HOME

TheInfoList



OR:

The Green Line is a
light rail Light rail (or light rail transit, abbreviated to LRT) is a form of passenger urban rail transit that uses rolling stock derived from tram technology National Conference of the Transportation Research Board while also having some features from ...
system run by the
Massachusetts Bay Transportation Authority The Massachusetts Bay Transportation Authority (abbreviated MBTA and known colloquially as "the T") is the public agency responsible for operating most public transportation services in Greater Boston, Massachusetts. The MBTA transit network in ...
(MBTA) in the
Boston Boston is the capital and most populous city in the Commonwealth (U.S. state), Commonwealth of Massachusetts in the United States. The city serves as the cultural and Financial centre, financial center of New England, a region of the Northeas ...
,
Massachusetts Massachusetts ( ; ), officially the Commonwealth of Massachusetts, is a U.S. state, state in the New England region of the Northeastern United States. It borders the Atlantic Ocean and the Gulf of Maine to its east, Connecticut and Rhode ...
, metropolitan area. It is the oldest MBTA subway line, and with tunnel sections dating from 1897, the oldest subway in
North America North America is a continent in the Northern Hemisphere, Northern and Western Hemisphere, Western hemispheres. North America is bordered to the north by the Arctic Ocean, to the east by the Atlantic Ocean, to the southeast by South Ameri ...
. It runs underground through downtown Boston, and on the surface into inner suburbs via six branches on radial boulevards and grade-separated alignments. With an average daily weekday ridership of 101,000 in 2023, it is among the most heavily used light rail systems in the country. The line was assigned the green color in 1967 during a systemwide rebranding because several branches pass through sections of the Emerald Necklace of Boston. The four branches are the remnants of a large
streetcar A tram (also known as a streetcar or trolley in Canada and the United States) is an urban rail transit in which vehicles, whether individual railcars or multiple-unit trains, run on tramway tracks on urban public streets; some include s ...
system, which began in 1856 with the Cambridge Horse Railroad and was consolidated into the
Boston Elevated Railway The Boston Elevated Railway (BERy) was a Tram, streetcar and rapid transit railroad operated on, above, and below, the streets of Boston, Massachusetts and surrounding communities. Founded in 1894, it eventually acquired the West End Street R ...
several decades later. The branches all travel downtown through the
Tremont Street subway The Tremont Street subway in Boston's MBTA subway system is the oldest subway tunnel in North America and the third-oldest still in use worldwide to exclusively use electric traction (after the City and South London Railway in 1890, and Line 1 ...
, the oldest subway tunnel in North America. The Tremont Street subway opened its first section on September 1, 1897, to take streetcars off overcrowded downtown streets; it was extended five times over the next five decades. The streetcar system peaked in size around 1930 and was gradually replaced with trackless trolleys and
buses A bus (contracted from omnibus, with variants multibus, motorbus, autobus, etc.) is a motor vehicle that carries significantly more passengers than an average car or van, but fewer than the average rail transport. It is most commonly used ...
, with cuts as late as 1985. The new D branch opened on a converted commuter rail line in 1959. The Green Line Extension project extended two branches into Somerville and Medford in 2022.


Route description

The Green Line's core is the central subway, a group of tunnels which run through downtown Boston. The
Tremont Street subway The Tremont Street subway in Boston's MBTA subway system is the oldest subway tunnel in North America and the third-oldest still in use worldwide to exclusively use electric traction (after the City and South London Railway in 1890, and Line 1 ...
runs roughly north–south through downtown, with stations at , , , , and – all with connections to other lines of the MBTA subway system. The Boylston Street subway runs roughly east–west through the
Back Bay Back Bay is an officially recognized Neighborhoods in Boston, neighborhood of Boston, Massachusetts, built on Land reclamation, reclaimed land in the Charles River basin. Construction began in 1859, as the demand for luxury housing exceeded the ...
neighborhood, with stations at , , , and ; it connects to the Tremont Street subway at Boylston. The Huntington Avenue subway diverges from the Boylston Street subway at a flat junction west of Copley, running southwest, with stations at and . A branch of the Tremont Street subway, disused since 1962, runs south from Boylston to the former Pleasant Street incline. The Green Line has four western surface branches, each with a letter designation: *The B branch runs west in a tunnel from Kenmore, surfacing in the median of Commonwealth Avenue at . It runs on Commonwealth Avenue through
Boston University Boston University (BU) is a Private university, private research university in Boston, Massachusetts, United States. BU was founded in 1839 by a group of Boston Methodism, Methodists with its original campus in Newbury (town), Vermont, Newbur ...
, Allston, and Brighton to
Boston College station Boston College station is a light rail station on the MBTA Green Line B branch. It is located at St. Ignatius Square on the Boston College campus near the intersection of Commonwealth Avenue (Boston), Commonwealth Avenue and Lake Street, on the ...
. *The C branch runs southwest in a tunnel from Kenmore, surfacing in the median of
Beacon Street Beacon Street is a major east–west street in Boston, Massachusetts, and its western suburbs of Brookline, Massachusetts, Brookline and Newton, Massachusetts, Newton. It passes through many of Boston's central and western neighborhoods, includ ...
at . It runs on Beacon Street through Brookline to Cleveland Circle station. *The D branch diverges from the C branch tunnel southwest of Kenmore, surfacing at Fenway station. It runs though Brookline and Newton along the
grade-separated In civil engineering (more specifically highway engineering), grade separation is a method of aligning a junction of two or more surface transport axes at different heights ( grades) so that they will not disrupt the traffic flow on other tr ...
Highland branch (a former
Boston and Albany Railroad The Boston and Albany Railroad was a railroad connecting Boston, Massachusetts to Albany, New York, later becoming part of the New York Central Railroad system, Conrail, and CSX Transportation. The mainline is currently used by CSX for freight a ...
commuter rail Commuter rail or suburban rail is a Passenger train, passenger rail service that primarily operates within a metropolitan area, connecting Commuting, commuters to a Central business district, central city from adjacent suburbs or commuter town ...
line) to Riverside station. *The E branch runs southwest through the Huntington Avenue subway from Copley, surfacing in the median of Huntington Avenue at Northeastern University station. It runs along Huntington Avenue and South Huntington Avenue to , with the outer (west of ) in mixed traffic rather than a dedicated median. Until 1985, the line continued south through
Jamaica Plain Jamaica Plain is a Neighborhoods in Boston, neighborhood of in Boston, Massachusetts, United States. Settled by Puritans seeking farmland to the south, it was originally part of Roxbury, Massachusetts, Roxbury. The community seceded from Roxbur ...
to . B and C branch service terminates at Government Center, while D and E branch service continues north from downtown Boston. North of North Station, the line inclines up to the Lechmere Viaduct, which crosses the
Charles River The Charles River (Massachusett language, Massachusett: ), sometimes called the River Charles or simply the Charles, is an river in eastern Massachusetts. It flows northeast from Hopkinton, Massachusetts, Hopkinton to Boston along a highly me ...
with an elevated station at . The elevated
Lechmere station Lechmere station ( ) is a Massachusetts Bay Transportation Authority (MBTA) Green Line (MBTA), Green Line light rail station in Lechmere Square in East Cambridge, Massachusetts. It is located on the east side of Massachusetts Route 28, Monsign ...
is located on the Green Line Extension viaduct, which continues north to a flying junction with two branches: *The Union Square Branch runs west to Union Square station via the Fitchburg Line right-of-way. It is operated as part of the D branch. *The Medford Branch runs northwest to Medford/Tufts station via the Lowell Line right-of-way. It is operated as part of the E branch.


Former branches

The Green Line A branch was the northernmost of the branches, running from the Blandford Street portal (still used by the B branch), west to Watertown, mostly
street-running A street running train is a train which runs on a Railway track, track built on public streets. The rails are embedded in the roadway, and the train shares the street with other users, such as pedestrians, cars and cyclists, thus often being ref ...
. The bus replaced the streetcar line in 1969. The A branch diverged from Commonwealth Avenue west of Boston University and ran to a terminus in Watertown, across the Charles River from Watertown Square, until 1969. Although the route-letter scheme had been introduced two years prior to its closure, the "A" designation was never signed on streetcars to Watertown. It was, however, included in the destination signs on the Boeing-Vertol LRVs ordered in the mid-1970s, when reopening service to Watertown was under consideration. The "A" line tracks remained in non-revenue service to access maintenance facilities at Watertown until 1994. The Pleasant Street portal hosted two services in its final days. The to City Point ended in 1953, and the to Egleston was cut back to Lenox Street in 1956, cut back to the portal in 1961, and ended operation in 1962. Prior to that, the serviced Tremont Street to Dover Street and Washington Street, ending at , and last running in 1938. The last two routes to continue beyond the Canal Street portal both ran to Sullivan. The ran via Main Street, last running in 1948, and the via Bunker Hill Street last ran in 1949. Until 1997, trains continued to use the portal and its North Station surface station as a terminal. In addition to the lines that later became the E branch, the predecessors to the and split in Brookline, one branch running into the current "E" tracks and into the Boylston Street portal, and the other running up Brookline Street to end at Massachusetts Avenue station. These were truncated in 1932 into a shorter route from Brookline Village to the subway via the Boylston Street portal, which itself stopped running in 1938 (being cut back to Brigham Circle short-turn trips), three years before the closure of that portal. The last "foreign" cars to operate in the subway were those of the Eastern Massachusetts Street Railway, running from the Canal Street portal to the Brattle Loop at Scollay Square until 1935. It was then that the old Mystic River Bridge to Chelsea was closed to streetcars and the lines were replaced by bus service; the next year the
Boston Elevated Railway The Boston Elevated Railway (BERy) was a Tram, streetcar and rapid transit railroad operated on, above, and below, the streets of Boston, Massachusetts and surrounding communities. Founded in 1894, it eventually acquired the West End Street R ...
(BERy) bought the Eastern Mass Chelsea Division and through-routed it with its lines connecting to the East Boston Tunnel at Maverick.


Rolling stock

Like the three other MBTA subway lines, the line uses
standard gauge A standard-gauge railway is a railway with a track gauge of . The standard gauge is also called Stephenson gauge (after George Stephenson), international gauge, UIC gauge, uniform gauge, normal gauge in Europe, and SGR in East Africa. It is the ...
tracks. However, instead of heavy rail metro rolling stock, the Green Line uses modern streetcars (light rail vehicles) as heavy rail stock would be inappropriate for the surface branches with their numerous grade crossings.


Listing


Active fleet

Rolling stock :


Retired fleet

Only MBTA operated vehicles are included here, not cars from the Boston Elevated Railway era.


History


Early rolling stock

When it opened at the end of the 19th century, the Tremont Street subway was not intended as a full-scale rapid transit line (though it was built to
semi-metro The term semi-metro refers to a category of urban rail transport in which trams run partly on grade separation, separate tracks to avoid conflicts with other traffic, by using tunnels and elevated railway, viaducts. This type of transit is also ...
standards), but to allow ordinary streetcars to bypass the worst street congestion in downtown Boston. Operations by several different companies were eventually consolidated into the Boston Elevated Railway, which ran a mixture of car types. After receiving a test unit in 1937, the BERy began to standardize on
PCC streetcar The Presidents' Conference Committee (PCC) is a streetcar (tram) design that was first built in the United States in the 1930s. The design proved successful domestically, and after World War II it was licensed for use elsewhere in the world where ...
s, acquiring 320 units between 1941 and 1951 plus an additional 25 in 1959 to phase out the last older cars. Beginning in 1923, all streetcars on the system were painted orange for maximum visibility in traffic. In 1971, the MBTA began painting Green Line streetcars in a green and white scheme to match the new line name. Two older streetcars are on display on the unused outer inbound track at Boylston station, which formerly carried cars coming from the Pleasant Street portal. Car #5734, a Type 5 A-1 car built in 1924 and retired in 1959, is owned by the Seashore Trolley Museum, but resides semipermanently in Boston. PCC #3295, built in 1951 and retired in 1986, is owned by the MBTA. The cars were formerly used for fantrips, the most recent one being in 1998.


Boeing LRV

In the early 1970s,
light rail Light rail (or light rail transit, abbreviated to LRT) is a form of passenger urban rail transit that uses rolling stock derived from tram technology National Conference of the Transportation Research Board while also having some features from ...
—which had largely disappeared from North America after the slow decline of streetcar systems from the 1920s to the 1950s—was reintroduced as a method of
urban renewal Urban renewal (sometimes called urban regeneration in the United Kingdom and urban redevelopment in the United States) is a program of land redevelopment often used to address real or perceived urban decay. Urban renewal involves the clearing ...
less expensive than conventional metro systems. In 1971, as part of a program to supply further work to defense contractors as the
Vietnam War The Vietnam War (1 November 1955 – 30 April 1975) was an armed conflict in Vietnam, Laos, and Cambodia fought between North Vietnam (Democratic Republic of Vietnam) and South Vietnam (Republic of Vietnam) and their allies. North Vietnam w ...
wound down, the Urban Mass Transit Administration selected Boeing Vertol as systems manager for a project to design a new generic light rail vehicle. The UMTA hoped that this " US Standard Light Rail Vehicle" would jumpstart the development of transit lines just as the standardized PCC streetcars had done decades prior. Boston (with its older streetcar tunnel systems) and San Francisco (with a new Muni Metro streetcar tunnel being built as part of
BART Bay Area Rapid Transit (BART) is a rapid transit system serving the San Francisco Bay Area in California. BART serves List of Bay Area Rapid Transit stations, 50 stations along six routes and of track, including eBART, a spur line running t ...
construction) were chosen as the testbeds for this new rolling stock. The vehicle was designed as the largest rolling stock that would fit through the Tremont Street tunnel, the Muni Metro's
Twin Peaks Tunnel The Twin Peaks Tunnel is a light rail/streetcar tunnel in San Francisco, California. The tunnel runs under Twin Peaks (San Francisco), Twin Peaks and is used by the K Ingleside, L Taraval, M Ocean View and S Shuttle lines of the Muni Metro sys ...
, and
SEPTA SEPTA, the Southeastern Pennsylvania Transportation Authority, is a regional public transportation authority that operates bus, rapid transit, commuter rail, light rail, and electric trolleybus services for nearly four million people througho ...
's subway–surface lines tunnel. The new cars were faster—a top speed of versus the PCC's —and had an articulated middle section for higher capacity. Boeing began construction of 175 cars for the MBTA in May 1973. The first LRVs entered service on the D branch in December 1976 but were immediately beset with problems. Certain cars frequently derailed on tight turns in the Riverside, Boston College and Lechmere yards. Battery trays, air conditioners—mounted under the cars, continually drawing in dirt and debris from under the car when in the tunnels—and air compressors all suffered numerous failures; the plug-style doors had trouble sealing properly; and traction motors failed sooner than expected. Desperate for reliable rolling stock, in 1977 MBTA launched an overhaul program to extend the availability of its older PCC cars. A total of 34 cars, primarily out-of-service wrecks and parts cars, were rebuilt to as-new condition. , some of these rebuilt PCC cars still run on the
Mattapan Line The Mattapan Line (alternatively the Mattapan Trolley and historically the Ashmont–Mattapan High-Speed Line) is a partially grade separation, grade-separated light rail line which forms part of the Massachusetts Bay Transportation Authority, ...
. After years of fighting between the MBTA and Boeing-Vertol, both sides reached a settlement in 1979. MBTA was allowed to reject the final 40 SLRVs, and Boeing would return $40 million to MBTA for the cost of repairs and modifications to several cars.


Modern fleet

In the early 1980s, with a final settlement with Boeing in place, MBTA started looking for new equipment to supplement and replace the problematic LRVs. In 1980, the MBTA tested Canadian Light Rail Vehicles for three months to determine whether they could be used on the Green Line. The MBTA ultimately found them unsuitable. Ultimately, the MBTA purchased LRVs from the Japanese firm
Kinki Sharyo is a Japanese manufacturer of railroad vehicles based in Osaka. It is an affiliate company of Kintetsu Corporation. In business since 1920 as Tanaka Rolling Stock Works, and renamed The Kinki Sharyo Co., Ltd in 1945, they produce rolling stock f ...
. These Type 7 were designed with the best features of the US SLRV, the Canadian LRV, and the PCC cars. A total of 120 Type 7 vehicles were purchased, 100 were delivered between 1986 and 1988, and an additional 20 cars ordered and delivered in 1997. Low-floor LRVs were added starting in 1998, allowing for accessible boarding directly from slightly raised platforms. MBTA ordered 100 of these Type 8 cars from Italian company
AnsaldoBreda Hitachi Rail Italy S.p.A. is a multinational rolling stock manufacturer company based in Pistoia, Italy. Formerly AnsaldoBreda S.p.A., a subsidiary of state-owned Finmeccanica, the company was sold in 2015 to Hitachi Rail of Japan. After the dea ...
. The first Type 8s entered revenue service in March 1999, and quickly proved problematic and difficult to maintain: the first cars failed every , far short of the specified by the MBTA, and were prone to derailment at higher speeds as well as brake problems, echoing the problems with the Boeing stock. In December 2004, the MBTA canceled orders for the cars still to be delivered as part of the authority's nine-year, US$225 million deal with Breda. One year later, in December 2005 the MBTA announced that it had entered into a restructuring of the deal, reducing the order to 85 cars (with spare parts to be provided in lieu of the 15 remaining cars), and providing for the remaining payment under the original deal only if the cars met performance requirements. Construction of the last car under the order was completed on December 14, 2006. Ultimately, 10 additional cars would be assembled and delivered in late 2007, with five spare shells retained (95 cars in service). The MBTA was criticized for their failure to assess Bredas' reliability before entering into the deal, and during delivery. The agency was also forced to spend an additional to modify tracks to prevent derailments and the Type 8 fleet was unable to be used on the D branch (where cars reach full speed) after those modifications were complete in 2008. As the final Type 8s were delivered, the last of the Boeing-Vertol cars were retired in March 2007 and all except ten of the cars were scrapped. Of the remaining cars, six were sold to the US Government and are now in
Pueblo, Colorado Pueblo ( ) is a List of municipalities in Colorado#Home rule municipality, home rule municipality that is the county seat of and the List of municipalities in Colorado, most populous municipality in Pueblo County, Colorado, United States. The ...
for testing purposes, one was given to the Seashore Trolley Museum, and three were retained by the MBTA for work service. In 2006, as part of a legal settlement, the MBTA committed to always operate at least one low-floor car in each train, with no trains consisting only of Type 7 cars. Of the 120 Type 7 cars, 103 were overhauled by
Alstom Alstom SA () is a French multinational rolling stock manufacturer which operates worldwide in rail transport markets. It is active in the fields of passenger transportation, signaling, and locomotives, producing high-speed, suburban, regional ...
in
Hornell, New York Hornell is a Administrative divisions of New York#City, city in Steuben County, New York, Steuben County, New York, United States. The population was 8,259 at the 2020 census. The city is named after the Hornell family, early settlers. The City ...
. The work includes new propulsion systems, climate control systems and interiors as well as exterior work. The pilot car for the program left in October 2012 and was returned in November 2014, with the last car overhauled in April 2019.


=Type 9

= Twenty-four new Type 9 Green Line cars were delivered between 2017 and 2020. Revenue service began in late 2018 and all 24 cars were planned to enter service by the fall of 2019, although actual acceptance continued through 2021. The Type 9 cars will provide additional rolling stock to allow for Green Line Extension operations, and will not replace any of the existing fleet. The cars were made by CAF USA, Inc., with the shells and frames made in Spain, and final assembly and testing done at their plant in
Elmira, New York Elmira () is a Administrative divisions of New York#City, city in and the county seat of Chemung County, New York, United States. It is the principal city of the Elmira, New York, metropolitan statistical area, which encompasses Chemung County. ...
. , the first unit had been expected to enter passenger service in Spring 2018, with all 24 cars in service by the end of the year. The first Type 9 car, #3900, began revenue service on December 21, 2018.


Future fleet

Planning for a Type 10 fleet—which would replace all Type 7 and Type 8 cars in the mid-2020s—began in 2018 with plans for a fully
low floor Low or LOW or lows, may refer to: People * Low (surname) Low is an English language, English and Languages of Scotland, Scottish surname. It is also a common surname found among Overseas Chinese language, Chinese communities around the world. ...
fleet. At long, Type 10 cars would be significantly longer than the existing fleet, and carry twice as many passengers as existing cars. The MBTA released a request for proposals in December 2019, with notice to proceed expected to be given in 2021. In June 2021, the MBTA indicated that the initial order would be for 102 LRVs operating as single cars, with two-car trains deferred for a later project with federal funding. Manufacturer bids were due in July 2021. The MBTA awarded an $811 million contract to CAF USA on August 31, 2022, to manufacture 102 seven-segment Type 10 "Supercar" LRVs. Four pilot vehicles are to be delivered in spring 2026, with deliveries of two LRVs per month from spring 2027 to spring 2031. The contract included options for additional LRVs. As a separately-funded project, Lake Street Yard will be fully reconstructed to support Type 10 vehicles, with Riverside Yard and the GLX Vehicle Maintenance Facility also modified. When the Type 10 cars are delivered, the Type 9 fleet is expected to be transferred over to the
Mattapan Line The Mattapan Line (alternatively the Mattapan Trolley and historically the Ashmont–Mattapan High-Speed Line) is a partially grade separation, grade-separated light rail line which forms part of the Massachusetts Bay Transportation Authority, ...
, replacing the PCC streetcars.


Accessibility

The Red Line, Blue Line, and Orange Line run
rapid transit Rapid transit or mass rapid transit (MRT) or heavy rail, commonly referred to as metro, is a type of high-capacity public transport that is generally built in urban areas. A grade separation, grade separated rapid transit line below ground su ...
cars and use stations with high platforms level with the car floor providing easy access for the disabled. The Green Line originated as a streetcar line, and used a variety of streetcars before converting to light rail vehicles. Originally all the Green Line stations had platforms at track level, and passengers had to ascend several steps up into the vehicles. This limited accessibility for persons with disabilities. To address this issue and comply with changing federal and state laws, additional facilities have been added: * Wheelchair lifts have been provided at some stops. They are rolled up to the car door and the lift mechanism is operated using a hand crank. They are quite time-consuming to operate, causing significant delays when used during peak periods. * Short platforms level with car floors, accessed by ramps, were installed just before or after selected stations. Because the car door arrangement required a large gap between the platform and the car, a bridge plate attached to the raised platform had to be positioned after the train stopped with a door at that platform. * The MBTA has followed the worldwide trend of operating low-floor streetcars. Platforms are being raised slightly to about the height of a street curb. Low-floor cars have remotely controlled bridge plates at the center doors to allow wheelchairs and strollers to reach the car floor a few inches higher. , the D branch will be the first branch to be completely retrofitted with raised platforms as part of this program.


History

Beginning in the 1850s, Boston sprouted a large network of
horsecar A horsecar, horse-drawn tram, horse-drawn streetcar (U.S.), or horse-drawn railway (historical), is a tram or streetcar pulled by a horse. Summary The horse-drawn tram (horsecar) was an early form of public transport, public rail transport, ...
lines, the first public transit in the city. The
West End Street Railway The West End Street Railway was a Tram, streetcar company that operated in Boston, Boston, Massachusetts and several surrounding communities in the late nineteenth century. Originally an offshoot of a land development venture, the West End rose ...
was created by the state legislature in 1887 to build a single line, but soon consolidated many of the existing lines into a single privately owned system with consistent fares and route designations. The Allston – Park Square line (which served the general area of the A branch) was the first section to be converted to electric traction in 1889. It used modified existing horsecars outfitted with Frank J. Sprague's revolutionary electrical equipment, which had first been demonstrated the previous year in
Richmond, Virginia Richmond ( ) is the List of capitals in the United States, capital city of the Commonwealth (U.S. state), U.S. commonwealth of Virginia. Incorporated in 1742, Richmond has been an independent city (United States), independent city since 1871. ...
. In 1897, the West End Street Railway property was handed over to the Boston Elevated Railway in the form of a 24-year lease, and the companies were ultimately combined. By the early 1890s, the sheer quantity of streetcars during peak periods was clogging the streets of downtown Boston. The Tremont Street subway, the first passenger subway in North America, was opened in stages in 1897 and 1898, with underground stations at Boylston, Park Street, Scollay Square, Adams Square, and Haymarket. The Main Line Elevated was run through the tunnel from 1901, displacing through-running streetcars, until it was rerouted to its own Washington Street Tunnel in 1908, and the streetcars were returned to the Tremont tunnel. Though initially intended merely to clear streetcars from the busiest sections of downtown streets, the Tremont Street subway became useful as a rapid transit service in its own right. The 1912 completion of the Causeway Street Elevated and Lechmere Viaduct extended grade-separated service to Lechmere Square in Cambridge, and in 1922 the Lechmere transfer station was built. In 1914, the Boylston Street subway opened as a westward extension to just short of Kenmore Square, and in 1933 Kenmore station and short tunnel extensions towards two surface lines were added. In 1941, the Huntington Avenue subway and its two additional underground stations removed the last surface streetcars from downtown Boston. Beginning in the 1930s, the massive surface streetcar system was " bustituted" with buses and trackless trolleys which had lower operating costs and more flexible routes. As the 1950s closed out, the only remaining streetcar lines were the Watertown Line, Commonwealth Avenue Line, Beacon Street Line, Arborway Line, and the Lenox Street Line plus several short turn services. In 1959, the
Boston and Albany Railroad The Boston and Albany Railroad was a railroad connecting Boston, Massachusetts to Albany, New York, later becoming part of the New York Central Railroad system, Conrail, and CSX Transportation. The mainline is currently used by CSX for freight a ...
's Highland Branch was converted to the Riverside Line, a fully grade-separated suburban service. In 1961, the last through service to Lenox Street via the Pleasant Street portal ended, though a Pleasant Street – Boylston shuttle continued for one more year. In 1963, part of the original subway was rebuilt under Government Center, abandoning and partially demolishing Adams Square station. In 1947, the now-bankrupt BERy was replaced by the public Metropolitan Transit Authority (M.T.A.). The new agency was unpopular, even spawning a popular protest song; in 1964, it was replaced with the
Massachusetts Bay Transportation Authority The Massachusetts Bay Transportation Authority (abbreviated MBTA and known colloquially as "the T") is the public agency responsible for operating most public transportation services in Greater Boston, Massachusetts. The MBTA transit network in ...
which had an expanded funding area to preserve suburban commuter rail lines. In 1967, as part of a systemwide rebranding that included new station names and color names for the transit lines, the remaining streetcar services were designated the "Green Line" because several of them traveled near the Emerald Necklace park system. The streetcar lines were given letter designations: "A" to the Watertown Line, "B" to the Commonwealth Avenue Line, "C" to the Beacon Street Line, "D" to the Riverside Line, and "E" to the Arborway Line. The Watertown Line ran mostly in mixed traffic after diverging from Commonwealth Avenue; it was permanently replaced with buses in 1969. The section of the Arborway Line past Heath Street was "temporarily" – ultimately permanently – bustituted in 1985. In 2001, with new low-floor streetcars entering service, the MBTA began retrofitting underground stations and major surface stops with low raised platforms for accessibility for all. In 2004, the Causeway Street Elevated was replaced with a new tunnel under the Boston Garden, which consolidated the Orange Line and Green Line at a new North Station "superstation", while continuing to connect to Commuter Rail service north of Boston. The name "Green Line" was assigned in 1967 as part of a major reorganization of the MBTA system's branding. In the 1970s, the Green Line and all other MBTA lines were re-evaluated by the Boston Transportation Planning Review for region-wide efficacy and future modernization alternatives initiated as far as physical plant and operating measures.


Operations and signaling

, each of the four branches operate on 7- to 9-minute headways during weekday peak hours, and 8- to 12-minute headways at other times. Vehicle usage ranges from 45 trains (90 cars) to 62 trains (124 cars). Unlike the MBTA's heavy rail subway lines, the Green Line has only limited central control and monitoring. This also means that it has lagged behind the other three rail lines in the availability of countdown signs and "next train" arrival information. The line is signalled with advisory wayside signals, except on surface portions in street medians or in-street running. Wayside signal territory stretches from Lechmere to the surface portals at Kenmore, and along the entire length of the D–Riverside branch. There are no automatic protection devices, but the cars have track brakes, giving the ability to stop quickly under control of the operator. Interlockings are controlled through a wayside Automatic Vehicle Identification (AVI) system that relies on the operator properly entering the destination manually on a roto-wheel in the train cab at the beginning of a run. The line is monitored from the Operations Control Center (OCC). Responsibility for controlling service is shared by the control room and field personnel along the right of way. Track circuit and signal indications are not transmitted to the operational personnel sites. In lieu of track circuit indications, the AVI system is displayed in the control room to provide a periodic update to train position wherever AVI detectors exist. The AVI system user interface was solely text based until the current control room was opened, in which a new schematic display based on AVI data was instituted. Track circuit indications are available digitally in signal houses at the Park Street interlocking, at the new North Station interlocking, and at the new Kenmore interlocking, but are not transmitted to OCC. In January 2013, the MBTA announced plans to add full vehicle location tracking on the Green Line for countdown signs and smartphone applications, including using AVI data in the tunnels and GPS receivers on the surface lines. The first real-time data—location data on the surface lines—became available in October 2014. Full tracking was expected by early 2015. The MBTA typically runs two-car trains at all times. The last scheduled use of one-car trains on weekdays was in March 2007. Three-car trains were added on the B and D branches in 2010 – their first use since 2005 – and a four-car train was tested in April 2011. In March 2011, the number of three-car trains was substantially increased, including use on the E branch. However, three-car trains suffered from reliability problems and slow boarding. The use of three-car trains ended in March 2016.


Positive train control

The MBTA approved an $82.6 million contract in May 2019 for a
train protection system A train protection system is a railway technical installation to ensure safe operation in the event of human error. Development Train stops The earliest systems were train stops, as still used by the New York City Subway, the Toronto rapid ...
for the Green Line. The system would enforce red signals and automatically stop a train if it approached another train too closely. The project was 28% complete by December 2021; installation of in-vehicle electronics was scheduled to be complete by September 2023, with wayside installation complete in June 2024 and full operation that December. A reallocation of funds in January 2022 shortened the project timeline, with completion expected in 2023. However, in January 2023, an NTSB report found that the project had been delayed to June 2025. The MBTA cancelled the contract in June 2024 citing a lack of progress and an inability by the contractor to complete the project. The MBTA worked with a different contractor to develop the GLTPS-2 system in two phases. Phase 1, expected to be installed on the existing Type 7, Type 8, and Type 9 fleet by the end of 2025, will be an operator warning system with alarms that trigger when a train is exceeding speed limits or is at risk of imminent collision with another train. Phase 2, which will be installed only on the Type 9 and future Type 10 fleet, adds automatic enforcement by braking and is planned to be finished by June 2028. A $112.5 million contract to install the system was approved in February 2025.


Turnarounds

Aside from the terminal stations, several locations have turnaround loops or crossover switches where trains can reverse direction for short turns. One of these, where northbound trains can turn southbound, is regularly used as the downtown terminal for two of the branches: * At , a loop under City Hall Plaza. , this is the terminal of the B and C branches. Several other loops and crossovers are not used in regular revenue service but may be used during construction work or service disruptions, or for non-revenue trains, with some having been regularly used as terminals in the past: * At , a pair of pocket tracks allow reversing. * At Government Center, the Brattle Loop allows southbound trains to turn northbound, however, this loop is currently only used during service disruptions. * At , a loop connects the inner tracks. The MBTA plans to add a crossover to allow through movements from the terminating (inner) northbound platform at Park Street are expected to increase capacity and reliability. * At , a loop allows eastbound (inbound) C and D branch trains to turn westbound. * On the B branch, a pocket track at allows trains to reverse in either direction. It is sometimes used to reverse westbound trains to provide extra service in the subway. Occasionally-used crossovers are located at , , and east of . * On the C branch, occasionally-used crossovers are located at and . * On the D branch, occasionally-used crossovers are located west of , , , , , and . At Reservoir, the spur tracks to Reservoir Carhouse have platforms for short turn trains. * On the E branch, crossovers are located at , , and , along with a siding at Northeastern. The Brigham Circle crossover is frequently used for short turns during traffic congestion on the street-running section of the line.


Location tracking

The Red, Orange, and Blue lines have block signalling systems that make tracking the location of trains easier. Signs in most station on those lines began to display real-time train information in late 2012 and early 2013, while data feeds have been available for smartphone applications since 2010. However, the wayside signalling system used in the Green Line's tunnels and the D branch does not provide for that level of tracking, nor do the basic stop/go signals used on the street-level branch lines. In January 2013, the MBTA announced plans to provide full tracking data for the Green Line by 2015, allowing use of smartphone applications and in-station countdown signs. The $13.4 million system is funded by MassDOT; it uses existing Automatic Vehicle Identification (AVI) systems plus additional sensors in the tunnels, and GPS receivers on the surface sections. In September 2013, the MBTA announced that "Next Train" signs would be unveiled at Kenmore that month. On October 23, 2014, location tracking data became available for Green Line trains above ground. Arrival predictions for surface stations – including the activation of countdown signs along the D branch – and underground tracking and predictions were to be rolled out in two phases by early 2015. In March 2015, the MBTA announced that enough AVI equipment had been installed to allow the release of some underground data by April. Most underground data was live by August, but trains near Park Street and Boylston waited until September. The first predictive countdown signs on the Green Line were activated at Newton Centre and Newton Highlands on April 24, 2015, followed shortly by other D branch stations. Countdown signs at Kenmore and Hynes were activated in August 2015. Signs at Copley and Arlington plus eastbound-only signs from Boylston through Science Park were activated in October 2015. The final set of signs – those on the westbound platforms of Science Park through Boylston – were activated in January 2016. Because holding and short-turning trains at the downtown terminals makes time-based predictions unreliable, the signs instead show how many stops away a train is.


Projects


Somerville/Medford extension

The Green Line Extension (GLX) project added two new branches into the northern suburbs of Somerville and Medford. The project opened in two phases in 2022 at a total cost of $2.28 billion. The rebuilt
Lechmere station Lechmere station ( ) is a Massachusetts Bay Transportation Authority (MBTA) Green Line (MBTA), Green Line light rail station in Lechmere Square in East Cambridge, Massachusetts. It is located on the east side of Massachusetts Route 28, Monsign ...
and the Union Square Branch to opened on March 21, 2022, as an extension of the D branch (briefly the E branch). The Medford Branch opened to on December 12, 2022, as an extension of the E branch, with intermediate stations at , , , and . The total project cost is estimated to be $2.28 billion: $0.996 billion from the federal government and $1.28 billion from the state. Daily ridership on the extension is projected to be 45,000 by 2030. The GLX begins at the north end of the Lechmere Viaduct, with a new elevated line continuing north for about parallel to the O'Brien Highway. The former surface-level Lechmere station was replaced by an elevated station on the new alignment. The two branches split with an aerial flying junction on the Red Bridge viaduct in the Inner Belt area. The Union Square Branch runs west from Red Bridge, sharing the Fitchburg Line right of way. The Medford Branch runs northwest from Red Bridge, sharing the Lowell Line right of way. Like the existing D branch, the new branches are fully grade-separated, with no
level crossing A level crossing is an intersection where a railway line crosses a road, Trail, path, or (in rare situations) airport runway, at the same level, as opposed to the railway line or the road etc. crossing over or under using an Overpass#Railway, o ...
s. A new vehicle storage yard and maintenance facility is located in the Inner Belt area, with leads from both branches at Red Bridge. An extension of the Somerville Community Path runs along the Medford Branch south of Lowell Street, with a high bridge carrying it above the Red Bridge viaduct. An extension north from Lechmere was first proposed in the 1920s, and again several times during the 20th century. To settle a lawsuit with the Conservation Law Foundation to mitigate increased automobile emissions from the Big Dig, the Commonwealth of Massachusetts agreed in 1990 to extend the Green Line from Lechmere to Medford Hillside through Somerville and Medford, two suburbs underserved by the MBTA relative to their population densities, commercial importance, and proximity to Boston. After delays in planning, the state agreed in 2006 to complete the project by 2014. The preferred alternative from the 2009 Draft Environmental Impact Report added the Union Square Branch; the Medford Branch terminus was set as College Avenue, with a potential future extension to . The planned completion was delayed to 2018 in 2011, and to 2020 in 2014. A groundbreaking ceremony was held in December 2012. The project was expected to cost about $2.2 billion, with half of that paid by the
Federal Transit Administration The Federal Transit Administration (FTA) is an agency within the United States Department of Transportation (DOT) that provides financial and technical assistance to local public transportation systems. The FTA is one of ten modal administration ...
(FTA). However, in 2015 it became clear that the project would cost $3 billion, putting its future in doubt. The project was value engineered to reduce its cost: station designs were simplified, several bridge reconstructions eliminated, the Community Path extension shortened, and the maintenance facility reduced in size. The FTA approved the modified $2.3 billion plan on April 4, 2017. The contract was rebid with a provision for the optional restoration of six of the elements deleted in the 2016 plan. The winning bid, selected in November 2017, included six optional elements, including canopies and additional elevators at stations, public art, a full-size vehicle maintenance facility, and the full extension of the Community Path to East Cambridge. Construction reached 20% completion in November 2019; it was over 50% completed by October 2020, and 80% by June 2021.


Accessibility renovations

The majority of the Green Line opened by 1959, long before the 1990
Americans with Disabilities Act The Americans with Disabilities Act of 1990 or ADA () is a civil rights law that prohibits discrimination based on disability. It affords similar protections against discrimination to Americans with disabilities as the Civil Rights Act of 1964, ...
mandated that new construction be fully accessible. The MBTA began modifying Red, Orange, and Blue Line stations for accessibility in the late 1980s; however, Green Line stations were not modified until the late 1990s, when the Type 8 vehicles were under construction. The MBTA began the Light Rail Accessibility Program in 1996. Because modifying the numerous stations all at once would be prohibitively expensive, the MBTA designated "key stations" – largely those with high ridership or bus connections – for prioritization. Riverside station was completely rebuilt with raised accessible platforms around 1998. and (both of which already had elevators from previous projects) were outfitted with portable lifts for temporary accessibility around 2000, as were and ten surface stations. Between 2001 and 2003, 16 surface stations (4 on the B branch, 4 on the C branch, 3 on the D branch, and 5 on the E branch) were retrofitted with raised platforms. The 13 B, C, and E branch stations collectively cost $32 million. Construction of raised platforms was completed at Park Street and Haymarket around 2003; Prudential was also reconstructed that year by the developer of
111 Huntington Avenue 111 Huntington Avenue is a skyscraper on Huntington Avenue in Boston, Massachusetts, United States. It is part of the Prudential Center complex that also houses the Prudential Tower. Completed in 2002, the tower is tall and houses 36 floors. ...
. The fully accessible underground "superstation" at North Station opened in 2004. Wooden mini-high platforms, allowing level boarding on older Type 7 LRVs, were installed at eight Green Line stations in 2006–07 as part of the settlement of '' Joanne Daniels-Finegold, et al. v. MBTA''. Renovations for accessibility were completed at in 2009, and in 2010, and in 2011. A two-year closure of ended in 2016 with the opening of the accessible transfer station. As part of the Green Line Extension, Lechmere was replaced by a fully accessible elevated station in 2022. Reconstruction work on Symphony is expected to take place from 2025 to 2028. (with renovations in design) and are the other remaining inaccessible stations in the central subway. Other projects have moved towards full accessibility of the surface branches. was made accessible in 2006. Renovations completed in 2009 made accessible for the first time, and replaced the lifts at and . A reconstruction of (replacing lifts) was completed in 2022. Construction of two accessible stations ( and ) on the B branch to replace four non-accessible stations took place in 2021. Temporary work to make accessible was done in 2019, followed by the four remaining D branch stations in 2024; larger reconstructions of the five stations are planned for later in the 2020s. Several other surface accessibility projects are planned: *The nine remaining non-accessible B branch stations are to be reconstructed in 2025–2027. Consolidations will reduce the nine stops to six. *The nine remaining non-accessible C branch stations are to be reconstructed in 2025–2026. Consolidations will reduce the nine stops to seven. *The four remaining non-accessible E branch stations are to be reconstructed in 2027–2029. Consolidations will reduce the four stops to two.


Core Capacity Program

In the late 2010s, the MBTA began planning a capital project to meet future capacity needs that year on the Green Line. A study completed in 2018 settled on the size for Type 10 vehicles and evaluated infrastructure needed to support the new vehicles. In 2022, the MBTA entered the project development phase for the
Federal Transit Administration The Federal Transit Administration (FTA) is an agency within the United States Department of Transportation (DOT) that provides financial and technical assistance to local public transportation systems. The FTA is one of ten modal administration ...
Capital Investment Grants Program, which provides funding for "core capacity" projects on crowded sections of existing transit systems. , the MBTA intends to enter the engineering phase by mid-2025, with the full funding grant agreement expected in late 2028 and construction lasting through the mid-2030s. In April 2025, the MBTA Board approved plans for the $3.8 billion Core Capacity Program, of which half ($1.9 billion) would be federally funded. It includes: *Signal upgrades, new crossovers, and other work in the Central Subway *Systemwide overhead catenary relocation *Traction power improvements on the D Branch *Modifications to the Riverside, Reservoir, Lake Street, and Inner Belt yards *Accessibility and infrastructure work on the B and E branches *58 additional Type 10 vehicles *A test track between Chestnut Hill and Newton Centre for Type 10 vehicles *Upgrades to a Type 10 simulator for operators


Station listing

This listing includes only the Green Line section between and , which are served by multiple branches. For stops served by only one branch, see , , , and . All stations in the central subway have prepaid fare areas ( fare control).


Incidents and collisions

On May 28, 2008, two D branch trains collided in Newton. The operator of one of the trains was killed and numerous riders were taken to area hospitals with injuries of varying degrees of seriousness. While it was originally thought that cell phone use was responsible for the crash, the cause was officially determined to be an episode of micro-sleep caused by the driver's
sleep apnea Sleep apnea (sleep apnoea or sleep apnœa in British English) is a sleep-related breathing disorder in which repetitive Apnea, pauses in breathing, periods of shallow breathing, or collapse of the upper airway during sleep results in poor vent ...
. On May 8, 2009, two trolleys rear-end collided underground between Park Street and Government Center when the driver of one of the trolleys, 24-year-old Aiden Quinn, was text messaging his girlfriend while driving. Quinn had run through a red light before the crash, which injured 46 people. MBTA officials estimated that the cost of the crash was $9.6 million. A strict ban on cell phone usage by MBTA operators was later enacted. On October 8, 2012, two E branch trolleys collided in the 700 block of Huntington Avenue near Brigham Circle when one derailed into the other, injuring three people including a train operator. The next month on November 29, two trolleys collided at low speed at Boylston, injuring several dozen passengers. On March 10, 2014, a D branch trolley with passengers aboard derailed in the tunnel just west of Kenmore Station, near the flat junction between the "D" and "C" branches. A second train had to brake suddenly to avoid hitting the derailed train. Ten people were treated for moderate injuries. In October 2016, ''
The Boston Globe ''The Boston Globe,'' also known locally as ''the Globe'', is an American daily newspaper founded and based in Boston, Massachusetts. The newspaper has won a total of 27 Pulitzer Prizes. ''The Boston Globe'' is the oldest and largest daily new ...
'' reported that the Green Line had the highest number of derailments and collisions on light rail lines in the United States in 2015. The number of incidents had been increasing for several years due to deferred maintenance on tracks and wheels, which resulted in more low-speed derailments of Type 8 cars. On July 30, 2021, two B branch trains collided at , causing 25 injuries. On October 1, 2024, a train derailed near Lechmere, injuring seven people and disrupting service on the Green Line Extension. Regular service resumed on October 3. The
National Transportation Safety Board The National Transportation Safety Board (NTSB) is an independent U.S. government investigative agency responsible for civil transportation accident investigation. In this role, the NTSB investigates and reports on aviation accidents and inci ...
,
Federal Transit Administration The Federal Transit Administration (FTA) is an agency within the United States Department of Transportation (DOT) that provides financial and technical assistance to local public transportation systems. The FTA is one of ten modal administration ...
, and Massachusetts Department of Public Utilities are investigating the derailment. A preliminary NTSB report noted the train was going 36 mph in a 10 mph zone and passed through a double red signal that required a stop. The train passed through a switch that was still moving into position, causing part of the first truck of the lead car to go straight and the rest of the train into the diverging track and causing the derailment. On February 9, 2025, a E branch train crashed into an out of service train at East Somerville, injuring five people. In 2009, the
National Transportation Safety Board The National Transportation Safety Board (NTSB) is an independent U.S. government investigative agency responsible for civil transportation accident investigation. In this role, the NTSB investigates and reports on aviation accidents and inci ...
recommended that the Green Line be outfitted with
positive train control Positive train control (PTC) is a family of automatic train protection systems deployed in the United States. Most of the United States' national rail network mileage has a form of PTC. These systems are generally designed to check that trains a ...
to prevent collisions as part of its various crash investigations. The MBTA decided in 2012 not to implement PTC, estimating the cost at $645 million to $721 million. In 2015, as crashes continued to happen, the NTSB complained the agency was moving too slowly identifying a feasible alternative. In 2019, the MBTA awarded a contract to implement a similar safety system by 2024, at a cost of $170 million. A train would automatically brake if a driver violated a traffic signal, or if cameras or radar detected an obstacle. That contract was cancelled in June 2024. A new contract was awarded in February 2025 for a new system that would provide warnings to operators by the end of 2025, and enforce violations with automatically braking by mid-2028.


References


External links


MBTA – Green Line
{{North American legacy streetcar systems Standard-gauge railways in the United States Railway lines opened in 1897 1897 establishments in Massachusetts 600 V DC railway electrification