Athens Metro
   HOME

TheInfoList



OR:

The Athens Metro () is a
rapid transit Rapid transit or mass rapid transit (MRT) or heavy rail, commonly referred to as metro, is a type of high-capacity public transport that is generally built in urban areas. A grade separation, grade separated rapid transit line below ground su ...
system serving the
Athens Athens ( ) is the Capital city, capital and List of cities and towns in Greece, largest city of Greece. A significant coastal urban area in the Mediterranean, Athens is also the capital of the Attica (region), Attica region and is the southe ...
urban area in Greece. Line 1 opened as a single-track conventional steam railway in 1869 and was electrified in 1904. Beginning in 1991, Elliniko Metro S.A. constructed and extended Lines 2 and 3. It has significantly changed Athens by providing a much-needed solution to the city's traffic and
air pollution Air pollution is the presence of substances in the Atmosphere of Earth, air that are harmful to humans, other living beings or the environment. Pollutants can be Gas, gases like Ground-level ozone, ozone or nitrogen oxides or small particles li ...
problem, as well as revitalising many of the areas it serves. Extensions of existing lines are under development or tender, like the Line 2 extension to Ilion where tender started in 2023, as well as a new Line 4, whose central section began construction in October 2021. The Athens Metro is actively connected with the other means of public transport, such as buses, trolleys, the Athens Tram and the Athens Suburban Railway. The Athens Metro is hailed for its modernity (mainly the newer lines 2, 3), and many of its stations feature works of art, exhibitions and displays of the archaeological remains found during its construction. Photography and video-taking is permitted across the whole network and street photographers often work in Athens Metro. This was the only metro system in
Greece Greece, officially the Hellenic Republic, is a country in Southeast Europe. Located on the southern tip of the Balkan peninsula, it shares land borders with Albania to the northwest, North Macedonia and Bulgaria to the north, and Turkey to th ...
, before the Thessaloniki Metro began operations on 30 November 2024.


History


Piraeus–Kifissia Railway (Line 1)

Until 28 January 2000, Line 1 was the only rapid-transit line in Athens. The Athens and Piraeus Railway Company (SAP) opened a steam single-track mixed cargo and passenger railway line on 27 February 1869 and was run between and . It was electrified in 1904. On 4 February 1885 Lavrion Square-Strofyli steam narrow gauge single-track mixed cargo and passenger railway line opened and was run at the time from Attiki Square to Kifissia through Iraklio. These originally mixed cargo and passenger railway lines gradually merged and converted to a rapid-transit system. The section between Kifissia and Strofyli was abandoned. From 1869 to 1926 the line was operated by SAP. From 1926 to 1976 the line was operated by Hellenic Electric Railways (EIS). In 1976 the EIS was nationalized and renamed Athens-Piraeus Electric Railway Company (ISAP), which continued to operate what became line 1 of the Athens Metro until 16 June 2011.


1990s projects

Since the current Line 1 opened, the government has proposed many expansions to the subway network, including a 1963 plan for a fourteen-line subway network. Construction of Lines 2 and 3 began in November 1992 to decrease traffic congestion and improve Athens' air quality by reducing its smog level. Both lines were constructed underground. Lines 2 and 3, built by Attiko Metro S.A. and operated until 2011 by Attiko Metro Operations Company, are known respectively as the red and blue lines and were inaugurated in January 2000. Line 3 was extended to the Eleftherios Venizelos International Airport in summer 2004, and Line 2 was extended to Anthoupoli and Elliniko in 2013.


Consolidation

Until 17 June 2011, the operational management of the Athens Metro network was similar to that of the
London Underground The London Underground (also known simply as the Underground or as the Tube) is a rapid transit system serving Greater London and some parts of the adjacent home counties of Buckinghamshire, Essex and Hertfordshire in England. The Undergro ...
network before the creation of the London Passenger Transport Board and the absorption of the Metropolitan Railway on 1 July 1933. The Greek government attempted to absorb ISAP into Attiko Metro operation company under Law 2669/1998 so the latter would be responsible for the whole network, but this initiative failed. Athens Metro operations were consolidated when the Greek government enacted Law 3920/2011, replacing AMEL, ISAP and Tram S.A. with Urban Rail Transport S.A. (STASY S.A.) (), a subsidiary of OASA S.A. (Athens Urban Transport Organisation S.A.).


Timeline


Infrastructure


Lines and stations

The Athens Metro consists of three lines totalling and 66 stations: Line 1 (Green) is long with 24 stations, Line 2 (Red) is long with 20 stations, and Line 3 (Blue) is long with 24 stations. STASY owns and operates 62 of the 66 stations: three other stations (, and ) belong to GAIAOSE and the station belongs to the operator of the Athens International Airport. The system has five interchanges, at , , , and , allowing all three to interchange with each other at least once. Each line also has at least one connection with the Athens Suburban Railway, and the Athens Tram. Line 2 is entirely underground. Line 1 is mostly overground, with an underground section spanning between the Monastiraki and Attiki stations, and an additional underground station (Kato Patisia) in central Athens. Line 3 is mostly underground; Trains that run an overground route are only those with the airport as final destination. The overground section of Line 3, east of the tunnel portal near , is open. In the tunnel sections up and down lines share a common tunnel, except for approaches to stations with an island platform (such as Egaleo). Train maintenance facilities are located at Attiki, Faliro, Irini, Piraeus, Kifissia and Thissio for Line 1, and Doukissis Plakentias, Eleonas and Sepolia for Lines 2 and 3. The Athens Metro's three lines carried approximately 1,353,000 passengers daily in 2010. A network map of the Athens Metro system, that includes the three current lines, the under construction line 4, the tramway, the suburban railway and all the future under design extensions.


Rolling stock

The network uses
standard gauge A standard-gauge railway is a railway with a track gauge of . The standard gauge is also called Stephenson gauge (after George Stephenson), international gauge, UIC gauge, uniform gauge, normal gauge in Europe, and SGR in East Africa. It is the ...
electric trains which in most places run on 750  V DC third rail, but the section of Line 3 running to the airport requires trains which can use overhead lines of 25 kV AC, 50 Hz. The Athens Metro classifies rolling stock by "batch" for Line 1 and "generation" for Lines 2 and 3 because ISAP and AMEL used different classification systems for rolling stock before consolidation. Six types of rolling stock operate on the network, all equipped with third rail current collection systems; however, only seven second-generation trains have the necessary overhead line equipment to serve Line 3 from to . The eighth batch (introduced in 1983) is the oldest rolling stock in passenger service, while the third generation (introduced in 2013) is the latest rolling stock in passenger service. The eighth- and tenth-batch stock is externally similar, but the former has split-flap headsigns in Johnston typeface and a cream-and-green interior colour scheme. An extensive refurbishment programme is in progress for the 8th batch (as of 2023), and to cover for trains undergoing refurbishment, up to five 1st generation Line 2/3 trains have been borrowed to operate on Line 1. Line 1 halfsets have driving cabs at both ends, unlike the Line 2/3 halfsets which have a driving cab at the outer ends, but only basic driving apparatus for shunting purposes only at the inner ends; thus, they can only operate on their own inside depots.


Line 1


Lines 2 & 3


Signalling

Line 1 uses two-aspect red/green home signals, yellow/green distant signals and a passenger information system (PIS). The current system replaced 1950s-era semaphore signals. The automatic train protection (ATP) system of Line 1 was fully installed in 2023 which replaced the previous Indusi system. Lines 2 and 3 use the Alstom automatic train supervision system (ATS) and a passenger information system (PIS). Two-aspect red/white colour signals are used at points and junctions only.


Fares

Fares are prepaid, either as short term tickets valid for 90 minutes, 24 hours, three days, five days, or as long term tickets. As of September 2020, there are two types of fare products, the ATH.ENA Ticket and ATH.ENA Card, both of which are validated using a contactless system (by scanning the ticket or card at the electronic validating machines). The tickets are valid on all modes of public transport in Athens except on trains and buses to the airport. Passengers cannot buy a fare on board the bus. To travel to or from the airport, passengers may buy a one-way ticket for €9 or a 3-day ticket for €20 which also includes unlimited local trips and a return trip to the airport. Arrival at the airport without having paid the appropriate fare will incur a €72 fine, reduced to €36 if paid within 10 days. Term tickets are available in 30, 90, 180, and 365 day periods and are available only with a personalized ATH.ENA Card. Reduced fares are available for university students, seniors, disabled and persons under 18. During a fare control the passengers that are entitled to a reduced fare have to show ID card, student card or passport. Children under the age of 6 are entitled to travel for free with all means of transportation. On buses and trams the ticket or card must be validated only when entering the vehicle/car by scanning the ticket at the electronic validating machines. At metro or Suburban Railway stations, the ticket or card must be validated at the electronic gates when entering and exiting the station.


Archaeological excavations and exhibits

During construction of the metro tunnels, artifacts of archaeological interest were discovered and rescue archaeology was employed. Teams of archaeologists worked ahead of, then with, engineers for six years, protecting and recording archaeological finds (streets, houses, cemeteries, sanctuaries, public workshops, foundry pits, kilns, aqueducts, wells, cisterns, drains and sewage tunnels). This afforded new insight into the city's ancient topography, through unprecedented infrastructure development combined with the study and preservation of archaeological data. Exhibitions of ancient artifacts or replicas are found at a number of metro stations, including Monastiraki, Akropoli and Syntagma.


Future

The Athens Metro masterplan, as presented in October 2022, consists of the following projects: *The current Kifissia terminal will be demolished and rebuilt as an underground station. **The Development Plan refers it as Line 4 branch but there are unofficial plans that this branch is part of the future Line 5. If and when these projects are completed, the Athens Metro is expected to reach in length and serve a total of 110 stations by 2040.


Line 4

A fourth line is planned for the Athens Metro and it has been incorporated in the roadmap for the development and expansion of public transport in Athens since 2005. The new line in its totality will extend over a length of , adding thirty five (35) new stations to the Athens Metro system. The cost of the entire project is estimated at 3.3 billion EUR. The recommendation is for lighter rolling stock than the type used in existing lines of Athens Metro which would operate automatically without a driver. In November 2020, Alstom was chosen to supply the line with 20 4-car automated
Metropolis A metropolis () is a large city or conurbation which is a significant economic, political, and cultural area for a country or region, and an important hub for regional or international connections, commerce, and communications. A big city b ...
trains, operated under Urbalis 400 signalling system. The first phase of Line 4 will be between ''Alsos Veikou'' and ''Goudi'' stations, predicting fifteen (15) new stations and a length of of new track. An invitation to tender for the construction of the first phase of Line 4 was issued in September 2018. The construction started in mid to late-2021 and is scheduled to be completed in 2029 or 2030. The estimated cost for constructing the first phase of the new line is 1.51 billion EUR. Currently, the project of the first phase is considered to follow a PPP scheme which might be extended for constructing the whole new line. An alternative solution is a mixed funding between the EIB and the Greek State. It is also a high-profile candidate project to be included in the Juncker Plan of EU that will include also the second phase of Line 4 of Athens Metro. The European Investment Bank is allocating a €730 million loan over 30 years to finance the building of the first segment of the Line 4 metro, which will connect Alsos Veikou and Goudi. The initiative will also assist Athens by reducing the number of private automobiles on the road by 53 000, resulting in 318 tonnes fewer CO2 released daily.


Long-term plan


Extensions


Line 1

Since 2020 the northern extension has been decided to consist of an underground part (including a new underground Kifissia station) and the initial extension until Nea Erythrea, with the stations between Agios Stefanos and Nea Erythrea utilising the Suburban railways of OSE, with a further extension towards Varympompi Junction. When the topographical survey was done it was decided that for the Southern Extension there would be an underground diversion from the station of Thiseio branching out to 3,5km consisting of 4 stations: Ano Petralona, Plateia Davaki, Lofos Filaretou ending at Stavros Niarchos Foundation Cultural Center near Delta Falirou.


Line 2

The northern extension may consist initially of a 4.0 km (2.5 mi) line ( Anthoupoli to Agios Nikolaos) in 2031, with intermediate stations at Palatiani and Ilion (for Line 4). With a second phase (Aghios Nikolaos - Acharnai) , with intermediate stations at Kamatero and Zefyri (for Athens Suburban Railway trains). The southern extension may consist of a line from to
Glyfada Glyfada (, ) is a town and a suburb in the South Athens regional unit located in the Athens Riviera along the coast of Saronic Gulf. It is situated in the southern parts of the Athens#Athens Urban Area, Athens urban area. The area stretches from ...
, with intermediate stations at Ano Glyfada and Grigoriou Lampraki.


"Souflias Plan"

On 15 November 2008, Greek newspaper '' Ta Nea'' reported that the Greek government was considering a circular line from Ano Ilisia to Faros, via and , as part of a "" network. This proposal evolved to form part of what is now the long-term Athens Metro Future Regulatory Plan (or the Souflias plan) on 13 April 2009, which called for an network of eight lines and 200 stations. The Souflias plan was last revised in January 2012, and saw limited activity until October 2020, when Elliniko Metro announced that they were reconsidering some extensions from the plan, including the extension of Line 1 from to Nea Erythraia, the extensions of Line 2 to and
Glyfada Glyfada (, ) is a town and a suburb in the South Athens regional unit located in the Athens Riviera along the coast of Saronic Gulf. It is situated in the southern parts of the Athens#Athens Urban Area, Athens urban area. The area stretches from ...
and Line 6 from Melissia to Perama. In December 2021, a part of the southern branch of Line 6 was reconsidered as a branch of Line 1 from to the SNFCC in
Kallithea Kallithea (Greek language, Greek: Καλλιθέα, meaning "beautiful view") is a suburb in Athens#Athens Urban Area, Athens agglomeration and a municipality in South Athens (regional unit), south Athens regional unit. It is the eighth larges ...
, with intermediate stations at Hamosternas, Plateia Davaki, and Lofos Filaretou.


Line 5 (Haidari - Kalamaki)

Originally considered by the Souflias plan as line 7, but since the consideration of new branches for line 4 it has been reappeared and been renamed to line 5 and its part from Akadimia to Evangelismos being considered as an part of Line 4 with the lines spliting in Evangelismos, the line 4 part continuing until Goudi and the Line 5 one until Kalamaki.


See also

* Line 1 (Athens Metro) * Line 2 (Athens Metro) * Line 3 (Athens Metro) * Line 4 (Athens Metro) * Transport for Athens ** STASY * Thessaloniki Metro


Notes


References


External links


Athens Metro Map on Google earth with geolocation

Urban Rail Transport Company (STASY S.A.)Attiko Metro Company (Construction and Infrastructure)Athens Urban Transport Organisation (OASA S.A.)Athens metro guide
{{Urban transport in Greece Electric railways in Greece Underground rapid transit in Greece Rail transport articles in need of updating 750 V DC railway electrification 25 kV AC railway electrification 1869 establishments in Greece