynila), commonly known as the LRT, is an urban rail transit system that primarily serves Metro Manila, Philippines. Although categorized as a light rail syste ...
in the early 1980s, a Swiss company called Electrowatt Engineering Services designed a comprehensive plan for metro service in Metro Manila. The plan—still used as the basis for planning new metro lines—consisted of a network of rapid transit lines spanning all major corridors within 20 years, including a line on the Radial Road 6 alignment, one of the region's busiest road corridor.
A feasibility study for the LRT Line 2 that would connect Marikina to the
City of Manila via
Aurora Boulevard
Aurora Boulevard is a four-to-ten lane major thoroughfare in Quezon City and San Juan in Metro Manila, Philippines. It was named after Doña Aurora Quezon, the consort of Commonwealth President Manuel Luis Quezon. It is one of the major roads ...
and
Ramon Magsaysay Boulevard was carried out in 1988.
[ The project was to be bid out as a build-operate-transfer project together with the LRT Line 1 capacity expansion project in 1989.][ Although sixteen firms were reported to have submitted bids for the line's construction, the bidding failed, causing delays.][ Another feasibility study was conducted in 1991 with financing from the Overseas Economic Cooperation Fund (OECF). The final revised project was approved in 1995 as a separate project from the LRT-1 capacity expansion project.][
]
Construction and opening
The LRT Line 2 project officially began in 1996, twelve years after the opening of Line 1 Line 1 or 1 line may refer to:
Public transport Africa
* Line 1 (Algiers Metro), Algeria
* Cairo Metro Line 1, Egypt
Asia China
* Line 1 (Beijing Subway)
* Line 1 (Changchun Rail Transit)
* Line 1 (Changsha Metro)
* Line 1 (Changzhou Metro)
* L ...
, with the granting of the official development assistance
Official development assistance (ODA) is a category used by the Development Assistance Committee (DAC) of the Organisation for Economic Co-operation and Development (OECD) to measure foreign aid. The DAC first adopted the concept in 1969. It i ...
loan
In finance, a loan is the lending of money by one or more individuals, organizations, or other entities to other individuals, organizations, etc. The recipient (i.e., the borrower) incurs a debt and is usually liable to pay interest on that ...
s from the Japan Bank for International Cooperation for the line's construction starting in March of that year. The LRTA would have ownership of the system and assume all administrative functions, such as the regulation of fares and operations as well as the responsibility over construction and maintenance of the system and the procurement of spare parts for trains.
Construction started in 1997 after the LRTA signed the first three packages of the agreement with Sumitomo Corporation
is one of the largest worldwide '' sogo shosha'' general trading companies, and is a diversified corporation. The company was incorporated in 1919 and is a member company of the Sumitomo Group.
It is listed on three Japanese stock exchanges ...
delivering Package 1 in which covers the construction of the depot and its facilities, while the Hanjin- Itochu joint venture
A joint venture (JV) is a business entity created by two or more parties, generally characterized by shared ownership, shared returns and risks, and shared governance. Companies typically pursue joint ventures for one of four reasons: to acce ...
delivered packages 2 and 3 in which covers the substructure and the superstructure plus the stations respectively.
The project suffered delays in 1998 when the fourth package of the project, which includes the communications and fares systems, vehicles, and trackworks, were alleged to had irregularities with the contract. In September 2000, Package 4 was awarded to the ''Asia-Europe MRT Consortium'' (AEMC), a consortium of local and foreign companies led by Marubeni Corporation and composed of Balfour Beatty, Toshiba
, commonly known as Toshiba and stylized as TOSHIBA, is a Japanese multinational conglomerate corporation headquartered in Minato, Tokyo, Japan. Its diversified products and services include power, industrial and social infrastructure systems ...
, Daewoo Heavy Industries, and a local company which was D.M. Consuji Incorporated (DMCI). AEMC, through Marubeni Corporation, entered into a contract with Singapore Technologies Engineering on December 12 of that year to supply and install the communications system
A communications system or communication system is a collection of individual telecommunications networks, transmission systems, relay stations, tributary stations, and terminal equipment usually capable of interconnection and interoper ...
, supervisory control and data acquisition (SCADA) system, automatic fare collection system, and the management information system. The consortium provided the eighteen four-car trainsets built by Rotem and Toshiba
, commonly known as Toshiba and stylized as TOSHIBA, is a Japanese multinational conglomerate corporation headquartered in Minato, Tokyo, Japan. Its diversified products and services include power, industrial and social infrastructure systems ...
.
During construction, the LRTA, along with the project consultants oversaw all the design, construction, equipping, testing, commissioning, and technical supervision of the project activities. Halcrow was appointed in 1997 as the lead consultant for the project.
The pre-casting segmental method, a method used to launch girders and connect them to create a full span, was used in the construction of the original line (except the underground section in Katipunan).
On April 5, 2003, the first of the line, which forms part of the line's first phase, from to was inaugurated by President Gloria Macapagal Arroyo
Maria Gloria Macaraeg Macapagal Arroyo (, born April 5, 1947), often referred to by her initials GMA, is a Filipino academic and politician serving as one of the Deputy Speaker of the House of Representatives of the Philippines, House Deputy Spe ...
. In December 2003, a test run from to with passengers was conducted. Due to the absence of seamless interconnection between the initial section and the section beyond Araneta Center-Cubao, westbound passengers alighted at Cubao station before riding a train to V. Mapa. An estimated 3,000 passengers took the ride during the three-day test run. All remaining stations that are part of the line's second phase opened on April 5, 2004, except for Recto which opened on October 29, 2004. However, ridership was initially moderate yet still far below expectations, since the passenger volume in this line is not yet fully achieved.
To address passenger complaints on the lack of universal access on earlier train lines, the LRTA made sure during the construction phase that the stations were equipped with universal access by putting up escalator
An escalator is a moving staircase which carries people between floors of a building or structure. It consists of a motor-driven chain of individually linked steps on a track which cycle on a pair of tracks which keep the step tread horiz ...
s and elevator
An elevator or lift is a cable-assisted, hydraulic cylinder-assisted, or roller-track assisted machine that vertically transports people or freight between floors, levels, or decks of a building, vessel, or other structure. They ar ...
s for easier access, as well as making passenger fares at par with the other existing lines. However, while all stations have elevators to and from the platform, not all stations have elevators to and from the station concourse on both sides of the road.
East extension
Plans to extend the line to Antipolo were first laid out as part of Metro Manila Urban Transportation Integration Study Master Plan by the Japan International Cooperation Agency
The is a governmental agency that delivers the bulk of Official Development Assistance (ODA) for the government of Japan. It is chartered with assisting economic and social growth in developing countries, and the promotion of international c ...
(JICA) in 1999. The extension was first approved by the Investment Coordination Committee (ICC) board of the National Economic and Development Authority
The National Economic and Development Authority (NEDA; fil, Pambansang Pangasiwaan sa Kabuhayan at Pagpapaunlad) is an independent cabinet-level agency of the Philippine government responsible for economic development and planning. It is headed ...
(NEDA) in October 2003. The Light Rail Transit Authority announced its intention to extend the line eastward to Antipolo in 2006. The project aims to accommodate an additional 80,000 passengers and reduce traffic congestion along Marcos Highway.
The Light Rail Transit Authority secured funds for the project from Philippine banks in May 2011. In October 2011, the Japan International Cooperation Agency
The is a governmental agency that delivers the bulk of Official Development Assistance (ODA) for the government of Japan. It is chartered with assisting economic and social growth in developing countries, and the promotion of international c ...
released a feasibility study report for the project. The extension, starting from the eastern terminus of Santolan Station up to Antipolo station in Antipolo
Antipolo, officially known as the City of Antipolo ( fil, Lungsod ng Antipolo), is a 1st class component city and capital of the province of Rizal, Philippines. According to the 2020 census, it has a population of 887,399 people. It is the m ...
, calls for two additional stations, Marikina station
Marikina (), officially the City of Marikina ( fil, Lungsod ng Marikina), is a 1st class highly urbanized city in the National Capital Region of the Philippines. According to the 2020 census, it has a population of 456,159 people.
It is loc ...
in Barangay San Roque, Marikina near Sta. Lucia East Grand Mall
Sta. Lucia Mall (formally Sta. Lucia East Grand Mall) is a shopping mall owned by Sta. Lucia Realty & Development Inc. It is situated at the intersection of Marcos Highway, and Felix Avenue (formerly known as Imelda Avenue), located at Barangay ...
; and Antipolo station, in Barangay Mayamot, Antipolo near SM City Masinag. The ₱9.7 billion project, at its current form, was approved by the National Economic and Development Authority
The National Economic and Development Authority (NEDA; fil, Pambansang Pangasiwaan sa Kabuhayan at Pagpapaunlad) is an independent cabinet-level agency of the Philippine government responsible for economic development and planning. It is headed ...
chaired by then-President Benigno Aquino III
Benigno Simeon Cojuangco Aquino III (; February 8, 1960 – June 24, 2021), also known as Noynoy Aquino and colloquially as PNoy, was a Filipino politician who served as the 15th president of the Philippines from 2010 to 2016. The son of ...
on September 4, 2012. The civil works packages was funded by the Philippine government, while the electro-mechanical system package was funded by a loan from the Japan International Cooperation Agency
The is a governmental agency that delivers the bulk of Official Development Assistance (ODA) for the government of Japan. It is chartered with assisting economic and social growth in developing countries, and the promotion of international c ...
as part of its Capacity Enhancement of Mass Transit Systems in Metro Manila Project, wherein JICA allotted ¥43.2 billion for various extension and capacity expansion projects of railway lines in Metro Manila.
Before construction started, the Department of Transportation and Communications (DOTC) awarded a civil works consultancy contract to the Korean
Korean may refer to:
People and culture
* Koreans, ethnic group originating in the Korean Peninsula
* Korean cuisine
* Korean culture
* Korean language
**Korean alphabet, known as Hangul or Chosŏn'gŭl
**Korean dialects and the Jeju language
** ...
consortium of Foresight Development and Surveying Company, Soosung Engineering, and Korea Rail Network Authority in February 2014. The electrical and mechanical (E&M) systems consultancy contract was awarded to the CMX consortium, a consortium of Filipino and Japanese companies in March 2015. Both consortiums oversaw the design and construction of the project, and provided bidding assistance and technical supervision.
The civil works packages, Packages 1 and 2, covered the design and construction of the viaduct and stations, respectively. Both packages were awarded to D.M. Consunji Incorporated (DMCI). Package 3, awarded to the Marubeni
(, OSE: 8002, NSE: 8002) is a '' sōgō shōsha'' (general trading company) headquartered in Nihonbashi, Chuo, Tokyo, Japan. It is one of the largest ''sogo shosha'' and has leading market shares in cereal and paper pulp trading as well as a ...
- DMCI consortium, covers the design and installation of the railway tracks and electrical and mechanical (E&M) systems of the extension.
The groundbreaking ceremony was held on June 9, 2015 to mark the start of construction of the extension. Another groundbreaking ceremony was held on May 30, 2017 to mark the start of construction of the two stations. The installation of the railway track and E&M systems, meanwhile, commenced on April 16, 2019.
During construction, on March 10, 2017, a truck slammed in a concrete post of the east extension viaduct, causing one fatality and two injuries.
Unlike the original line which used the pre-casting segmental method of construction, the east extension viaduct made use of AASHTO girders with a deck slab above the girders.
The east extension was originally expected to be completed in the fourth quarter of 2020. However, construction delays brought by the COVID-19 pandemic
The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identified ...
delayed the extension's opening. As such, the extension was initially set to be inaugurated on April 26, 2021 and was expected to begin operations the following day, however, the opening day was delayed twice due to increased COVID-19 case spikes since March 2021 and to give time for work completion brought by technical considerations in integrating the two new stations to the railway's existing systems since June 2021.
After series of delays in the extension's opening, the extension opened on July 5, 2021 after being inaugurated on July 1 by President Rodrigo Duterte
Rodrigo Roa Duterte (, ; born March 28, 1945), also known as Digong, Rody, and by the initials DU30 and PRRD, is a Filipino lawyer and politician who served as the 16th president of the Philippines from 2016 to 2022. He is the chairperson ...
. The Department of Transportation and Light Rail Transit Authority offered free rides for the East Extension stations until July 18, 2021. From July 5 to September 2, 2021, a temporary shuttle service was implemented between Santolan and Antipolo stations due to ongoing integration works of the signalling system at that time. However, on the opening day of the extension, various inconveniences were reported by passengers along the extension. There was only one shuttle train servicing passengers in the east extension, causing waiting times that can reach as long as 20 to 30 minutes. The passengers also cited the lack of trains in the line. Seamless end-to-end train services between Antipolo and Recto stations and vice versa begun on September 3, 2021, after integration works were completed.
LRT Line 2 is planned to be further extended eastward up to Cogeo, and the Antipolo city government is very supportive of the project.
Station facilities, amenities, and services
With the exception of station, all stations are above ground.
Station layout and accessibility
Stations have a standard layout, with a concourse level and a platform level. The concourse is usually below the platform except for the underground station, with stairs, escalator
An escalator is a moving staircase which carries people between floors of a building or structure. It consists of a motor-driven chain of individually linked steps on a track which cycle on a pair of tracks which keep the step tread horiz ...
s and elevator
An elevator or lift is a cable-assisted, hydraulic cylinder-assisted, or roller-track assisted machine that vertically transports people or freight between floors, levels, or decks of a building, vessel, or other structure. They ar ...
s leading down to the platform level. The levels are separated by fare gates. All stations are barrier-free inside and outside the station, and trains have spaces for passengers using wheelchair
A wheelchair is a chair with wheels, used when walking is difficult or impossible due to illness, injury, problems related to old age, or disability. These can include spinal cord injuries (paraplegia, hemiplegia, and quadriplegia), cerebra ...
s.
The concourse contains ticket booths. Some stations, such as , are connected at concourse level to nearby buildings, such as shopping malls, for easier accessibility.
Stations either have island platform
An island platform (also center platform, centre platform) is a station layout arrangement where a single platform is positioned between two tracks within a railway station, tram stop or transitway interchange. Island platforms are popular ...
s, such as , or side platform
A side platform (also known as a marginal platform or a single-face platform) is a railway platform, platform positioned to the side of one or more railway tracks or guideways at a railway station, tram stop, or bus rapid transit, transitway. ...
s, such as and . Part of the platform at the front of the train is cordoned off for the use of pregnant women, children, elderly, and persons with disabilities. At side-platform stations, passengers are able to switch platforms at the concourse level without leaving the closed system, while passengers can easily switch sides at stations with island platforms. Stations have toilets at the concourse level, both inside and outside the closed system.
Most station platforms have a length of and a width of , with some stations having a length of .
As of November 8, 2009, folding bicycles are allowed to be brought into trains provided that it does not exceed the LRTA's baggage size limitations of . The last car of each train are also designated as "green zones", where folding bicycle users can ride with their bikes.
The line has a total of 72 escalators and 40 elevators across all 13 stations. However, by 2021, only a few elevators and escalators remain operational due to anomalies and corruption involving the procurement contracts, causing complaints from passengers. The elevators and escalators are being repaired and restored since 2022, and more are being repaired and restored as of April 2022.
Shops and services
Inside the concourse of all stations is at least one stall or stand where people can buy food or drinks. Stalls vary by station, and some have fast food stalls. The number of stalls also varies by station, and stations tend to have a wide variety, especially in stations such as Recto and V. Mapa.
Stations such as Recto and Santolan are connected to or are near shopping malls and/or other large shopping areas, where commuters are offered more shopping varieties.
In cooperation with the Philippine Daily Inquirer, passengers are offered a copy of the Inquirer Libre, a free, tabloid-size, Tagalog version of the Inquirer, which is available from 6 a.m. at all stations.
Safety and security
The line has always presented itself as a safe system to travel in, which was affirmed in a 2004 World Bank
The World Bank is an international financial institution that provides loans and grants to the governments of low- and middle-income countries for the purpose of pursuing capital projects. The World Bank is the collective name for the Inte ...
paper prepared by Halcrow describing the overall state of metro rail transit operations in Manila as being "good".[ (Prepared by Halcrow Group Limited).]
With an estimated pre-pandemic daily ridership of 200,000 passengers, and a current weekday ridership of 50,000 passengers, the line operates significantly below its designed capacity of between 570,000 and 580,000 passengers per day. Operating under capacity since 2004,[ (Prepared by Sanshu Engineering Consultant)] government officials have admitted that system extensions are overdue, although in the absence of major investment in the system's expansion, LRTA has resorted to experimenting with and/or implementing other solutions to maximize the use of the system, including having bus feeder lines.
For safety and security reasons, persons who are visibly intoxicated, insane and/or under the influence of controlled substances, persons carrying flammable materials and/or explosives, persons carrying bulky objects or items over tall and/or wide, and persons bringing pets and/or other animal
Animals are multicellular, eukaryotic organisms in the Kingdom (biology), biological kingdom Animalia. With few exceptions, animals Heterotroph, consume organic material, Cellular respiration#Aerobic respiration, breathe oxygen, are Motilit ...
s are prohibited from entering the line. Products in tin can
A steel can, tin can, tin (especially in British English, Australian English, Canadian English and South African English),
steel packaging, or can is a container for the distribution or storage of goods, made of thin metal. Many cans ...
s are also prohibited, citing the possibility of home-made bomb
A bomb is an explosive weapon that uses the exothermic reaction of an explosive material to provide an extremely sudden and violent release of energy. Detonations inflict damage principally through ground- and atmosphere-transmitted mechan ...
s being concealed inside the cans.
In response to the Rizal Day bombings and the September 11 attacks
The September 11 attacks, commonly known as 9/11, were four coordinated suicide terrorist attacks carried out by al-Qaeda against the United States on Tuesday, September 11, 2001. That morning, nineteen terrorists hijacked four commerc ...
, security has been stepped up on board. The Philippine National Police has a special police force, and security police
Security police officers are employed by or for a governmental agency or corporations to provide security service security services to those properties.
Security police protect facilities, properties, personnel, users, visitors and enforce cert ...
provided by private companies can be found in all stations. All stations have a head guard. Some stations may also have a deployed K9 bomb-sniffing dog. The line also employs the use of closed-circuit television inside all stations to monitor suspicious activities and to assure safety and security aboard the line. Passengers are also advised to look out for thieves, who can take advantage of the crowding aboard the trains. Wanted poster
A wanted poster (or wanted sign) is a poster distributed to let the public know of a person whom authorities wish to apprehend. They generally include a picture of the person, either a photograph when one is available or of a facial composi ...
s are posted at all stations to help commuters identify known thieves.
COVID-19 measures
As a response to the COVID-19 pandemic
The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identified ...
, the line operated at a limited capacity when public transport operations resumed on June 1, 2020 after a three-month lockdown that halted the operations of public transport. The use of face masks (and later, face shields) became mandatory since the resumption of operations in June 2020. The use of face shields later became no longer mandatory in public transport in November 2021, except when an area is under the two highest levels of the alert level system. Social distancing
In public health, social distancing, also called physical distancing, (NB. Regula Venske is president of the PEN Centre Germany.) is a set of non-pharmaceutical interventions or measures intended to prevent the spread of a contagious dise ...
measures were also implemented. Since March 1, 2022, all railway lines are operating at a full capacity due to the de-escalation of Metro Manila
Metropolitan Manila (often shortened as Metro Manila; fil, Kalakhang Maynila), officially the National Capital Region (NCR; fil, link=no, Pambansang Punong Rehiyon), is the capital region, seat of government and one of three List of metrop ...
to the lowest of the five levels of the alert level system.
In addition, talking with other passengers and answering phone calls in trains has been prohibited in the system. The policy has also been implemented in all railway lines and forms of public transport.
The trains are regularly being disinfected
A disinfectant is a chemical substance or compound used to inactivate or destroy microorganisms on inert surfaces. Disinfection does not necessarily kill all microorganisms, especially resistant bacterial spores; it is less effective than ...
when the train arrives at a terminus. It takes three to five minutes for a train to be disinfected.
Ridership
The line is designed and was forecasted to carry 570,000 passengers daily. However, the line operates under its designed capacity. Before the pandemic, the line had a ridership of 200,000 passengers, but the ridership soon decreased in 2019 due to lack of trains and a power trip that closed three stations in October 2019 that was reopened in January 2021. The line served 33,267 passengers daily on average in 2021, with eight trains available for revenue service running at an operating speed of in 10 minute intervals.
Statistics
Fares and ticketing
The line, like all existing lines in Metro Manila, uses a distance-based fare structure, with fares ranging from fifteen to thirty pesos (34 to 60 U.S. cents), depending on the destination. Commuters who ride the line are charged ₱11 upon boarding. An additional ₱1 is charged for every kilometer travelled. For single journey ticket users, the fares are rounded up in multiples of ₱5.00. Meanwhile, the fares for Beep card users are rounded up to the nearest peso. Children below (the height of a fare gate) may ride for free.
Fares are free of charge every March 8 (International Women's Day
International Women's Day (IWD) is a global holiday list of minor secular observances#March, celebrated annually on March 8 as a focal point in the women's rights, women's rights movement, bringing attention to issues such as gender equality, ...
; free rides exclusive for women), June 12 ( Independence Day), and December 30 ( Rizal Day) on limited time slots.
The line, along with the MRT Line 3 and Philippine National Railways lines also offered free rides to students starting July 1, 2019, but students must register to avail a student pass. However, the free rides for students stopped in 2020 due to the COVID-19 pandemic
The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identified ...
as distance learning was implemented as a mode of learning during the pandemic. Free rides for students resumed on August 22, 2022, but ended on November 5 due to operating losses incurred. Instead, the line offers a 20% fare discount
Discount may refer to:
Arts and entertainment
*Discount (band), punk rock band that formed in Vero Beach, Florida in 1995 and disbanded in 2000
* ''Discount'' (film), French comedy-drama film
* "Discounts" (song), 2020 single by American rapper Cu ...
for students that wish to avail.
Types of tickets
Magnetic tickets (2003–2015)
Four types of tickets exist: a single-journey (one-way) ticket whose cost is dependent on the destination, a stored-value (multiple-use) ticket for 100 pesos, a discounted stored value ticket (multiple-use) which can only be availed by senior citizens and disabled persons, and a single journey ticket for employees (one-way) which is exclusive for LRTA employees only. The single-journey ticket and the single journey ticket for employees is valid only on the date of purchase. Meanwhile, the stored-value ticket and the discounted stored-value ticket is valid for four years from date of purchase.
Tickets come in four incarnations: one bearing the portrait of Gloria Macapagal Arroyo
Maria Gloria Macaraeg Macapagal Arroyo (, born April 5, 1947), often referred to by her initials GMA, is a Filipino academic and politician serving as one of the Deputy Speaker of the House of Representatives of the Philippines, House Deputy Spe ...
, which have since been phased out, although some tickets have been recycled due to ticket shortages, one with the Line 1 Line 1 or 1 line may refer to:
Public transport Africa
* Line 1 (Algiers Metro), Algeria
* Cairo Metro Line 1, Egypt
Asia China
* Line 1 (Beijing Subway)
* Line 1 (Changchun Rail Transit)
* Line 1 (Changsha Metro)
* Line 1 (Changzhou Metro)
* L ...
third generation train inauguration together with Japanese Prime Minister Shinzo Abe
Shinzo Abe ( ; ja, 安倍 晋三, Hepburn romanization, Hepburn: , ; 21 September 1954 – 8 July 2022) was a Japanese politician who served as Prime Minister of Japan and President of the Liberal Democratic Party (Japan), President of the Lib ...
, one with the LRT-MRT closing the loop project design with Gloria Macapagal Arroyo again in the picture, and one with a picture of the Hyundai Rotem EMUs used in the line which featured different designs for the single journey and stored value tickets with the former having a picture of the train unloading, while the latter is a flipped concept art of the train.
In the past, Line 3 borrowed tickets from LRTA rather than recycling the old "Erap tickets", due to the same ticket shortages.
Despite the common practice for regular passengers to purchase several stored-value tickets at a time, the line barely has ticket shortages due to the inter-compatibility of tickets with the LRTA lines and the steady release of new tickets that addresses the problem.
Although the LRTA, together with Line 3 has experimented with the Flash Pass as an alternative ticketing system in the past, this was phased out in 2009.
Beep cards (2015–present)
A unified ticket system was introduced in 2015 to replace the magnetic tickets. The Beep is a new contactless smart card
A contactless smart card is a contactless credential whose dimensions are credit-card size. Its embedded integrated circuits can store (and sometimes process) data and communicate with a terminal via NFC. Commonplace uses include transit ticke ...
to replace the old magnetic tickets. Similar to the previous magnetic tickets, the Beep cards have two types: single-journey tickets and stored value cards. The tickets can be bought at any stations or at the ticket vending machines
A ticket machine, also known as a ticket vending machine (TVM), is a vending machine that produces paper or electronic tickets, or recharges a stored-value card or smart card or the user's mobile wallet, typically on a smartphone. For instance, ...
. A trial run for the Beep cards started on July 20, 2015 at Legarda station
Legarda station is an elevated Manila Light Rail Transit (LRT) station situated on Line 2. The station is located in Sampaloc in Manila and is named after Legarda Street, where the station sits above it. The street in turn is named after Benito ...
, becoming the first of the three railway lines in Metro Manila
Metropolitan Manila (often shortened as Metro Manila; fil, Kalakhang Maynila), officially the National Capital Region (NCR; fil, link=no, Pambansang Punong Rehiyon), is the capital region, seat of government and one of three List of metrop ...
to do so.
A shortage of the stored value cards was reported in 2022 due to the ongoing global chip shortage caused by the Russian invasion of Ukraine
On 24 February 2022, in a major escalation of the Russo-Ukrainian War, which began in 2014. The invasion has resulted in tens of thousands of deaths on both sides. It has caused Europe's largest refugee crisis since World War II. ...
.
Fare adjustment
Adjusting passenger fares has been employed by the LRTA as a means to boost flagging ridership figures, and the issue of fares both historically and in the present continues to be a political issue.
Current fare levels were set on July 19, 2021, two weeks after the east extension opened. It is a 5-peso fare increase from the maximum fare that was set along with the new fare levels on January 4, 2015. The fare hike was delayed for several years despite inflation and rising operating costs. Prior to the 2015 fare adjustment of LRT and MRT, fares for the line were never increased. These lower fares—which are only slightly more expensive than jeepney fares—are financed through large government subsidies
A subsidy or government incentive is a form of financial aid or support extended to an economic sector (business, or individual) generally with the aim of promoting economic and social policy. Although commonly extended from the government, the ter ...
amounting to around ₱45 per passenger, and which for both the MRTC ''and'' the LRTA reached ₱75 billion between 2004 and 2014. Without subsidies, the cost of a single trip is estimated at around ₱60.
Rolling stock
The line runs heavy rail vehicles made in South Korea
South Korea, officially the Republic of Korea (ROK), is a country in East Asia, constituting the southern part of the Korea, Korean Peninsula and sharing a Korean Demilitarized Zone, land border with North Korea. Its western border is formed ...
by Hyundai Rotem
Hyundai Rotem (founded in 1977) is a South Korean company that manufactures rolling stock, defense products and plant equipment. It is a part of the Hyundai Motor Group. Its name was changed from Rotem to Hyundai Rotem in December 2007 to ref ...
powered by Toshiba
, commonly known as Toshiba and stylized as TOSHIBA, is a Japanese multinational conglomerate corporation headquartered in Minato, Tokyo, Japan. Its diversified products and services include power, industrial and social infrastructure systems ...
-made VVVF inverters in a four-car configuration. The trains came in together with the fourth package during the system's construction. Trains have a capacity of 1,628 passengers, which is more than the normal capacity of the rolling stock of Lines 1 and 3. The trains are capable of running at a maximum design speed of , but only run at a maximum operational speed of .
Trains in the line prominently use wrap advertising
Wrap advertising or a vehicle wrap is known as the marketing practice of completely or partially covering (wrapping) a vehicle in a vinyl material, which may be for a color change, advertising or custom delivery. The result of this process is e ...
.
In 2017, the entire train fleet was retrofitted with the TUBE (formerly known as PARDS), a passenger information system
A passenger information system, or passenger information display system, is an automated system for supplying users of public transport with information about the nature and the state of a public transport service through visual, voice or other m ...
powered by LCD screens installed near the ceiling of the train that shows news, advertisements, current train location, arrivals and station layouts.
In 2019, the train ventilation was upgraded to replace the aging air-conditioning units and to alleviate complaints of the commuters for uncomfortable hot rides. Two years later, three train sets underwent refurbishment and resulted in new fitted propulsion systems and train monitoring systems from Woojin Industrial Systems.
The LRTA is also acquiring 14 additional train sets by 2020 to augment the existing 18 sets, due to the expected increase of passengers ahead of the East Extension, and the West Extension. The purchase however was delayed to 2022.
Included in the design-and-build contract of the west extension is the procurement of five four-car train sets.
Depot
The line maintains an at-grade depot in Barangay Santolan in Pasig, near Santolan station in the side of Barangay Calumpang in Marikina. The depot occupies approximately of space and serves as the headquarters for light and heavy maintenance of the line.[ Due to its location in a flood-prone area, the depot was raised above ground level.][ It is connected to the mainline network by a ]spur line
A branch line is a phrase used in railway terminology to denote a secondary railway line which branches off a more important through route, usually a main line. A very short branch line may be called a spur line.
Industrial spur
An industr ...
.
The depot is capable of storing 24 sets of electric multiple units, with the option to expand to include more vehicles as demand arises. They are parked on several sets of tracks, which converge onto the spur route and later on to the main network.
There are eight decommissioned 1000 class and one set of 1100 class trains formerly used in LRT-1 being stored in this depot due to the ongoing expansion of the Line 1 depot in Parañaque.
Other infrastructure
Signalling
The line uses a fixed block
Railway signalling (), also called railroad signaling (), is a system used to control the movement of railway traffic. Trains move on fixed rails, making them uniquely susceptible to collision. This susceptibility is exacerbated by the enor ...
system with automatic train control
Automatic train control (ATC) is a general class of train protection systems for railways that involves a speed control mechanism in response to external inputs. For example, a system could effect an emergency brake application if the driver ...
(ATC), which has three subsystems: automatic train protection (ATP), automatic train operation (ATO), and Rail9000 automatic train supervision (ATS). The ATO subsystem automatically drives the trains, while the opening and closing of doors is controlled by an onboard train attendant. The ATP
ATP may refer to:
Companies and organizations
* Association of Tennis Professionals, men's professional tennis governing body
* American Technical Publishers, employee-owned publishing company
* ', a Danish pension
* Armenia Tree Project, non ...
system, meanwhile, maintains safe operations and monitors the train's speed. Lastly, the Rail9000 ATS system is located at the operations control center at the line's Santolan Depot, which directs train operations and monitors the train movement along the line. Other components of the signalling system includes train detection
Railway signalling (), also called railroad signaling (), is a system used to control the movement of railway traffic. Trains move on fixed Rail tracks, rails, making them uniquely susceptible to collision. This susceptibility is exacerbated b ...
through track circuits and Westrace MK1 computer-based interlocking.
The signalling equipment were manufactured by Westinghouse Signals. Westinghouse Signals, later renamed as Westinghouse Rail Systems, became part of Siemens Mobility after its acquisition by Siemens in 2013.
The signalling system is set to be upgraded with the replacement of the system's communication link and the upgrading of the interlocking module. The project started on February 15, 2022.
Tracks
The rails are rails designed to the UIC 54 rail profile. The rails are supported by concrete plinths.
Plans and proposals
West extension
A extension of the line to the Manila North Harbor in Tondo, Manila has been proposed. It was first announced in August 2006, when the LRTA announced its intention to extend the line eastward to Antipolo and westward to the Pier 4 of the Manila North Harbor. It was approved by the National Economic and Development Authority
The National Economic and Development Authority (NEDA; fil, Pambansang Pangasiwaan sa Kabuhayan at Pagpapaunlad) is an independent cabinet-level agency of the Philippine government responsible for economic development and planning. It is headed ...
(NEDA) on May 19, 2015. The construction of this extension would create three stations, one near the Tutuban PNR station, one in Divisoria, and one near the North Port Passenger Terminal in Manila North Harbor's Pier 4 which would serve as its terminus. In an interview, LRTA Administrator Ret. Gen. Reynaldo Berroya stated that they are aiming to finish the project by 2022 to 2023.
The total project cost is estimated to be ₱10.12 billion. In 2019, WESTRAX Joint Venture was awarded the contract for the consultancy services for the project.
In October 2019, the project was under bidding process, consisting 3 stations, , , and , with the project scheduled to be completed by 2024.
On August 27, 2020, the Light Rail Transit Authority published the bidding documents for the design-and-build contract for the west extension. According to the documents, the turn back area after the station will have three tracks; two of which are the main tracks and one serves as a pocket track. The three stations will feature side platform
A side platform (also known as a marginal platform or a single-face platform) is a railway platform, platform positioned to the side of one or more railway tracks or guideways at a railway station, tram stop, or bus rapid transit, transitway. ...
s.
The project was originally planned to be funded through a public-private partnership (PPP) scheme, in line with the Marcos administration's policy to use the said scheme to complete various infrastructure projects. The contract would have also covered the procurement of five new four-car trains, along with the maintenance of the line and the refurbishment of the trains. However, it was decided that the government will instead fund the project through the national budget.
Extension to Cogeo
The Japan International Cooperation Agency
The is a governmental agency that delivers the bulk of Official Development Assistance (ODA) for the government of Japan. It is chartered with assisting economic and social growth in developing countries, and the promotion of international c ...
has also proposed for a second phase of the east extension to extend the line to Cogeo and downtown Antipolo. There are provisions at the end of the current rail line at Antipolo station for an extension. Two proposals were presented by JICA: a , one-station underground extension, and a , five-station extension, both originating from the Antipolo station.
As of November 2022, the feasibility study is nearing its conclusion. The extension would have three stations and the alignment is still being finalized.
Privatization
The privatization of the operations and maintenance of Line 2 was planned by the then-Department of Transportation and Communications (DOTC; later the Department of Transportation as part of the agency's improvement and modernization of the railway lines in the Philippines. The bidding process for this project begun on September 13, 2014. In this project, the interested companies were required to submit pre-qualification documents and submit a bid proposal if the company is qualified for the bidding. In January 2015, four companies submitted pre-qualification documents for the project. The bidders included Aboitiz Equity Ventures
Aboitiz Equity Ventures (AEV) is a Philippine holding company based in Metro Manila, with roots from Cebu City. The conglomerate operates in six major industries: Power, Banking and Financial Services, Food, Infrastructure, and Data Science and A ...
with SMRT Transport Solutions (Aboitiz Equity Ventures
Aboitiz Equity Ventures (AEV) is a Philippine holding company based in Metro Manila, with roots from Cebu City. The conglomerate operates in six major industries: Power, Banking and Financial Services, Food, Infrastructure, and Data Science and A ...
and SMRT International Pte Ltd. through SMRT Trains), DMCI Holdings with Tokyo Metro
The is a major rapid transit system in Tokyo, Japan, operated by the Tokyo Metro Co. With an average daily ridership of 6.84 million passengers, the Tokyo Metro is the larger of the two subway operators in the city; the other being the Toe ...
, Light Rail Manila 2 Consortium ( RATP and Metro Pacific
Metro Pacific Investments Corporation (MPIC) is a Philippine-based unit investment holding company of First Pacific Company Limited through Metro Pacific Holdings, Inc. MPIC through its subsidiaries, provides water, sanitation, and sewerage se ...
), and San Miguel Corporation
San Miguel Corporation, abbreviated as SMC, is a Philippine multinational conglomerate headquartered in Mandaluyong, Metro Manila. The company is one of the largest and most diversified conglomerates in the Philippines. Originally founded i ...
with Korea Railroad Corporation. All bidders were pre-qualified for the bidding. However, the project would eventually be shelved in 2016.
In 2017, it was reported that the Metro Pacific Investments Corporation was interested in a possible auction for the privatization of the line. The plan to privatize the operations and maintenance of the line was restarted in October 2019, following a power trip that damaged two rectifiers. Since then, no new reports have surfaced about this plan as of 2021.
Capacity expansion and upgrade
Due to the aging of the line, a capacity expansion project for the line was announced in April 2022. The project would include upgrades to the trains, signalling, telecommunications, power supply, overhead systems, railway tracks, and other system equipment. The project is still under the stages of the procurement of a consultant for the project, which would assess the current condition of the line.
TÜV Rheinland has been shortlisted for the list of consultants and is the only consultant to be shortlisted in June 2022.
Like the west extension, the upgrading of the train cars would be funded through a public-private partnership scheme. The contract would also cover the maintenance of the line and the construction of the west extension.
Incidents
2000s
* On July 12, 2006, at 7:30 AM, a lightning
Lightning is a naturally occurring electrostatic discharge during which two electrically charged regions, both in the atmosphere or with one on the ground, temporarily neutralize themselves, causing the instantaneous release of an average ...
struck the power cables near the Santolan station, interrupting train operations.
* On August 15, 2006, at 8:45 AM, a lightning struck the power cables, which is the second incident reported in a month. Normal operations were restored before 12:00 noon.
* On May 20, 2008, at 6:45 PM, a lightning struck the line's power supply, interrupting operations.
* On July 23, 2008, a power interruption disrupted the line operations, leaving the Santolan-Cubao section only operational.
2010s
* On June 11, 2011, a man jumped in front of a moving train at the Araneta Center-Cubao station, leaving the man severely injured. This forced the line operations to be suspended.
* On May 9, 2017, at 4:03 PM, a tree fell to the tracks at the Anonas area, causing the line's operations to be disrupted and a 2000 class train nearby was hit. The Department of Public Works and Highways local office was doing roadworks at the site of the incident when they accidentally hit a tree that fell on the tracks. Partial operations between Recto and V. Mapa were implemented, until the line's operations were suspended an hour later. The incident area was cleared and full operations resumed at 7:41 PM.
* On May 30, 2018, a damaged cable between J. Ruiz and V. Mapa stations caused limited operations between Santolan and Araneta Center-Cubao stations at 11:46 AM. Normal operations resumed at 7:46 PM.
* On May 15, 2019, at 7:27 PM, an air pressure glitch halted the operations of Line 2. Operations resumed at 7:47 PM.
* On May 18, 2019, trainset no. 13 broke down between Anonas and Katipunan stations at 2:00 PM and was subsequently moved to the pocket track of Anonas waiting to be towed back to the depot. However at 9:15 PM, the train was reported to have moved on its own towards the eastbound track going towards Santolan station. At this time, trainset no. 18 was going towards Santolan station from Cubao station on the same track. The runaway train was reported via radio but eventually ran into train No. 13, injuring 34 passengers, with none in critical condition. The driver of one of the two trains was reported to have jumped out of his train before the collision, sustaining wounds and bruises. Revenue operations were suspended to give way to maintenance checks, and normal operations resumed at 10:47 AM the next day. Trainset no. 18 returned to service in June 2021, while Trainset no. 13 returned to service in September 2021.
* On October 2, 2019, at 9:43 am, a lightning
Lightning is a naturally occurring electrostatic discharge during which two electrically charged regions, both in the atmosphere or with one on the ground, temporarily neutralize themselves, causing the instantaneous release of an average ...
struck the station, causing the power transformers at the and stations to trip and disrupt the power supply. The operations of the line were suspended for safety checks and normal operations resumed at 10:11am.
* On October 3, 2019, another power trip caused rectifier substations located between Anonas and Katipunan stations and in the Santolan depot to catch fire at around 11 in the morning, cutting the line's power supply in the area. Line operations from Recto to Santolan were suspended at 11:24 am, and passengers were evacuated from the line with no injuries. The LRTA, MMDA and the Philippine Coast Guard immediately deployed shuttle buses to help ferry stranded passengers. Partial operations between Cubao and Recto stations resumed on October 8, 2019, while Santolan, Katipunan and Anonas Stations are expected to reopen after nine months. The initial estimated amount of damages is at around PHP428 million. Due to the incident, the Light Rail Transit Authority claimed full operations would be back in 2 to 3 months. As the initial deadline was not met the three stations that were caught in a power trip were expected to resume services at the end of June 2020. However, this deadline was also not met due to delays brought by the COVID-19 pandemic
The COVID-19 pandemic, also known as the coronavirus pandemic, is an ongoing global pandemic of coronavirus disease 2019 (COVID-19) caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2). The novel virus was first identified ...
, rescheduled for the first quarter of 2021. Finally, the three stations were reopened, albeit in partial speed, on January 22, 2021. The reopening was made possible by a temporary power supply system installed in the damaged portion while the proper systems are still on order and awaiting delivery.
2020s
* On October 8, 2020, a fire broke out in the electrical room at causing the operations to be suspended at 5:10am. The fire damaged the station's uninterruptible power supply
An uninterruptible power supply or uninterruptible power source (UPS) is an electrical apparatus that provides emergency power to a load when the input power source or mains power fails. A UPS differs from an auxiliary or emergency power syste ...
. Normal operations returned a few hours later.
* On April 7, 2021, the operations of the LRT-2 were halted due to an unspecified "technical problem." Normal operations resumed at 10:50 AM.
* On May 24, 2021, an unspecified technical problem at Santolan station limited the LRT-2 operations between Recto and Araneta Cubao stations. Full operations resumed the following day.
* On June 17, 2021, a technical problem at the line's control center halted the LRT-2 operations. Normal operations resumed at 4:59pm.
* On August 16, 2021, operations were suspended between Cubao and Santolan due to an unspecified technical problem. Operations resumed at 4:20pm.
* On September 17, 2021, a defective catenary wire at the east extension area caused disruptions in operations. A shuttle service between Santolan and Antipolo was implemented at 9:43 AM. On the same day, the line's operations were briefly suspended at 11:36 AM after a tangled t-shirt was seen hanging at the contact wires between Cubao and Anonas stations. Operations with the shuttle service resumed at 11:49 AM, while full end-to-end operations were known to be resumed the following day.
* On October 9, 2021, an entangled balloon
A balloon is a flexible bag that can be inflated with a gas, such as helium, hydrogen, nitrous oxide, oxygen, and air. For special tasks, balloons can be filled with smoke, liquid water, granular media (e.g. sand, flour or rice), or li ...
was discovered between V. Mapa and Pureza stations, causing the line's operations to be temporarily suspended. The operations resumed after 30 minutes.
* On November 3, 2021, operations of Line 2 were suspended at 6:00 AM due to a signalling system problem. Operations resumed at 7:57 AM.
* Multiple signalling system problems were reported on November 6, 14, and 25, 2021.
* On July 31, 2022, at 8:00 a.m., operations of Line 2 were limited from Cubao to Antipolo stations due to a broken catenary wire between Legarda and Pureza stations. Full operations resumed the following day at 5:00 a.m.
Notes
References
External links
Official LRTA website on LRT Line 2
{{Urban Rail Transit in ASEAN
Line 2 Line 2 or 2 Line may refer to:
Public transport Americas
*2 (New York City Subway service), a rapid transit service in the A Division of the New York City Subway
*2 Line (Sound Transit), a light rail line in Seattle, Washington
*Line 2 Bloor–Dan ...
Manila Light Rail Transit System Line 2
Transportation in Rizal
Railway lines opened in 2003
2003 establishments in the Philippines
Transportation in Luzon
1500 V DC railway electrification