HOME



picture info

Esenler (Istanbul Metro)
Esenler is a rapid transit station on the M1B line of the Istanbul Metro. The station is the on the M1B branch of the M1 line and is the first stop west of where the M1B splits from the M1A. The station is adjacent to the Esenler maintenance facility which was originally built in 1989. Plans to bring passenger service to Esenler existed since the mid-2000s when the station was built, but the municipality wasn't able to see the plans through. Esenler station was opened to the public on 22 February 2012, as part of the new M1B branch that would extend to Kirazlı and connect with the M3. The station design is unique as one platform is higher than the other and is in-between both tracks, despite being a side platform. This is so that the westbound track can pass over the tracks from the adjacent maintenance facility. Layout References {{Istanbul Metro navbox Istanbul metro stations Esenler Railway stations in Turkey opened in 2012 ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Istanbul Metro
The Istanbul Metro ( tr, İstanbul metrosu) is a rapid transit railway network that serves the city of Istanbul, Turkey. It is operated by Metro Istanbul, a company (formerly known as ''İstanbul Ulaşım A.Ş.'' before 2016), a public enterprise, controlled by the Istanbul Metropolitan Municipality. The oldest section of the metro is the M1 line, which opened in 1989; it now includes 111 stations in service, with 100 more under construction. The system consists of eight lines: the lines designated M1A, M1B, M2, M3, M6, M7 and M9 are on the European side of the Bosporus, while Lines M4 and M5 are on the Asian side. The European and Asian networks do not connect directly, but have been linked to each other through the Marmaray system since 2013. More Metro lines are under construction or planned: M8 (Bostancı-Parseller), M12 (60. Yıl Parkı-Kazım Karabekir) and the M14 (Altunizade-Kazım Karabekir) will be on the Asian side, while M11 (Gayrettepe-Istanbul Airport-H ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Rapid Transit
Rapid transit or mass rapid transit (MRT), also known as heavy rail or metro, is a type of high-capacity public transport generally found in urban areas. A rapid transit system that primarily or traditionally runs below the surface may be called a subway, tube, or underground. Unlike buses or trams, rapid transit systems are railways (usually electric railway, electric) that operate on an exclusive right-of-way (transportation), right-of-way, which cannot be accessed by pedestrians or other vehicles, and which is often grade-separated in tunnels or on elevated railways. Modern services on rapid transit systems are provided on designated lines between rapid transit station, stations typically using electric multiple units on rail tracks, although some systems use guided rubber tires, magnetic levitation (''maglev''), or monorail. The stations typically have high platforms, without steps inside the trains, requiring custom-made trains in order to minimize gaps between train a ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

M1 (Istanbul Metro)
Line M1, officially referred to as the M1 Yenikapı–Atatürk Airport/Kirazlı metro line ( tr, M1 Yenikapı–Atatürk Havalimanı/Kirazlı metro hattı), also known as the Istanbul Light Metro ( tr, Hafif Metro), is a rapid transit line of the Istanbul Metro. Opened in 1989, it was the first rapid transit line in Istanbul and Turkey and its opening started the revival of mass-transit in Turkish cities. The M1 consists of two train services, M1A and M1B. Both services run on the same line from Yenikapı to Otogar, where the M1B branches off to Kirazlı, while the M1A continues on the original line to Istanbul Atatürk Airport. The M1 has 23 stations in service, of which 11 are underground and 3 elevated, and the total length of the line is . Even though the M1 is fully grade separated, it is considered a light metro line, due to the relatively low passenger capacity compared to other lines of the system. In November 2014, the long-awaited extension from Aksaray to Y ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Side Platforms
A side platform (also known as a marginal platform or a single-face platform) is a platform positioned to the side of one or more railway tracks or guideways at a railway station, tram stop, or transitway. A station having dual side platforms, one for each direction of travel, is the basic design used for double-track railway lines (as opposed to, for instance, the island platform where a single platform lies between the tracks). Side platforms may result in a wider overall footprint for the station compared with an island platform where a single width of platform can be shared by riders using either track. In some stations, the two side platforms are connected by a footbridge running above and over the tracks. While a pair of side platforms is often provided on a dual-track line, a single side platform is usually sufficient for a single-track line. Layout Where the station is close to a level crossing (grade crossing) the platforms may either be on the same side of the cro ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  




List Of Railway Electrification Systems
This is a list of the power supply systems that are, or have been, used for tramway and railway electrification systems. Note that the voltages are nominal and vary depending on load and distance from the substation. Many modern trams and trains use on-board solid-state electronics to convert these supplies to run three-phase AC induction motors. Tram electrification systems are listed here. Key to the tables below * Volts: voltage or volt * Current: ** DC = direct current ** # Hz = frequency in hertz (alternating current (AC)) *** AC supplies are usually single-phase (1Ø) except where marked three-phase (3Ø). * Conductors: ** overhead line or ** conductor rail, usually a third rail to one side of the running rails. Conductor rail can be: *** top contact: oldest, least safe, most affected by ice, snow, rain and leaves. Protection boards are being installed on most top contact systems, which increases safety and reduces these affections. *** side contact: newer, safer, less af ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Overhead Line
An overhead line or overhead wire is an electrical cable that is used to transmit electrical energy to electric locomotives, trolleybuses or trams. It is known variously as: * Overhead catenary * Overhead contact system (OCS) * Overhead equipment (OHE) * Overhead line equipment (OLE or OHLE) * Overhead lines (OHL) * Overhead wiring (OHW) * Traction wire * Trolley wire This article follows the International Union of Railways in using the generic term ''overhead line''. An overhead line consists of one or more wires (or rails, particularly in tunnels) situated over rail tracks, raised to a high electrical potential by connection to feeder stations at regular intervals. The feeder stations are usually fed from a high-voltage electrical grid. Overview Electric trains that collect their current from overhead lines use a device such as a pantograph, bow collector or trolley pole. It presses against the underside of the lowest overhead wire, the contact wire. Current colle ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

M3 (Istanbul Metro)
The M3, officially referred to as the M3 Kirazli–Basaksehir Metro Line ( tr, M3 Kirazlı-Başakşehir Metro Hattı), is a , 9-station rapid transit line of the Istanbul Metro system on the European part of Istanbul, Turkey. It operates between Kirazlı-Bağcılar, extending the service of the M1B line from Yenikapı, to Başakşehir-Metrokent. The M3-line is colored light blue on station signs, route signs and the official rapid transit network map. Construction The construction of the line began in 2006 following the signing of the related contract in May of that year. By March 2009, the tunnels were completed. The rolling stock was delivered in January 2010, and in December of the same year, the first test run of the trains was accomplished. The line's operation rights were transferred from the İETT bus authority to Istanbul Ulaşım company in June 2011. After the line signalization system was completely installed in March 2012, test runs began in June 2012. On 11 Septemb ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Side Platform
A side platform (also known as a marginal platform or a single-face platform) is a railway platform, platform positioned to the side of one or more railway tracks or guideways at a railway station, tram stop, or bus rapid transit, transitway. A station having dual side platforms, one for each direction of travel, is the basic design used for double-track railway lines (as opposed to, for instance, the island platform where a single platform lies between the tracks). Side platforms may result in a wider overall footprint for the station compared with an island platform where a single width of platform can be shared by riders using either track. In some stations, the two side platforms are connected by a footbridge running above and over the tracks. While a pair of side platforms is often provided on a dual-track line, a single side platform is usually sufficient for a single-track line. Layout Where the station is close to a level crossing (grade crossing) the platforms may ei ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Istanbul M1B Line Symbol
) , postal_code_type = Postal code , postal_code = 34000 to 34990 , area_code = +90 212 (European side) +90 216 (Asian side) , registration_plate = 34 , blank_name_sec2 = GeoTLD , blank_info_sec2 = .ist, .istanbul , website = , blank_name = GDP (Nominal) , blank_info = 2021 , blank1_name =  - Total , blank1_info = US$ 248 billion , blank2_name =  - Per capita , blank2_info = US$ 15,666 , blank3_name = HDI (2019) , blank3_info = 0.846 () · 1st , timezone = TRT , utc_offset = +3 , module = , name = , government_type = Mayor–council government , governing_body = Municipal Council of Istanbul , image_shield = , established_date = 11 May 330 AD , image_m ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


Kirazlı (Istanbul Metro)
Kirazlı, or Kirazlı-Bağcılar, is an underground rapid transit complex of the Istanbul Metro and is serviced by lines M1B and M3. Kirazlı opened on 14 June 2013 as the southern terminus of the M3 line and eastern terminus of the M1B line. Since the M3 is considered a "continuation" of the M1B, passengers can transfer between these two lines for free. Kirazlı is the only station that offers free transfer in Istanbul. The station was inaugurated with a large ceremony in which officials from the Istanbul Municipality and Istanbul Ulaşım took part. On January 12, 2017, Lakhe Mashrapov, a man convicted of the 2017 Istanbul nightclub shooting The Istanbul nightclub shooting (also known as Reina massacre in Turkey) was a mass shooting incident on 1 January 2017 around 01:15 am local time, in which a terrorist shot and killed 39 people and wounded 79 others at the Reina nightclub in th ... was seen in the station and service to the station was suspended due to a search in a ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Yenikapı Transfer Center
Yenikapı Transfer Center ( tr, Yenikapı Aktarma Merkezi), referred to as Yenikapı, is an underground transportation complex in Istanbul. It is located in south-central Fatih in the neighborhood of Yenikapı, hence the name of the hub. The complex is right next to the, indefinitely closed, Yenikapı railway station and a short walk away from the Yenikapı Ferry Terminal and İDO ferry service. Yenikapı complex links two stations of Istanbul Metro to a railway station of the Turkish State Railways on the trans-Bosphorus Marmaray tunnel. Yenikapı is the largest rapid transit station in Turkey. History Construction of the Marmaray project started at Yenikapı in May 2004. The new Yenikapı station site was chosen to be just north of the existing railway station and would be built underground as part of the trans-Bosphorus tunnel. Yenikapı was expected to be completed in December 2009 but due to archaeological findings at the construction site delayed the project by four years. I ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]