Nuclear decommissioning is the process leading to the irreversible complete or partial closure of a nuclear facility, usually a
nuclear reactor A nuclear reactor is a device used to initiate and control a Nuclear fission, fission nuclear chain reaction. They are used for Nuclear power, commercial electricity, nuclear marine propulsion, marine propulsion, Weapons-grade plutonium, weapons ...
, with the ultimate aim at termination of the operating licence. The process usually runs according to a ''decommissioning plan'', including the whole or partial dismantling and decontamination of the facility, ideally resulting in restoration of the environment up to greenfield status. The decommissioning plan is fulfilled when the approved end state of the facility has been reached. The process typically takes about 15 to 30 years, or many decades more when an interim ''safe storage'' period is applied for
radioactive decay Radioactive decay (also known as nuclear decay, radioactivity, radioactive disintegration, or nuclear disintegration) is the process by which an unstable atomic nucleus loses energy by radiation. A material containing unstable nuclei is conside ...
.
Radioactive waste Radioactive waste is a type of hazardous waste that contains radioactive material. It is a result of many activities, including nuclear medicine, nuclear research, nuclear power generation, nuclear decommissioning, rare-earth mining, and nuclear ...
that remains after the decommissioning is either moved to an on-site storage facility where it is still under control of the owner, or moved to a
dry cask storage Dry cask storage is a method of storing high-level radioactive waste, such as spent nuclear fuel that has already been cooled in a spent fuel pool for at least one year and often as much as ten years. Casks are typically steel cylinders that are ...
or disposal facility at another location. The final disposal of nuclear waste from past and future decommissioning is a growing still unsolved problem. Decommissioning is an administrative and technical process. The facility is dismantled to the point that it no longer requires measures for radiation protection. It includes clean-up of radioactive materials. Once a facility is fully decommissioned, no radiological danger should persist. The license will be terminated and the site released from regulatory control. The plant licensee is then no longer responsible for the nuclear safety. The costs of decommissioning are to be covered by funds that are provided for in a ''decommissioning plan'', which is part of the facility's initial authorization. They may be saved in a decommissioning fund, such as a trust fund. Worldwide, there are hundreds of thousands small nuclear devices and facilities, for medical, industrial and research purposes, that will have to be decommissioned at some point.''Decommissioning of nuclear facilities''
p. 52. IAEA, 9 Sep 2002


Definition

Nuclear decommissioning is the administrative and technical process leading to the irreversible closure of a nuclear facility such as a
nuclear power plant A nuclear power plant (NPP), also known as a nuclear power station (NPS), nuclear generating station (NGS) or atomic power station (APS) is a thermal power station in which the heat source is a nuclear reactor. As is typical of thermal power st ...
(NPP), a research reactor, an
isotope Isotopes are distinct nuclear species (or ''nuclides'') of the same chemical element. They have the same atomic number (number of protons in their Atomic nucleus, nuclei) and position in the periodic table (and hence belong to the same chemica ...
production plant, a
particle accelerator A particle accelerator is a machine that uses electromagnetic fields to propel electric charge, charged particles to very high speeds and energies to contain them in well-defined particle beam, beams. Small accelerators are used for fundamental ...
, or uranium mine. It refers to the administrative and technical actions taken to remove all or some of the regulatory controls from the facility to bring about that its site can be reused. Decommissioning includes planning, decontamination, dismantling and materials management.''Decommissioning of nuclear installations.''
IAEA (accessed Feb 2023)
Decommissioning is the final step in the lifecycle of a nuclear installation. It involves activities from shutdown and removal of nuclear material to the environmental restoration of the site.''Decommissioning of nuclear facilities.''
European Commission (accessed Feb 2023)
The term decommissioning covers all measures carried out after a nuclear installation has been granted a ''decommissioning licence'' until nuclear regulatory supervision is no longer necessary. The aim is ideally to restore the natural initial state that existed before the construction of the nuclear power plant, the so-called greenfield status.''Decommissioning & dismantling.''
Gesellschaft für Anlagen- und Reaktorsicherheit (GRS) (accessed Feb 2023)
Decommissioning includes all steps as described in the ''decommissioning plan'', leading to the release of a nuclear facility from regulatory control. The decommissioning plan is fulfilled when the approved end state of the facility has been reached. Disposal facilities for
radioactive waste Radioactive waste is a type of hazardous waste that contains radioactive material. It is a result of many activities, including nuclear medicine, nuclear research, nuclear power generation, nuclear decommissioning, rare-earth mining, and nuclear ...
are ''closed'' rather than ''decommissioned''. The use of the term decommissioning implies that no further use of the facility (or part thereof) for its existing purpose is foreseen. Though decommissioning typically includes dismantling of the facility, it is not necessarily part of it as far as existing structures are reused after decommissioning and decontamination.''IAEA Nuclear Safety and Security Glossary''
2022 (p. 137). 3.7 MB
Via
/ref>,p. 49-50 From the owner's perspective, the ultimate aim of decommissioning is termination of the operating license, once he has given certainty that the radiation at the site is below the legal limits, which in the US is an annual exposure of 25 millirem in case of releasing of the site to the public for unrestricted use. The site will be dismantled to the point that it no longer requires measures for
radiation protection Radiation protection, also known as radiological protection, is defined by the International Atomic Energy Agency (IAEA) as "The protection of people from harmful effects of exposure to ionizing radiation, and the means for achieving this". Exposu ...
. Once a facility is decommissioned no radioactive danger persists and it can be released from regulatory control. The complete process usually takes about 20 to 30 years. In the US, the decommissioning must be completed within 60 years of the plant ceasing operations, unless a longer time is necessary to protect public health and safety;''Backgrounder on Decommissioning Nuclear Power Plants.''
U.S.NRC, update 17 Oct 2022
up to 50 years are for
radioactive decay Radioactive decay (also known as nuclear decay, radioactivity, radioactive disintegration, or nuclear disintegration) is the process by which an unstable atomic nucleus loses energy by radiation. A material containing unstable nuclei is conside ...
and 10 years to dismantle the facility.''Overview of Reactor Decommissioning''
NRC, 18 Oct 2017 (2.4 MB)


Steps in the decommissioning process

The decommissioning process encompasses: ;pre-decommissioning * development of a decommissioning plan * involvement of the public (in democracies) * application for a decommissioning license * permanent shutdown * removal and disposal of
nuclear fuel Nuclear fuel refers to any substance, typically fissile material, which is used by nuclear power stations or other atomic nucleus, nuclear devices to generate energy. Oxide fuel For fission reactors, the fuel (typically based on uranium) is ...
,
coolant A coolant is a substance, typically liquid, that is used to reduce or regulate the temperature of a system. An ideal coolant has high thermal capacity, low viscosity, is low-cost, non-toxic, chemically inert and neither causes nor promotes corr ...
(s) and/or moderator ;decommissioning * dismantling and decontamination * in the US, a ''License Termination Plan'' (LTP) has to be submitted two years prior to (the expected) termination of the plant license.''Summary of License Termination Plan Submittals by Three Nuclear Power Plants''
EPRI, 28 Oct 2002
* restoration of the environment * termination of the operating license; turn over responsibilities * monitoring of the site (in case of deferred dismantling/Safstor) * monitoring and maintenance of the interim storage of spent fuel * final disposal of
radioactive waste Radioactive waste is a type of hazardous waste that contains radioactive material. It is a result of many activities, including nuclear medicine, nuclear research, nuclear power generation, nuclear decommissioning, rare-earth mining, and nuclear ...


Decommissioning plan

Under supervision of the
IAEA The International Atomic Energy Agency (IAEA) is an intergovernmental organization that seeks to promote the peaceful use of nuclear energy and to inhibit its use for any military purpose, including nuclear weapons. It was established in 1957 ...
, a member state first develops a decommissioning plan to demonstrate the feasibility of decommissioning and assure that the associated costs are covered. At the final shutdown, a final decommissioning plan describes in detail how the decommissioning will take place, how the facility will be safely dismantled, ensuring radiation protection of the workers and the public, addressing environmental impacts, managing radioactive and non-radioactive materials, and termination of the regulatory authorization. In the EU, decommissioning operations are overseen by Euratom. Member states are assisted by the
European Commission The European Commission (EC) is the primary Executive (government), executive arm of the European Union (EU). It operates as a cabinet government, with a number of European Commissioner, members of the Commission (directorial system, informall ...
. The progressive demolition of buildings and removal of
radioactive Radioactive decay (also known as nuclear decay, radioactivity, radioactive disintegration, or nuclear disintegration) is the process by which an unstable atomic nucleus loses energy by radiation. A material containing unstable nuclei is conside ...
material is potentially occupationally hazardous, expensive, time-intensive, and presents environmental risks that must be addressed to ensure radioactive materials are either transported elsewhere for storage or stored on-site in a safe manner.


Disposal of nuclear waste

Radioactive waste Radioactive waste is a type of hazardous waste that contains radioactive material. It is a result of many activities, including nuclear medicine, nuclear research, nuclear power generation, nuclear decommissioning, rare-earth mining, and nuclear ...
that remains after the decommissioning is either moved to an on-site storage facility where it still is under control of the plant owner, or moved to a
dry cask storage Dry cask storage is a method of storing high-level radioactive waste, such as spent nuclear fuel that has already been cooled in a spent fuel pool for at least one year and often as much as ten years. Casks are typically steel cylinders that are ...
or disposal facility at another location.''Storage of Spent Nuclear Fuel''
U.S.NRC, update 9 Jan 2023.
"Decommissioned Reactor Sites – After terminating reactor operations and removing structures used in reactor operations, the licensee stores spent fuel on-site pending off-site transport to either a site-specific ISFSI that is authorized to receive the spent fuel, or a permanent geologic repository licensed for disposal."
The problem of long-term disposal of nuclear waste is still unsolved. Pending the availability of geologic repository sites for long-term disposal, interim storage is necessary. As the planned
Yucca Mountain nuclear waste repository The Yucca Mountain Nuclear Waste Repository, as designated by the Nuclear Waste Policy Act amendments of 1987, is a proposed deep geological repository storage facility within Yucca Mountain for spent nuclear fuel and other high-level radioact ...
– like elsewhere in the world – is controversial, on- or off-site storage in the US usually takes place in ''Independent Spent Fuel Storage Facilities'' ( ISFSI's).''Independent spent fuel storage installation (ISFSI)''
U.S.NRC, update 9 March 2021
In the UK, all eleven Magnox reactors are in decommissioning under responsibility of the NDA. The spent fuel was removed and transferred to the
Sellafield Sellafield, formerly known as Windscale, is a large multi-function nuclear site close to Seascale on the coast of Cumbria, England. As of August 2022, primary activities are nuclear waste storage, nuclear waste processing and storage and nucle ...
site in Cumbria for reprocessing.''Radiological hazard on all Magnox nuclear sites across UK set to reduce by 99%.''
Nuclear Decommissioning Authority, 13 Jan 2017 (archived)
Facilities for "temporary" storage of nuclear waste – mainly 'Intermediate Level Waste' (ILW) – are in the UK called ''Interim Storage Facilities'' (ISF's).''Nuclear Decommissioning: Chapelcross a timeline.''
Newsnet.scot, 10 Jan 2022


Environmental impact assessment

The decommission of a nuclear reactor can only take place after the appropriate licence has been granted pursuant to the relevant legislation. As part of the licensing procedure, various documents, reports and expert opinions have to be written and delivered to the competent authority, e.g. safety report, technical documents and an
environmental impact assessment Environmental impact assessment (EIA) is the assessment of the environmental impact, environmental consequences of a plan, policy, program, or actual projects prior to the decision to move forward with the proposed action. In this context, the te ...
(EIA). In the European Union these documents are a precondition for granting such a licence is an opinion by the European Commission according to Article 37 of the Euratom Treaty. On the basis of these general data, the Commission must be in a position to assess the exposure of reference groups of the population in the nearest neighbouring states.


Options

There are several options for decommissioning: Immediate dismantling (DECON in the United States; )
Shortly after the permanent shutdown, the dismantling and/or
decontamination Decontamination (sometimes abbreviated as decon, dcon, or decontam) is the process of removing contaminants on an object or area, including chemicals, micro-organisms, and/or radioactive substances. This may be achieved by chemical reaction, dis ...
of the facility begins. Equipment, structures, systems and components that contain radioactive material are removed and/or decontaminated to a level that permits the ending of regulatory control of the facility and its release, either for unrestricted use or with restrictions on its future use.,p. 50 The operating license is terminated. Deferred dismantling ( SAFSTOR in the United States; "care and maintenance" (C&M) in the UK)
The final decommissioning is postponed for a longer period, usually 30 to 50 years. Often the non-nuclear part of the facility is dismantled and the fuel removed immediately. The radioactive part is maintained and monitored in a condition that allows the radioactivity to decay. Afterwards, the plant is dismantled and the property decontaminated to levels that permit release for unrestricted or restrict use. In the US, the decommissioning must be completed within 60 years. With deferred dismantling, costs are shifted to the future, but this entails the risk of rising expenditures for decades to come and changing rules.''US utility's deferred reactor clean-up shows cost pressure on early closures.''
Reuters Events, 21 Sep 2016
Moreover, the site cannot be re-used until the decommissioning is finished, while there are no longer revenues from production. Partial entombment
The US has introduced the so-called ''In Situ Decommissioning'' (ISD) closures. All aboveground structures are dismantled; all remaining belowground structures are entombed by grouting all spaces. Advantages are lower decommissioning costs and safer execution. Disadvantages are main components remaining undismantled and definitively inaccessible. The site has to be monitored indefinitely. This method was implemented at the Savannah River Site in South Carolina for the closure of the P and R Reactors. With this method, the cost of decommissioning for each reactor was about $73 million. In comparison, the decommissioning of each reactor using traditional methods would have been an estimated $250 million. This resulted in a 71% decrease in cost. Other examples are the Hallam nuclear reactor and the Experimental Breeder Reactor II. Complete entombment
The facility will not be dismantled. Instead it is entombed and maintained indefinitely, and surveillance is continued until the entombed radioactive waste is decayed to a level permitting termination of the license and unrestricted release of the property. The licensee maintains the license previously issued. This option is likely the only possible one in case of a nuclear disaster where the reactor is destroyed and dismantling is impossible or too dangerous. An example of full entombment is the Chernobyl reactor. In IAEA terms, entombment is not considered an acceptable strategy for decommissioning a facility following a planned permanent shutdown, except under exceptional circumstances, such as a nuclear disaster. In that case, the structure has to be maintained and surveillance continued until the radioactive material is decayed to a level permitting termination of the licence and unrestricted release of the structure.,p. 50


Costs

The calculation of the total cost of decommissioning is challenging, as there are large differences between countries regarding inclusion of certain costs, such as on-site storage of fuel and radioactive waste from decommissioning, dismanting of non-radioactive buildings and structures, and transport and (final) disposal of radioactive waste.''Costs of decommissioning nuclear power plants''
NEA No. 7201, OECD, 2016 (viewer)
PDF
(4 MB)
,p. 61 Moreover, estimates of future costs of deferred decommissioning are virtually impossible, due to the long periode, where inflation and rising costs are unpredictable. Nuclear decommissioning projects are characterized by high and highly variable costs, long schedule and a range of risks. Compared with non-nuclear decommissioning, additional costs are usually related with radiological hazards and safety & security requirements, but also with higher wages for required higher qualified personnel. Benchmarking, comparing projects in different countries, may be useful in estimating the cost of decommissioning. While, for instance, costs for spent fuel and high-level-waste management significantly impacts the budget and schedule of decommissioning projects, it is necessary to clarify which is the starting and the ending point of the decommissioning process. The effective decommissioning activities begin after all nuclear fuel has been removed from the plant areas that will be decommissioned and these activities form a critical component of pre-decommissioning operations, thus should be factored into the decommissioning plan. The chosen option – immediate or deferred decommissioning – impacts the overall costs. Many other factors also influence the cost. A 2018
KPMG KPMG is a multinational professional services network, based in London, United Kingdom. As one of the Big Four accounting firms, along with Ernst & Young (EY), Deloitte, and PwC. KPMG is a network of firms in 145 countries with 275,288 emplo ...
article about decommissioning costs observes that many entities do not include the cost of managing spent nuclear fuel, removed from the plant areas that will be decommissioned (in the US routinely stored in ISFSIs).''Decommissioning nuclear – Understanding the reporting obligations''
KPMG Canada, 2018 (3.1 MB)
In 2004, in a meeting in
Vienna Vienna ( ; ; ) is the capital city, capital, List of largest cities in Austria, most populous city, and one of Federal states of Austria, nine federal states of Austria. It is Austria's primate city, with just over two million inhabitants. ...
, the
International Atomic Energy Agency The International Atomic Energy Agency (IAEA) is an intergovernmental organization that seeks to promote the peaceful use of nuclear technology, nuclear energy and to inhibit its use for any military purpose, including nuclear weapons. It was ...
estimated the total cost for the decommissioning of all nuclear facilities. Decommissioning of all nuclear power reactors in the world would require US$187 
billion Billion is a word for a large number, and it has two distinct definitions: * 1,000,000,000, i.e. one thousand million, or (ten to the ninth power), as defined on the short scale. This is now the most common sense of the word in all varieties of ...
; US$71 billion for fuel cycle facilities; less than US$7 billion for all research reactors; and US$640 billion for dismantling all military reactors for the production of weapons-grade
plutonium Plutonium is a chemical element; it has symbol Pu and atomic number 94. It is a silvery-gray actinide metal that tarnishes when exposed to air, and forms a dull coating when oxidized. The element normally exhibits six allotropes and four ...
, research fuel facilities,
nuclear reprocessing Nuclear reprocessing is the chemical separation of fission products and actinides from spent nuclear fuel. Originally, reprocessing was used solely to extract plutonium for producing nuclear weapons. With commercialization of nuclear power, the ...
chemical separation facilities, etc. The total cost to decommission the
nuclear fission Nuclear fission is a reaction in which the nucleus of an atom splits into two or more smaller nuclei. The fission process often produces gamma photons, and releases a very large amount of energy even by the energetic standards of radioactiv ...
industry in the
World The world is the totality of entities, the whole of reality, or everything that Existence, exists. The nature of the world has been conceptualized differently in different fields. Some conceptions see the world as unique, while others talk ...
(from 2001 to 2050) was estimated at US$1 
trillion ''Trillion'' is a number with two distinct definitions: *1,000,000,000,000, i.e. one million 1,000,000, million, or (ten to the twelfth Exponentiation, power), as defined on the long and short scales, short scale. This is now the meaning in bot ...
. Market Watch estimated (2019) the global decommissioning costs in the nuclear sector in the range of US$1 billion to US$1.5 billion per 1,000-megawatt plant. The huge costs of research and development for (geological) longterm disposal of nuclear waste are collectively defrayed by the taxpayers in different countries, not by the companies.


Decommissioning funds

The costs of decommissioning are to be covered by funds that are provided for in a ''decommissioning plan'', which is part of the facility's initial authorization, before the start of the operations. In this way, it is ensured that there will be sufficient money to pay for the eventual decommissioning of the facility. This may for example be through saving in a trust fund or a guarantee from the parent company�
''Backgrounder on Decommissioning Nuclear Power Plants.''
U.S.NRC:
"Before a nuclear power plant begins operations, the licensee must establish or obtain a financial mechanism – such as a trust fund or a guarantee from its parent company – to ensure there will be sufficient money to pay for the ultimate decommissioning of the facility."
�
''Decommissioning of nuclear installations.''
IAEA:
"As part of a facility's initial authorization, a decommissioning plan is developed that demonstrates the feasibility of decommissioning and provides assurance that provisions are in place to cover the associated costs."
Switzerland has a central fund for decommissioning its five nuclear power reactors, and another one for disposal the
nuclear waste Radioactive waste is a type of hazardous waste that contains radioactive material. It is a result of many activities, including nuclear medicine, nuclear research, nuclear power generation, nuclear decommissioning, rare-earth mining, and nuclear ...
. Germany has also a state-owned fund for decommissioning of the plants and managing radioactive waste, for which the reactor owners have to pay. The UK Government (the taxpayers) will pay most of the costs for both nuclear decommissioning and existing waste. ''EDF facing bankruptcy as decommissioning time for France's ageing nuclear fleet nears.''
Paul Dorfman, The Ecologist, 16 March 2017
The decommissioning of all Magnox reactors is entirely funded by the state.Table of the cost of decommissioning of the UK Magnox reactors, entirely funded by the state (in 2015-pounds)
''Nuclear Decommissioning Authority: Strategy''
Appendix B, p. 129. March 2016
Via
/ref> Since 2010, owners of new nuclear plants in the Netherlands are obliged to set up a decommissioning fund before construction is started.''Geld tekort voor sloop Dodewaard .''
Volkskrant, 19 Oct 2010 (in Dutch)


Underfunding

The economic costs of decommissioning will increase as more assets reach the end of their life, but few operators have put aside sufficient funds. In 2016 the
European Commission The European Commission (EC) is the primary Executive (government), executive arm of the European Union (EU). It operates as a cabinet government, with a number of European Commissioner, members of the Commission (directorial system, informall ...
assessed that European Union's nuclear decommissioning liabilities were seriously underfunded by about 118 billion euros, with only 150 billion euros of earmarked assets to cover 268 billion euros of expected decommissioning costs covering both dismantling of nuclear plants and storage of radioactive parts and waste.''EU short of 118 billion euros in nuclear decommissioning funds''.
Reuters, 16 Feb 2016
In Feb 2017, a committee of the French parliament warned that the state-controlled EDF has underestimated the costs for decommissioning.
France France, officially the French Republic, is a country located primarily in Western Europe. Overseas France, Its overseas regions and territories include French Guiana in South America, Saint Pierre and Miquelon in the Atlantic Ocean#North Atlan ...
had set aside only €23 billion for decommissioning and waste storage of its 58 reactors, which was less than a third of 74 billion in expected costs, while the UK's NDA estimated that clean-up of UK's 17 nuclear sites will cost between €109-€250 billion. EDF estimated the total cost at €54 billion. According to the parliamentary commission, the clean-up of French reactors will take longer, be more challenging and cost much more than EDF anticipates. It said that EDF showed "excessive optimism" concerning the decommissioning. EDF values some €350 million per reactor, whereas European operators count with between 900 million and 1.3 billion euros per reactor. The EDF's estimate was primarily based on the single historic example of the already dismantled Chooz A reactor. The committee argued that costs like restoration of the site, removal of spent fuel, taxes and insurance and social costs should be included.''France's lower-cost decommissioning plan rests on Chooz A reactor learnings''
Reuters, 22 Feb 2017
Similar concerns about underfunding exist in the United States, where the U.S. Nuclear Regulatory Commission has located apparent decommissioning funding assurance shortfalls and requested 18 power plants to address that issue. The decommissioning cost of
Small modular reactor The small modular reactor (SMR) is a class of small nuclear fission reactor, designed to be built in a factory, shipped to operational sites for installation, and then used to power buildings or other commercial operations. The term SMR refers t ...
s is expected to be twice as much respect to Large Reactors.


Examples by country

In France, decommissioning of
Brennilis Nuclear Power Plant The Brennilis Nuclear Power Plant (EL-4) is a Nuclear decommissioning, decommissioned site located in the Monts d'Arrée in the Commune in France, commune of Brennilis in Finistère, France. History The Commissariat à l'énergie atomique began ...
, a fairly small 70 MW power plant, already cost €480 million (20x the estimate costs) and is still pending after 20 years. Despite the huge investments in securing the dismantlement, radioactive elements such as
plutonium Plutonium is a chemical element; it has symbol Pu and atomic number 94. It is a silvery-gray actinide metal that tarnishes when exposed to air, and forms a dull coating when oxidized. The element normally exhibits six allotropes and four ...
, caesium-137 and
cobalt-60 Cobalt-60 (Co) is a synthetic radioactive isotope of cobalt with a half-life of 5.2714 years. It is produced artificially in nuclear reactors. Deliberate industrial production depends on neutron activation of bulk samples of the monoisotop ...
leaked out into the surrounding lake. In the UK, the decommissioning of civil nuclear assets were estimated to be £99 to £232 billion (2020), earlier in 2005 under-estimated to be £20-40 billion. The
Sellafield Sellafield, formerly known as Windscale, is a large multi-function nuclear site close to Seascale on the coast of Cumbria, England. As of August 2022, primary activities are nuclear waste storage, nuclear waste processing and storage and nucle ...
site (Calder Hall, Windscale and the reprocessing facility) alone accounts for most of the decommissioning cost and increase in cost; Free access. as of 2015, the costs were estimated £53.2 billion. In 2019, the estimate was even much higher: £97 billion.''Nuclear Provision: the cost of cleaning up Britain's historic nuclear sites.''
NDA, Update 4 July 2019
A 2013 estimate by the United Kingdom's Nuclear Decommissioning Authority predicted costs of at least £100 billion to decommission the 19 existing United Kingdom nuclear sites. In Germany, decommissioning of Niederaichbach nuclear power plant, a 100 MW power plant, amounted to more than €143 million. Lithuania has increased the prognosis of decommissioning costs from €2019 million in 2010 to €3376 million in 2015.


United States

The decommissioning can only be completed after the on-site storage of nuclear waste has been ended. Under the 1982
Nuclear Waste Policy Act The Nuclear Waste Policy Act of 1982 is a United States federal law which established a comprehensive national program for the safe, permanent disposal of highly radioactive wastes. * The US Congress amended the act in 1987 to designate Yucca Mo ...
, a "Nuclear Waste Fund", funded by tax on electricity was established to build a geologic repository. On May 16, 2014, collection of the fee was suspendedUnited States Senat
''Congressional Record Vol. 163, No. 90 (Senate - May 24, 2017)''
United States Reports (Government).
after a complaint by owners and operators of nuclear power plants. By 2021, the Fund had a balance of more than $44 billion, including interest. Later, the Fund has been put back into the general fund and is being used for other purposes. As the plan for the
Yucca Mountain nuclear waste repository The Yucca Mountain Nuclear Waste Repository, as designated by the Nuclear Waste Policy Act amendments of 1987, is a proposed deep geological repository storage facility within Yucca Mountain for spent nuclear fuel and other high-level radioact ...
has been canceled, DOE announced in 2021 the establishing of an interim repository for nuclear waste.''The feds have collected more than $44 billion for a permanent nuclear waste dump — here's why we still don't have one.''
CNBC, 19 Dec 2021
Because the government has failed to establish a central repository, the federal government pays about half-a-billion dollars a year to the utilities as penalty, to compensate the cost of storage at more than 80 ISFSI sites in 35 states as of 2021. As of 2021, the government had paid $9 billion to utility companies for their interim storage costs, which may grow to $31 billion or more. Nuclear waste costed the American taxpayers through the Department of Energy (DOE) budget as of 2018 about $30 billion per year, $18 billion for  nuclear power and $12 billion for waste from nuclear weapons programs.''The steep costs of nuclear waste in the U.S.''
Stanford Earth Matters magazine, 3 July 2018
KPMG estimated the total cost of decommissioning the US nuclear fleet as of 2018 to be greater than US$150 billion. About two-thirds can be attributed to costs for termination of the NRC operating licence; 25% to management of spent fuel; and 10% to site restoration. The decommissioning of only the three uranium enrichment facilities would have an estimated cost (2004) of US$18.7 to 62 billion, with an additional US$2 to 6 billion for the dismantling of a large inventory of depleted uranium hexafluoride. A 2004 GAO report indicated the "costs will have exceeded revenues by $3.5 billion to $5.7 billion (in 2004 dollars)" for the 3 enrichment facilities slated for decommissioning.United States General Accounting Offic
''URANIUM ENRICHMENT: Decontamination and Decommissioning Fund Is Insufficient to Cover Cleanup Costs.''
United States Reports (Government).


International collaboration

Organizations that promote the international sharing of information, knowledge, and experiences related to nuclear decommissioning include the
International Atomic Energy Agency The International Atomic Energy Agency (IAEA) is an intergovernmental organization that seeks to promote the peaceful use of nuclear technology, nuclear energy and to inhibit its use for any military purpose, including nuclear weapons. It was ...
, the Organization for Economic Co-operation and Development's Nuclear Energy Agency and the European Atomic Energy Community. In addition, an online system called the ''Deactivation and Decommissioning Knowledge Management Information Tool'' was developed under the
United States Department of Energy The United States Department of Energy (DOE) is an executive department of the U.S. federal government that oversees U.S. national energy policy and energy production, the research and development of nuclear power, the military's nuclear w ...
and made available to the international community to support the exchange of ideas and information. The goals of international collaboration in nuclear decommissioning are to reduce decommissioning costs and improve worker safety.


Decommissioning of ships, mobile reactors, and military reactors

Many warships and a few civil ships have used nuclear reactors for propulsion. Former Soviet and American warships have been taken out of service and their power plants removed or scuttled. Dismantling of Russian submarines and ships and American submarines and ships is ongoing. Russia has a fleet of nuclear-powered vessels in decommissioning, dumped in the
Barents Sea The Barents Sea ( , also ; , ; ) is a marginal sea of the Arctic Ocean, located off the northern coasts of Norway and Russia and divided between Norwegian and Russian territorial waters.World Wildlife Fund, 2008. It was known earlier among Russi ...
. Estimated cost for the decommissioning of the two K-27 and K-159 submarines alone was €300 million (2019),''Major European bank could help Russia lift its sunken nuclear submarines.''
Bellona, 18 March 2020
or $330 million.''Russia's ‘slow-motion Chernobyl’ at sea.''
BBC, 2 Sep 2020
Marine power plants are generally smaller than land-based electrical generating stations. The biggest American military nuclear facility for the production of weapons-grade plutonium was Hanford site (in the State of Washington), now defueled, but in a slow and problematic process of decontamination, decommissioning, and demolition. There is "the canyon", a large structure for the chemical extraction of
plutonium Plutonium is a chemical element; it has symbol Pu and atomic number 94. It is a silvery-gray actinide metal that tarnishes when exposed to air, and forms a dull coating when oxidized. The element normally exhibits six allotropes and four ...
with the
PUREX PUREX (plutonium uranium reduction extraction) is a chemical method used to purify fuel for nuclear reactors or nuclear weapons. It is based on liquid–liquid extraction ion-exchange. PUREX is the '' de facto'' standard aqueous nuclear reproc ...
process. There are also many big containers and underground tanks with a solution of water, hydrocarbons and
uranium Uranium is a chemical element; it has chemical symbol, symbol U and atomic number 92. It is a silvery-grey metal in the actinide series of the periodic table. A uranium atom has 92 protons and 92 electrons, of which 6 are valence electrons. Ura ...
-
plutonium Plutonium is a chemical element; it has symbol Pu and atomic number 94. It is a silvery-gray actinide metal that tarnishes when exposed to air, and forms a dull coating when oxidized. The element normally exhibits six allotropes and four ...
-
neptunium Neptunium is a chemical element; it has chemical symbol, symbol Np and atomic number 93. A radioactivity, radioactive actinide metal, neptunium is the first transuranic element. It is named after Neptune, the planet beyond Uranus in the Solar Syste ...
- cesium-
strontium Strontium is a chemical element; it has symbol Sr and atomic number 38. An alkaline earth metal, it is a soft silver-white yellowish metallic element that is highly chemically reactive. The metal forms a dark oxide layer when it is exposed to ...
(all highly radioactive). With all reactors now defueled, some were put in SAFSTOR (with their cooling towers demolished). Several reactors have been declared
National Historic Landmark A National Historic Landmark (NHL) is a National Register of Historic Places property types, building, district, object, site, or structure that is officially recognized by the Federal government of the United States, United States government f ...
s.


List of inactive or decommissioned civil nuclear reactors

A wide range of nuclear facilities have been decommissioned so far. The number of decommissioned nuclear reactors out of the
List of nuclear reactors This following is a list of articles listing nuclear reactors. By use * List of commercial nuclear reactors * List of inactive or decommissioned civil nuclear reactors * List of nuclear power stations * List of nuclear research reactors * L ...
is small. As May 2022, about 700 nuclear reactors have been retired from operation in several early and intermediate stages (cold shut-down, defueling, SAFSTOR, internal demolition), but only about 25 have been taken to fully " greenfield status". Many of these sites still host
spent nuclear fuel Spent nuclear fuel, occasionally called used nuclear fuel, is nuclear fuel that has been irradiated in a nuclear reactor (usually at a nuclear power plant). It is no longer useful in sustaining a nuclear reaction in an ordinary thermal reactor and ...
in the form of dry casks embedded in concrete filled steel drums. As of 2017, most nuclear plants operating in the United States were designed for a life of about 30–40 years and are licensed to operate for 40 years by the US Nuclear Regulatory Commission. As of 2020, the average age of these reactors was about 39 years. Many plants are coming to the end of their licensing period and if their licenses are not renewed, they must go through a decontamination and decommissioning process. Generally are not included the costs of storage of nuclear waste, including spent fuel, and maintenance of the storage facility, pending the realization of repository sites for long-term disposal,p. 246 (in the US Independent Spent Fuel Storage Installations ( ISFSI's). Thus many entities do not include the cost of managing spent nuclear fuel, removed from the plant areas that will be decommissioned. There are, however, large differences between countries regarding inclusion of certain costs, such as on-site storage of fuel and radioactive waste from decommissioning, dismanting of non-radioactive buildings and structures, and transport and (final) disposal of radioactive waste.,p. 61
The year of costs may refer to the value corrected for exchange rates and inflation until that year (e.g. 2020-dollars). The stated power in the list is preferably given in ''design net capacity'' (reference unit power) in MWe, similar to the List of commercial nuclear reactors.


United Kingdom The United Kingdom of Great Britain and Northern Ireland, commonly known as the United Kingdom (UK) or Britain, is a country in Northwestern Europe, off the coast of European mainland, the continental mainland. It comprises England, Scotlan ...


United States The United States of America (USA), also known as the United States (U.S.) or America, is a country primarily located in North America. It is a federal republic of 50 U.S. state, states and a federal capital district, Washington, D.C. The 48 ...

''Sites Undergoing Decommissioning''
U.S. Nuclear Regulatory Commission (NRC)
Map of ISFSI Locations
U.S.NRC, update Oct 2021


See also

*
Lists of nuclear disasters and radioactive incidents These are lists of nuclear disasters and radioactive incidents. Main lists * List of nuclear and radiation accidents and incidents * List of nuclear and radiation accidents by death toll * List of civilian nuclear accidents * List o ...
*
Marcoule Nuclear Site Marcoule Nuclear Site () is a nuclear facility in the Chusclan and Codolet communes, near Bagnols-sur-Cèze in the Gard department of France, which is in the tourist, wine and agricultural Côtes-du-Rhône region. The plant is around 25  ...
in France * Nuclear Decommissioning Authority * Nuclear entombment * Ship-Submarine Recycling Program


References


External links

*
NUCLEAR ENERGY AGENCY of the Organisation for Economic Co-operation & DevelopmentCost of Decommissioning Nuclear Energy Plants
(2016)
UNITED STATES NUCLEAR REGULATORY COMMISSION

Business Insider – UKGetting Rid Of Old Nuclear Reactors Worldwide Is Going To Cost Way More Than People Think

Germany's economy minister Sigmar Gabriel says state won't pay for nuclear decommissioning
(May 18, 2014)
Nuclear Decommissioning Report (www.ndreport.com) is the multi-media platform for the nuclear decommissioning industry.

decommissioning.info is a portal with information on nuclear decommissioning



European website on decommissioning of nuclear installations


rapport by the German Wuppertal Institute, commissioned by the
European Commission The European Commission (EC) is the primary Executive (government), executive arm of the European Union (EU). It operates as a cabinet government, with a number of European Commissioner, members of the Commission (directorial system, informall ...
. May 2007.
Master 'Nuclear Energy' – Decommissioning and Waste management
{{DEFAULTSORT:Nuclear Decommissioning Nuclear technology Nuclear power stations Radioactive waste Nuclear liability Radioactive contamination