The Southend Pier Railway is a
narrow gauge railway
A narrow-gauge railway (narrow-gauge railroad in the US) is a railway with a track gauge narrower than standard . Most narrow-gauge railways are between and .
Since narrow-gauge railways are usually built with tighter curves, smaller structur ...
in the
English city of
Southend-on-Sea,
Essex. It runs for along the length of
Southend Pier, providing public passenger transport from the shore to the pier head.
History
19th century

The original pier at Southend was a wooden construction erected in 1830 by a private company. To assist in the loading and unloading of vessels at the seaward end, a gauge
horse-drawn tramway was laid down along its length.
When construction of the new pier was sanctioned by the Southend Local Board, the plans included provision for an electric railway. Construction of the line commenced in 1888 concurrently with the building of the new pier, under the direction of C. R. Norton, the former electrical engineer of the pier, electrification being carried out by Colonel
R. E. B. Crompton.
By 1889, about of gauge single track had been laid and a single motor car was run over it. This was equipped with a motor taking current at 200 V DC from the pier's own generator. The compound-wound generator being belt driven from a
Davey, Paxman & Co steam engine with a locomotive-type boiler. Current collection was from a centre rail consisting of a steel channel and copper strip mounted on petticoat insulators, with a carbon brush pickup on the motor cars. The return circuit was through the running rails. In 1890, the single track was completed and two trailer cars acquired to form a three-car train. By 1893, a passing loop had been completed and a second train of three cars added.
Over the six years from 1893, traffic on the pier had developed to the point where another two trains were needed. At the same time, in 1899, a second generator was provided and the passing loop extended. However, in 1902, Southend Corporation established its own generating station in London Road and the pier plant became redundant and was disposed of. The new supply was at 500 V DC; so the four motor cars were refitted with new motors rated at each. The trains were made up to four cars each by the purchase of four new trailer cars from the
Falcon Works at
Loughborough. Two of these were purchased by the
Volk's Electric Railway in
Brighton
Brighton () is a seaside resort and one of the two main areas of the City of Brighton and Hove in the county of East Sussex, England. It is located south of London.
Archaeological evidence of settlement in the area dates back to the Bronze A ...
when they became redundant in 1949. They were converted into motor cars numbered 8 and 9. These cars continued to operate in Brighton until the late 1990s, when they were again retired. Car 8 was returned to Southend to join the Southend Pier Museum collection, and car 9 is on display at the South Downs Heritage Centre at
Hassocks.
20th Century
In 1909 a further four trailer cars were purchased to form four trains of five cars each. The motor cars proved to be underpowered for this load and, in 1910, each motor car was refitted with twin
BTH BTH may refer to:
* Bachelor of Theology (B.Th.)
* Bacterial two-hybrid system, a genetic technique to detect interactions among proteins
* Benzothiadiazole (disambiguation)
* Blekinge Institute of Technology (''Blekinge Tekniska Högskola''), Swe ...
motors. In 1911 the conductor rail was replaced with 45lb/yard steel rail, similar to the running rails, with new pickups, made of cast iron, being fitted to the motor cars.
In 1914, another eight cars were purchased and the trains made up to seven cars each. In 1919, the original track, now twenty years old, needed replacement, so new running and conductor rails were laid throughout the pier.
In 1923, experimental magnetic brakes were fitted to one train set. The experiment was evidently not a success as they were discarded after about a year. At the same time, new wheels with
Bessemer steel tyres were fitted to all the cars.
The year 1928 saw the extension of the midway loop by a further and new loops were constructed extending from the North (shore) and South (pier head) stations. The following year these loops were joined up to form a double track railway 93
chains, () long, along the length of the pier. The track came out of cover at pile 18, the two signal cabins were at piles 47/48 and 179/180, and the south station was at piles 217 to 225. At some stage, a workshop was built along the west side of the shore station to handle routine
maintenance.
During the
Second World War the pier was closed to visitors. It was taken over by the
Royal Navy on 9 September 1939, and renamed HMS ''Leigh'', and was used as an assembly point for convoys with anti-aircraft guns on the pier head. It was also the main shipping control point for the
Thames Estuary. The trains were used to supply the guns with ammunition and ferry casualties ashore from the ships. Masters of passing merchant ships used to complain the trains set off the acoustic aircraft early warning devices fitted to their vessels.

By 1949 the original rolling stock was approaching 60 years old and so it was decided to replace it. New stock was ordered from
AC Cars of
Thames Ditton, the survivors of which worked the line until its closure in the mid-1970s. Twenty-eight cars were supplied, forming four trains of seven cars each, consisting of three motor cars and four trailer cars in M-T-T-M-T-T-M formation, the motors cars being operated in multiple. Each train could carry up to 260 passengers. At a top speed of , the journey took four minutes each way, and during peak periods a train ran every five minutes, continuing until 11 pm. The record for passengers carried in one day stands at 55,000.
There were three common patterns of operation:
*Peak: all four trains in service. At any time two trains would be moving, one in each direction, while two more were sitting at the stations. As a train was on its way in to a station, the waiting train would depart, so passengers arriving at a station would normally – but not guaranteed – find a train waiting.
*Off-peak: two trains were sitting locked up, while the other two ran a service.
*Low season: one train ran a shuttle service on one track while all the other trains were stored, at one end or the other, on the other track.
By the 1970s there were only two trains left in service, consisting of cars 1–7 and 22–28. One of the surplus motor cars was converted into a works loco, consisting of a driving cab at the south end and a flat bed mounted on the remainder of the chassis. This was used for the transportation of goods out to the bars and stalls at the end of the pier, and also acted as a permanent way train.
In 1978, the electric railway closed, due to deterioration and the cost of repairs. The 1949-built electric cars were withdrawn, although three preserved examples can be found in the Southend Pier Museum.
It is noted that in 1982, after rail traffic had ceased, a 2w-2PMR
Wickham trolley was present on site, although marked as Out of Use.

The railway was reopened by
Princess Anne on 2 May 1986 after rebuilding to gauge. Two new diesel trains were built by
Severn Lamb
Severn Lamb, sometimes known as Severn-Lamb, are manufacturers of various forms of transport systems and equipment, principally aimed at the leisure market. They are based at Alcester in the English county of Warwickshire, but sell their product ...
and introduced on a simplified line comprising a single track with a passing loop and twin-track terminal stations. As originally delivered, the trains were liveried in all-over burgundy with a white waist-band, but were repainted to a two-tone blue in 2006, retaining the white waist-band. They also carried a Southend Borough Council logo.
A
battery power
An electric battery is a source of electric power consisting of one or more electrochemical cells with external connections for powering electrical devices.
When a battery is supplying power, its positive terminal is the cathode and its negati ...
ed single passenger car, built by Castleline of
Nottingham, entered service in November 1995 for service in winter. This car is numbered 1835, the year that Southend Pier first appeared on Admiralty charts.
There are also several wagons for maintenance trains.
21st century
On 9 October 2005, a fire severely damaged much of the pier head including the railway station. The station was temporarily re-sited, until a new and modern structure was opened on the original site in September 2009. Although the passenger trains were not damaged, two wagons used on maintenance trains were destroyed in the fire.
In September 2016, the railway was out of action due to emergency engineering works, though the pier itself was still open to the public.
[http://www.southend.gov.uk/info/200306/southend_pier_and_cliff_lift/79/opening_times_ticket_prices_and_pier_train_information ] The Pier Railway reopened in late 2016.
Two new, Severn Lamb built, trains were scheduled to replace the 1986 built trains in 2021. The new trains began arriving at the pier on 28 September 2021. They are painted in the green and cream livery carried by the earlier electric trains.
Operation

The line is owned and operated by
Southend-on-Sea City Council, and operates every day the pier is open. The normal service uses a single train, and runs every half-hour. At peak times a two train service is operated, providing a 15-minute interval service. Trains operate between stations known as ''Shore'' and ''Pier Head'' with no intermediate stops.
The train service is provided by one diesel train and one battery-electric train. The diesel train consists of a diesel-hydraulic locomotive at the southern end, five trailer coaches and, at the northern end, a driver control unit with passenger space and is named ''
Sir William Heygate''. A second former diesel train, ''
Sir John Betjeman
Sir John Betjeman (; 28 August 190619 May 1984) was an English poet, writer, and broadcaster. He was Poet Laureate from 1972 until his death. He was a founding member of The Victorian Society and a passionate defender of Victorian architectu ...
'', has been decommissioned, the locomotive parked at the pier end station, and the carriage bodies removed from their chassis and reused as waiting shelters at various places in the station and around the pier.
The first battery-electric train was named ''
Sir David Amess
''Sir'' is a formal honorific address in English for men, derived from Sire in the High Middle Ages. Both are derived from the old French "Sieur" (Lord), brought to England by the French-speaking Normans, and which now exist in French only as p ...
'' in tribute to the murdered MP, by
Prince Charles
Charles III (Charles Philip Arthur George; born 14 November 1948) is King of the United Kingdom and the 14 other Commonwealth realms. He was the longest-serving heir apparent and Prince of Wales and, at age 73, became the oldest person to ...
and
Camilla, Duchess of Cornwall at a ceremony to mark the granting of city status to Southend on 1 May 2022.
A twin-track island platform is provided at each terminus, and there is a passing loop in mid-pier, but otherwise the line is single tracked. The pier head terminus is in the open air, but the shore terminus is enclosed, and also provides rail access to a workshop for maintaining the trains. The Southend Pier Museum is situated below the shore station in the original workshops.
Gallery
File:SPR AC Cars train.jpg, Southend Pier electric train in 1974
File:SPR75.jpg, Plaque celebrating the 75th anniversary of the Southend Pier Railway
File:Shore station (Southend Pier) look south.JPG, Shore station looking south, with both trains present.
File:Pier Head stn (Southend Pier) building.JPG, Pier Head station
File:Southend-on-Sea - pier train emerging - geograph.org.uk - 970561.jpg, ''Sir William Heygate'' emerging from Shore terminus in 2008.
See also
*
Southend Cliff Railway
The Southend Cliff Railway, or Southend Cliff Lift, is a funicular in the English city of Southend-on-Sea, constructed in 1912. The lift operated for the first time on Bank Holiday Monday, in August of that year.
Technical details
The line i ...
References
External links
Pier railway details from Southend-on-Sea Borough Council
{{coord, 51.52423, 0.71876, format=dms, region:GB_type:landmark_dim:3000, display=title
3 ft 6 in gauge railways in England
3 ft gauge railways in England
Pier railways
Transport in Southend-on-Sea
Rail transport in Essex
Buildings and structures in Southend-on-Sea