Metronet (British Infrastructure Company)
   HOME

TheInfoList



OR:

Metronet Rail was an asset-management company responsible for the maintenance, renewal and upgrade of the infrastructure, including track, trains, signals, civils work and stations, on several
London Underground The London Underground (also known simply as the Underground or as the Tube) is a rapid transit system serving Greater London and some parts of the adjacent home counties of Buckinghamshire, Essex and Hertfordshire in England. The Undergro ...
lines. It was one of two infrastructure companies (the other being Tube Lines Ltd) in a public-private partnership (PPP) with the Underground. Metronet was founded in 1999 as a
consortium A consortium () is an association of two or more individuals, companies, organizations, or governments (or any combination of these entities) with the objective of participating in a common activity or pooling their resources for achieving a ...
of several private companies to bid for a PPP, the British Government having signaled its intention to transfer such activity from the public sector, although the bidding process was protracted by political disagreements. Metronet emerged as the successful bidder for two 30-year contracts covering various tube and sub-surface lines; starting in 2003, it was responsible for the maintenance, renewal, and upgrade of the infrastructure (track, trains, tunnels, signals, and stations) on a total of nine Underground lines. To encourage high reliability rates, financial deductions were incurred for poor performance at twice the rate of increase in revenue for improved performance. The PPP arrangement was closely scrutinised by the British government; by early 2005, both the
House of Commons The House of Commons is the name for the elected lower house of the Bicameralism, bicameral parliaments of the United Kingdom and Canada. In both of these countries, the Commons holds much more legislative power than the nominally upper house of ...
Transport Select Committee The Transport Select Committee is a select committee of the House of Commons in the Parliament of the United Kingdom. The remit of the committee is to examine the expenditure, administration and policy of the Department for Transport The D ...
and the
Public Accounts Committee A public accounts committee (PAC) is a committee within a legislature whose role is to study public audits, invite ministers, permanent secretaries or other ministry officials to the committee for questioning, and report on their findings subseque ...
were criticising the opaque nature of the PPP as well as questioning the value for money in comparison to a publicly run investment programme. In August 2004, Metronet was declared at fault for a May 2004 derailment at White City. In April 2005, the chief executive of Metronet was sacked following complaints that it had made £50million profit despite being behind on all its major works. During November 2006, Metronet were heavily criticised by the
Office of Rail Regulation The Office of Rail and Road (ORR) is a non-ministerial government department responsible for the economic and safety regulation of Britain's railways, and the economic monitoring of National Highways. ORR regulates Network Rail by setting its a ...
(ORR) over their performance from 2003 to 2006. In July 2007, the company admitted that it may have caused a Central Line train derailment near
Mile End Mile End is an area in London, England and is located in the London Borough of Tower Hamlets. It is in East London and part of the East End of London, East End. It is east of Charing Cross. Situated on the part of the London-to-Colchester road ...
. Following financial difficulties, the company was placed in
administration Administration may refer to: Management of organizations * Management, the act of directing people towards accomplishing a goal: the process of dealing with or controlling things or people. ** Administrative assistant, traditionally known as a se ...
during July 2007. In May 2008, the company's responsibilities were transferred back into public ownership under the authority of
Transport for London Transport for London (TfL) is a local government body responsible for most of the transport network in London, United Kingdom. TfL is the successor organization of the London Passenger Transport Board, which was established in 1933, and His ...
(TfL). In June 2009, the National Audit Office estimated that the failure of the Metronet PPP contract cost the taxpayer up to £410million, adding that "most of the blame for Metronet's collapse lay with the consortium itself." The company was wound up in December 2009. After TfL opted to buy out the
Tube Lines Tube Lines Limited, initially known as ''Infraco JNP'' (an amalgamation of infrastructure and company), was an asset-management company responsible for the maintenance, renewal and upgrade of the infrastructure, including track, trains, signals ...
consortium in 2010, all Underground infrastructure maintenance was thereafter managed in-house.


History


Background

During the mid 1990s, the
Conservative government Conservative or Tory government may refer to: Canada In Canadian politics, a Conservative government may refer to the following governments administered by the Conservative Party of Canada or one of its historical predecessors: * 1st Canadian Min ...
conducted a deep exploration of various options for involving the private sector in the operations of the
London Underground The London Underground (also known simply as the Underground or as the Tube) is a rapid transit system serving Greater London and some parts of the adjacent home counties of Buckinghamshire, Essex and Hertfordshire in England. The Undergro ...
. These options included its complete privatisation, akin to that of
British Rail British Railways (BR), which from 1965 traded as British Rail, was a state-owned company that operated most rail transport in Great Britain from 1948 to 1997. Originally a trading brand of the Railway Executive of the British Transport Comm ...
. This option was publicly opposed by the Labour Party, who stated in their '' New Labour, New Life for Britain''
manifesto A manifesto is a written declaration of the intentions, motives, or views of the issuer, be it an individual, group, political party, or government. A manifesto can accept a previously published opinion or public consensus, but many prominent ...
for the upcoming
general election A general election is an electoral process to choose most or all members of a governing body at the same time. They are distinct from By-election, by-elections, which fill individual seats that have become vacant between general elections. Gener ...
that the wholesale privatisation of the Underground was not the answer and proposed the use of a public-private partnership (PPP) arrangement instead. Following the election, the new Labour government promptly began work on setting up PPPs, stating that this would address the perceived period of underinvestment in the Underground. The selected model called for the operation of services on the Tube to remain in the hands of the public sector while the infrastructure (including the track, trains, tunnels, signals, and stations) would be leased to private firms for a 30 year period, during which they would enact various improvements. A public denial that the newly-formed railway infrastructure company
Railtrack Railtrack was a group of companies that owned the railroad, track, railway signalling, signalling, tunnels, bridges, level crossings and all but a handful of the railway station, stations of the Transport in England#Rail, British railway syste ...
would be involved in the PPP was issued by the government after it was made clear that some parties would refuse to bid if it was. By the turn of the century, senior figures within the government was strongly advocating for the implementation of these PPPs. Metronet was founded in 1999 as a consortium of companies to bid for PPP contracts. The equal shareholders in the venture were Atkins,
Balfour Beatty Balfour Beatty plc () is an international infrastructure group based in the United Kingdom with capabilities in construction services, support services and infrastructure investments. A constituent of the FTSE 250 Index, the company is active ac ...
,
Adtranz Adtranz was a multi-national rail transportation equipment manufacturer with facilities concentrated in Europe and the US. The company, legally known as ABB Daimler-Benz Transportation, was created in 1996 as a joint venture between ABB and Daim ...
(later
Bombardier Transportation Bombardier Transportation was a Canadian rolling stock and rail transport manufacturer, with headquarters in Toronto and Berlin. It was one of the world's largest companies in the rail vehicle and equipment manufacturing and servicing industry. ...
),
SEEBOARD Seeboard, formerly South Eastern Electricity Board (SEEB), was a British electricity company. The electrical power industry in the United Kingdom was nationalised by the Electricity Act 1947, when over 600 electric power companies were merged int ...
(later
EDF Energy EDF Energy is a British integrated energy company, wholly owned by the French state-owned EDF (Électricité de France), with operations spanning electricity generation and the sale of natural gas and electricity to homes and businesses throug ...
), and
Thames Water Thames Water Utilities Limited, trading as Thames Water, is a British private utility company responsible for the water supply and waste water Wastewater (or waste water) is water generated after the use of freshwater, raw water, drinking w ...
. To pay for the works, each company provided £70million of equity; a further £2billion was raised using bank loans, and £600million from the
European Investment Bank The European Investment Bank (EIB) is the European Union's investment bank and is owned by the 27 member states. It is the largest multilateral financial institution in the world. The EIB finances and invests both through equity and debt sol ...
. The consortium awarded contracts to its own shareholders, for example rolling stock contracts were awarded to
Bombardier Transportation Bombardier Transportation was a Canadian rolling stock and rail transport manufacturer, with headquarters in Toronto and Berlin. It was one of the world's largest companies in the rail vehicle and equipment manufacturing and servicing industry. ...
. This
closed shop A pre-entry closed shop (or simply closed shop) is a form of union security agreement under which the employer agrees to hire union members only, and employees must remain members of the union at all times to remain employed. This is different fr ...
supply chain approach was later criticised for causing high costs for the consortium.


Formation of the PPP

The bidding process was protracted by political factors, including public disagreements on the topic of PPPs between then-
Mayor of London The mayor of London is the chief executive of the Greater London Authority. The role was created in 2000 after the Greater London devolution referendum in 1998, and was the first directly elected mayor in the United Kingdom. The current ...
Ken Livingstone Kenneth Robert Livingstone (born 17 June 1945) is an English former politician who served as the Leader of the Greater London Council (GLC) from 1981 until the council was Local Government Act 1985, abolished in 1986, and as Mayor of Londo ...
and
Deputy Prime Minister A deputy prime minister or vice prime minister is, in some countries, a Minister (government), government minister who can take the position of acting prime minister when the prime minister is temporarily absent. The position is often likened to th ...
John Prescott John Leslie Prescott, Baron Prescott (31 May 1938 – 20 November 2024) was a British politician who served as Deputy Prime Minister of the United Kingdom from 1997 to 2007 and as First Secretary of State from 2001 to 2007. A member of the ...
. Furthermore, in the aftermath of the
Hatfield rail crash The Hatfield rail crash was a railway accident on 17 October 2000, at Hatfield, Hertfordshire. It was caused by a metal fatigue-induced derailment, killing four people and injuring more than 70. The accident exposed major stewardship shortcomi ...
, there was a climate of both public and political skepticism in the involvement of the private sector in transport infrastructure. During early 2001, Bob Kiley, the first commissioner of
Transport for London Transport for London (TfL) is a local government body responsible for most of the transport network in London, United Kingdom. TfL is the successor organization of the London Passenger Transport Board, which was established in 1933, and His ...
(TfL) and an outspoken critic of the prospective PPPs, was put in charge of the process. Kiley was also empowered to revise the terms of the prospective contracts; he promptly produced updated briefs for the PPPs, a move which thus necessitated the submission of revised bids. During May 2001, it was announced that both Metronet and Tube Lines had been selected as the preferred consortiums. Metronet emerged as the successful bidder for two 30-year contracts, covering various tube and sub-surface lines; specifically, the BCV (tube) lines contract involved the Bakerloo, Central, Victoria and Waterloo & City lines, while the SSL (sub-surface) lines contract covered
Circle A circle is a shape consisting of all point (geometry), points in a plane (mathematics), plane that are at a given distance from a given point, the Centre (geometry), centre. The distance between any point of the circle and the centre is cal ...
,
District A district is a type of administrative division that in some countries is managed by the local government. Across the world, areas known as "districts" vary greatly in size, spanning regions or county, counties, several municipality, municip ...
,
East London East London is the part of London, England, east of the ancient City of London and north of the River Thames as it begins to widen. East London developed as London Docklands, London's docklands and the primary industrial centre. The expansion of ...
, Hammersmith & City and Metropolitan lines. Separately, Tube Lines was awarded the contract for the other London Underground lines
Jubilee A jubilee is often used to refer to the celebration of a particular anniversary of an event, usually denoting the 25th, 40th, 50th, 60th, and the 70th anniversary. The term comes from the Hebrew Bible (see, "Old Testament"), initially concerning ...
, Northern and
Piccadilly Piccadilly () is a road in the City of Westminster, London, England, to the south of Mayfair, between Hyde Park Corner in the west and Piccadilly Circus in the east. It is part of the A4 road (England), A4 road that connects central London to ...
. Both Metronet and Tube Lines were colloquially referred to as "infracos"; there was repeated speculation that the two companies planned to merge. Contracts valued at around £17billion over the 30-year period were issued, under which these companies received around £660million each month from the Government, although this amount was subject to reductions if targets are not met. In April 2003, Metronet began to maintain, upgrade and renew London Underground infrastructure as the PPP came into force.


Commitments under the PPP

Under the terms of the PPP contracts, Metronet agreed to maintain London Underground infrastructure (track, trains, tunnels, signals, and stations) to the standards and performance levels set in the contract. Furthermore, Metronet committed to delivering substantial improvements to the network, by refurbishing, upgrading and renewing track, trains, tunnels, signals, and stations. To encourage high reliability, deductions suffered for poor performance were set at twice the rate of increase in revenue for improved performance. At a cost of £7billion, Metronet promised substantial investment during the first 7.5years of the contract (2003 to 2010): * 147 stations (including lifts and escalators) modernised or refurbished by 2012 * of track renewed and 166 points/crossings replaced * Upgrade and refurbishment of tunnels, bridges, embankments, track drainage and other civil structures * Refurbishment of existing rolling stock, as well as making them more reliable * 47 new trains with upgraded signalling on the
Victoria line The Victoria line is a London Underground line that runs between in South London, and in the east, via the West End of London, West End. It is printed in light blue on the Tube map and is one of the only two lines on the network to run comp ...
by 2012 (delivered as 2009 Stock) * 190 new air conditioned trains for the
District A district is a type of administrative division that in some countries is managed by the local government. Across the world, areas known as "districts" vary greatly in size, spanning regions or county, counties, several municipality, municip ...
,
Circle A circle is a shape consisting of all point (geometry), points in a plane (mathematics), plane that are at a given distance from a given point, the Centre (geometry), centre. The distance between any point of the circle and the centre is cal ...
, Hammersmith & City and Metropolitan lines by 2015 (delivered as S Stock) * 24 new
Bakerloo line The Bakerloo line () is a London Underground line that runs between in suburban north-west London and in south London, via the West End. Printed in brown on the Tube map, it serves 25 stations, 15 of which are underground, over . It runs par ...
trains by 2019 (cancelled following the collapse of the PPP)


Performance and criticism

In June 2004, the National Audit Office criticised the complexity of the PPP deals, noting they offered "the prospect, but not the certainty" of improvements. In August 2004, Metronet was declared at fault by an accident investigators' report into a May 2004 derailment at White City, for failing to implement sufficient safety checks despite being ordered to do so by TfL. During March 2005, the House of Commons
Transport Select Committee The Transport Select Committee is a select committee of the House of Commons in the Parliament of the United Kingdom. The remit of the committee is to examine the expenditure, administration and policy of the Department for Transport The D ...
noted that "Availability is the most important factor for Tube travellers. All the infracos needed to do to meet their availability benchmarks was to perform only a little worse than in the past. On most lines, they did not even manage that." That same month, the
House of Commons The House of Commons is the name for the elected lower house of the Bicameralism, bicameral parliaments of the United Kingdom and Canada. In both of these countries, the Commons holds much more legislative power than the nominally upper house of ...
Public Accounts Committee A public accounts committee (PAC) is a committee within a legislature whose role is to study public audits, invite ministers, permanent secretaries or other ministry officials to the committee for questioning, and report on their findings subseque ...
, charged with ensuring value for money in public spending, published a report concluding that it was "impossible to determine" whether the PPP was better value than a publicly run investment programme. In April 2005, the Commissioner of Transport for London, Bob Kiley, pressed for an urgent review of the PPP, describing its performance as "bordering on disaster". TfL also said that new technology promised by Metronet had yet to be seen — "We were supposed to be getting private sector expertise and technology with the PPP (Public Private Partnership) but instead they are just using the same old kit." One week later, the chief executive of Metronet was sacked, after complaints that the company had made £50million profit despite being behind on all its major works. By April 2005, it had started work on only 13 station refurbishments, instead of 32 as scheduled, and was more than a year behind on the refurbishment of 78 District line trains. It was also behind on its track replacement programme, having completed 28 km of the anticipated 48 km. During November 2006, Metronet were heavily criticised by the arbiter of the PPP, the
Office of Rail Regulation The Office of Rail and Road (ORR) is a non-ministerial government department responsible for the economic and safety regulation of Britain's railways, and the economic monitoring of National Highways. ORR regulates Network Rail by setting its a ...
(ORR) over their performance from 2003 to 2006. Specific analysis included the finding that Metronet had not performed in an economic or efficient manner, and had failed to follow good industry practice. The ORR also stated that Metronet would be held responsible for £750million in cost overruns. The other PPP consortium,
Tube Lines Tube Lines Limited, initially known as ''Infraco JNP'' (an amalgamation of infrastructure and company), was an asset-management company responsible for the maintenance, renewal and upgrade of the infrastructure, including track, trains, signals ...
, noted that they were delivering projects on time and on budget. In July 2007, Metronet admitted that it may have caused a Central Line train derailment near
Mile End Mile End is an area in London, England and is located in the London Borough of Tower Hamlets. It is in East London and part of the East End of London, East End. It is east of Charing Cross. Situated on the part of the London-to-Colchester road ...
, in which a train hit a fire blanket left by maintenance workers.


Administration

In April 2007, Mayor
Ken Livingstone Kenneth Robert Livingstone (born 17 June 1945) is an English former politician who served as the Leader of the Greater London Council (GLC) from 1981 until the council was Local Government Act 1985, abolished in 1986, and as Mayor of Londo ...
stated that Metronet could collapse due to a £750million overspend. In July 2007, it was reported that Metronet was "teetering on the brink of administration". The situation arose because it had received only £121million out of the £551million that was needed to cover cost over-runs. By contrast,
Tube Lines Tube Lines Limited, initially known as ''Infraco JNP'' (an amalgamation of infrastructure and company), was an asset-management company responsible for the maintenance, renewal and upgrade of the infrastructure, including track, trains, signals ...
, the other PPP consortium, had brought in almost all of its works on time and on budget. On 18 July 2007, the company was placed into
administration Administration may refer to: Management of organizations * Management, the act of directing people towards accomplishing a goal: the process of dealing with or controlling things or people. ** Administrative assistant, traditionally known as a se ...
. To enable its business activities to be kept going while the winding-up of the company was in progress, the British Government provided Metronet with £2billion in 2008. Following negotiations with Bombardier, Metronet modified contracts to allow for continued delivery of 2009 Stock and S Stock trains, while releasing Bombardier from its obligation to resignal the sub-surface lines.


Aftermath

On 27 May 2008, Metronet came out of administration, and its contracts and employees were transferred to TfL under two new temporary companies, LUL Nominee BCV Ltd and LUL Nominee SSL Ltd. On 3 December 2009, the PPP business of Metronet Rail became an integral part of London Underground. Some of the improvements promised by Metronet were delivered (such as new 2009 Stock and S Stock trains), however other improvements were cancelled or delayed. During early 2008, the
Department for Transport The Department for Transport (DfT) is a Departments of the Government of the United Kingdom, ministerial department of the Government of the United Kingdom. It is responsible for the English transport network and a limited number of transport ...
rejected claims that the PPP was to blame for the collapse of Metronet, and that it was "predominantly a corporate failure", with "structural weaknesses
hat A hat is a Headgear, head covering which is worn for various reasons, including protection against weather conditions, ceremonial reasons such as university graduation, religious reasons, safety, or as a fashion accessory. Hats which incorpor ...
led to its own downfall." In 2010, the House of Commons'
Public Accounts Committee A public accounts committee (PAC) is a committee within a legislature whose role is to study public audits, invite ministers, permanent secretaries or other ministry officials to the committee for questioning, and report on their findings subseque ...
reprimanded the
Department for Transport The Department for Transport (DfT) is a Departments of the Government of the United Kingdom, ministerial department of the Government of the United Kingdom. It is responsible for the English transport network and a limited number of transport ...
for its failure to heed National Audit Office warnings about the company's management. According to the report from the Public Accounts Committee, around £170million to £410m of taxpayer money was lost due to the failure of Metronet. The companies involved in the consortium collectively lost around £350million in the collapse. In May 2010, it was announced that TfL would buy out the
Tube Lines Tube Lines Limited, initially known as ''Infraco JNP'' (an amalgamation of infrastructure and company), was an asset-management company responsible for the maintenance, renewal and upgrade of the infrastructure, including track, trains, signals ...
consortium, formally ending the PPP. Commentators blamed the complex and "onerous" contracts for its failure. Combined with the takeover of Metronet, this meant that all maintenance was thereafter managed in-house, although TfL has continued to use a large number of private suppliers and contractors. By the beginning of 2011, with the formal liquidation process having been completed, the Metronet brand and group of companies had ceased to exist.


See also

* History of the London Underground *
Tube Lines Tube Lines Limited, initially known as ''Infraco JNP'' (an amalgamation of infrastructure and company), was an asset-management company responsible for the maintenance, renewal and upgrade of the infrastructure, including track, trains, signals ...
, the other PPP consortium responsible for London Underground infrastructure from 2003 to 2010