The Romerike Tunnel () is a railway tunnel in Norway between
Oslo Oslo ( or ; ) is the capital and most populous city of Norway. It constitutes both a county and a municipality. The municipality of Oslo had a population of in 2022, while the city's greater urban area had a population of 1,064,235 in 2022 ...
and
Lillestrøm Lillestrøm is a municipality in Akershus county. It is located in the traditional district of Romerike. With a population of 85,757 inhabitants, it is the fourth most populated municipality in Viken. It was founded on 1 January 2020 as a merger ...
. It is the second longest railway tunnel in Norway after the Blix Tunnel opened in 2022, and forms the first section of the
Gardermoen Line The Gardermoen Line () is a high-speed railway line between Oslo and Eidsvoll, Norway, running past Lillestrøm and Oslo Airport, Gardermoen. The line is long and replaced the older Hoved Line as the main line north-east of Oslo. The older ...
. It is
double track A double-track railway usually involves running one track in each direction, compared to a single-track railway where trains in both directions share the same track. Overview In the earliest days of railways in the United Kingdom, most li ...
and electrified, permitting speeds of . Construction started in 1994, with plans to open with the rest of the Gardermoen Line and
Oslo Airport, Gardermoen Oslo Airport () , alternatively referred to as Oslo Gardermoen Airport or simply Gardermoen, is an international airport serving Oslo, the capital and most populous city of Norway. The airport is the second largest in Scandinavia and the Nord ...
on 8 October 1998. Due to serious leakage from Lutvann and several other lakes, it did not open until 22 August 1999. The leaks increased the cost of the tunnel from to NOK 1.8 billion. The main contractor was Scandinavian Rock Group. The tunnel was originally owned by NSB Gardermobanen, then the
Norwegian National Rail Administration Jernbaneverket () was a government agency responsible for owning, maintaining, operating and developing the Norwegian railway network, including the track, stations, classification yards, traffic management and timetables. Safety oversight ...
, and now owned by
Bane NOR Bane NOR SF is the Norwegian government agency responsible for owning, maintaining, operating and developing the Norwegian railway network, including the track, stations, and the majority of other infrastructure assets. It took over the operati ...
. The tunnel allows long-distance, regional and
Flytoget Flytoget (') is a high-speed rail, high-speed airport rail link, airport railway service connecting Oslo Airport, Gardermoen, Oslo Airport to Oslo Central Station. Run by Flytoget AS (formerly NSB Gardermobanen AS), it operates on the high-speed ...
Airport Express Trains to bypass the old Hoved Line, reducing journey times between Oslo and Lillestrøm from 29 to 12 minutes.


Background

The tunnel was constructed as part of the high-speed Gardermoen Line which runs from Oslo to
Eidsvoll Eidsvoll (; sometimes written as ''Eidsvold'') is a Municipalities of Norway, municipality in Akershus Counties of Norway, county, Norway. It is part of the Romerike Districts of Norway, traditional region. The administrative centre of the munic ...
via Oslo Airport, Gardermoen. The tunnel makes up most of the section between
Oslo Central Station Oslo Central Station (, abbreviated ) is the main railway station in Oslo, and the largest railway station within the entire Norwegian railway system. It connects with Jernbanetorget station, which is served by trams and the Oslo Metro. It's ...
and
Lillestrøm Station Lillestrøm Station () is a railway station serving the town of Lillestrøm in Skedsmo, Norway. Located on the Gardermoen Line and the Trunk Line as well as being the western terminus of the Kongsvinger Line, it is the main transport hub of th ...
and was built to bypass the meandering Trunk Line which dates from 1854. Despite the older line being double track, capacity had reached its limit due to a combination of some trains making many stops and others none until Lillestrøm. The Romerike Tunnel would also be straighter and allow higher through speeds, decreasing travel time from 29 to 12 minutes. The decision to build the Gardermoen Line and Romerike Tunnel was taken by the
Norwegian Parliament The Storting ( ; ) is the supreme legislature of Norway, established in 1814 by the Constitution of Norway. It is located in Oslo. The unicameral parliament has 169 members and is elected every four years based on party-list proportional represe ...
on 8 October 1992, with the opening planned for six years later on 8 October 1998. An alternative airport site to Gardermoen was proposed at
Hurum Hurum was a municipality in Buskerud county, Norway. As of 1 January 2020 Hurum has merged with the municipalities of Røyken and Asker to form the new Asker Municipality located in the newly formed Viken county. The administrative centre of th ...
, south-west of Oslo. Had Hurum been chosen, the Gardermoen Line would not have been necessary for the airport express train, but the planning documents recommended that construction still proceed to ease traffic congestion north of Oslo. The tunnel is used by all trains on the Gardermoen Line, including the Flytoget airport express, and the regional and express trains which continue via the
Dovre Line The Dovre Line () is a Norwegian railway line with three slightly different lines which all lead to the historic city of Trondheim (city), Trondheim. Definition *Dovre Line is the main line between Eidsvoll Station and Trondheim Station, used b ...
. Local trains on the Hoved Line and
Kongsvinger Line The Kongsvinger Line () is a railway line between the towns of Lillestrøm and Kongsvinger in Norway and onwards to Charlottenberg in Sweden. The railway was opened on 3 October 1862 and is Norway's second standard gauge line (after the Hoved ...
to the north also use the tunnel. Use of the Hoved Line is limited to freight trains and commuter trains which make stops along the route.


Construction

Construction started in August 1994, after a tender had been won by Scandinavian Rock Group (SRG), a collaboration between Målselv Anlegg, Nor Entreprenør and
Peab Peab AB (originally Paulsson Entreprenad AktieBolag ) is a construction and civil engineering company headquartered in Förslöv, Scania, listed on NASDAQ OMX Stockholm. It is the third largest construction company in Sweden and the Nordic regi ...
. The original contract price was NOK 541 million. An average of 388 man-years were expended during construction, and the work involved the removal of 1.62 million tonnes of rock. There were three excavation points (headings), located at Bryn, Starveien on the Oslo–Lørenskog border, and at Stalsberg, outside Lillestrøm. The tunnel is long with a cross-section, making it the longest tunnel in Norway when it opened, and the second longest since the opening of the Lærdal road tunnel. It allows speeds of , with a slope of 0.2–0.4% slanting upwards towards Lillestrøm. This provides a natural updraft in the direction of Lillestrøm, but a horizontal ventilation system was needed to work in the opposite direction. This is supplemented with vertical ventilation shafts at Bryn and Starveien. The tunnel is between and below ground, being at its deepest in the vicinity of Bryn. Trains using the tunnel must be capable of a minimum speed of . The tunnel has
overhead wires An overhead line or overhead wire is an electrical cable that is used to transmit electrical energy to electric locomotives, electric multiple units, trolleybuses or trams. The generic term used by the International Union of Railways for the tec ...
with
15 kV AC railway electrification Railway electrification using at are used on transport railways in Rail transport in Germany, Germany, Rail transport in Austria, Austria, Rail transport in Switzerland, Switzerland, Rail transport in Sweden, Sweden, and Rail transport in No ...
().


Leakages

The tunnel needed to pass under
Østmarka Østmarka is a forested area to the east of Oslo and part of the congregation of woodland areas known as Oslomarka. The area is situated within the municipalities Oslo, Lørenskog, Rælingen, Ski and Enebakk. Østmarka is delimited to the west b ...
, a recreational area east of Oslo. The geology of this area is unstable, and was not ideal for tunnel boring. Pressure for its completion to coincide with the opening of the new airport resulted in tunnel excavation proceeding at maximum speed, without adequate measures to exclude water, which resulted in leaks. Houses above the route of the tunnel in Hellerud were damaged and the water levels of many lakes in Østmarka were reduced, including lakes Lutvann and Nordre Puttjern. After the damage was discovered on 3 February 1997, legal actions were initiated by the
Norwegian Water Resources and Energy Directorate The Norwegian Water Resources and Energy Directorate ( or NVE) is a Norwegian government agency established in 1921. It is under the Ministry of Petroleum and Energy and regulates the country's water resources and energy supply. Its mandate in ...
requiring remedial measures to halt the leakage. At its worst, the rate of leakage into the tunnel was of water per minute. The Rhoca-Gil proprietary sealant process was used to stop the leaks. On investigation, Rhoca-Gil was revealed to contain a toxic substance called
acrylamide Acrylamide (or acrylic amide) is an organic compound with the chemical formula CH2=CHC(O)NH2. It is a white odorless solid, soluble in water and several organic solvents. From the chemistry perspective, acrylamide is a vinyl-substituted primary ...
, which caused health problems for the tunnel workers. The removal of Rhoca-Gil and its replacement with concrete resulted in additional delays. In addition, an extensive permanent pumping system was installed to restore and maintain lake levels in Østmarka. Curing the leaks and cleaning up the contamination delayed the tunnel's completion by a year, and it was finally opened on 22 August 1999. The entire process was further complicated by conflicts between NSB Gardermobanen and the Scandinavian Rock Group. Retrospective surveys showed a lack of control and reporting procedures during the incidents, which should have been addressed in 1995, but were never taken seriously. Compensation was paid for approximately 60 houses which were damaged as a result of tunnel construction. An evaluation by the Ministry of Transport and Communications showed that NOK 500 million was spent fixing the leaks, but the report claimed that this was to a large extent a waste of money, resulting from inefficient engineering procedures. The same report criticized the planning and organization of the construction of the entire railway. In total the extraordinary additional costs for the tunnel totaled NOK 1.3 billion.


Delay

When the new airport opened on 8 October 1998 the Flytoget airport express trains started operating immediately, as did the Gardermoen Line from Lillestrøm to the airport and onwards to Eidsvoll. Because the tunnel was not finished, trains were required to use the old Trunk Line from Oslo Central Station to Lillestrøm. After this diversion the express trains switched to the completed section of the new Gardermoen Line between Lillestrøm and Oslo Airport. Regular operations using the Romerike Tunnel started on 22 August 1999.


See also

* Hallandsås Tunnel *
List of longest tunnels This list of longest tunnels ranks tunnels that are at least long. Only continuous tunnels are included. Pipelines, even those that are buried, are excluded. The longest tunnels have been constructed for Water supply network, water distribution, ...


References

{{good article Railway tunnels in Oslo Railway tunnels in Akershus Tunnels on the Gardermoen Line Flytoget 1999 establishments in Norway Tunnels completed in 1999