The M6 Motorway is an under-construction motorway consisting of twin, 4-kilometre long tunnels linking the M8 Motorway at Arncliffe to President Avenue at
Kogarah Kogarah () is a suburb of Southern Sydney, in the state of New South Wales, Australia. Kogarah is located 14 kilometres (9 miles) south-west of the Sydney central business district and is considered to be the centre of the St George area. Loca ...
. Stage 1 started major construction in November 2021 and is expected to open by late 2025. The possibility of future extensions to the south will be accommodated by providing stub tunnels in the project. The project will include new shared cycle and pedestrian pathways, as well as a new pedestrian bridge across President Avenue. There will also be an upgrade of the Princes Highway and President Avenue intersection. As part of the motorway, a motorway control centre and tunnel ventilation facilities will be built. In June 2022, the NSW Government announced that some proposed major infrastructure projects including Stage 2 of the M6 Motorway, the Beaches Link and the
Great Western Highway Great Western Highway (also known as Broadway from to , Parramatta Road from Chippendale to , and Church Street through Parramatta) is a state highway in New South Wales, Australia. From east to west, the highway links Sydney with Bathurst, ...
Blackheath to Little Hartley Tunnel would be shelved indefinitely, due to market constraints and labour shortages.


History


Early proposals

Princes Motorway The Princes Motorway is a predominantly dual carriage untolled motorway that links Sydney to Wollongong and further south through the Illawarra region to . Part of the Australian Highway 1 network, the motorway is designated with the route ...
, formerly F6 Southern Freeway, is an existing motorway linking
Sydney Sydney ( ) is the capital city of the state of New South Wales, and the most populous city in both Australia and Oceania. Located on Australia's east coast, the metropolis surrounds Sydney Harbour and extends about towards the Blue Mountain ...
and
Wollongong Wollongong ( ), colloquially referred to as The Gong, is a city located in the Illawarra region of New South Wales, Australia. The name is believed to originate from the Dharawal language, meaning either 'five islands/clouds', 'ground near wate ...
, with its northern terminus currently at
Waterfall A waterfall is a point in a river or stream where water flows over a vertical drop or a series of steep drops. Waterfalls also occur where meltwater drops over the edge of a tabular iceberg or ice shelf. Waterfalls can be formed in several wa ...
. There had been previous proposals to extend the F6 northwards into inner Sydney since the 1950s, but no proposal has come into fruition. Only the six-lane Captain Cook Bridge and a short connecting section of
Taren Point Road Taren Point Road is a major road found in Taren Point and Caringbah, New South Wales, Australia. Taren Point Road starts from Captain Cook Bridge, Taren Point and continues to Gardere Street, Caringbah. Traffic travelling north heads towar ...
to the south were built and opened in May 1965 as part of the F6 extension proposal. In the mid 2010s, the F6 extension project was revived under the Liberal-National
coalition A coalition is a group formed when two or more people or groups temporarily work together to achieve a common goal. The term is most frequently used to denote a formation of power in political or economical spaces. Formation According to ''A Gui ...
state government. As part of modifications made during the planning stage of the
WestConnex WestConnex is a predominantly underground motorway scheme in Sydney, New South Wales, Australia. As of 2022, it is partially completed and partially still under construction. A joint project of the New South Wales and Australian governments, t ...
project, stub tunnels was added to the New M5 (now M8) tunnel to allow for an extension connection to it by the F6 extension. In June 2016 the
Roads & Maritime Services A road is a linear way for the conveyance of traffic that mostly has an improved surface for use by vehicles (motorized and non-motorized) and pedestrians. Unlike streets, the main function of roads is transportation. There are many types of ...
commenced
geotechnical Geotechnical engineering is the branch of civil engineering concerned with the engineering behavior of earth materials. It uses the principles of soil mechanics and rock mechanics for the solution of its respective engineering problems. It als ...
analysis to determine underground rock and soil conditions on the former F6 corridor from Waterfall to the
Sydney Orbital Network The Sydney Orbital Network is a 110 kilometre motorway standard ring road around and through Sydney, the capital of New South Wales in Australia. It runs north from Sydney Airport, underneath the CBD to the North Shore, west to the Hills Dist ...
at Rockdale with a view into developing a possible link between the Princes Motorway and the Orbital Network. It was further reported in October 2016 that any extension would be known as SouthConnex.


Current proposal

In June 2017, it was revealed that the state government had reviewed a 3.6 billion dollar train tunnel between Thirroul and Waterfall on the
Illawarra railway line The South Coast Railway (also known as the Illawarra Railway) is a commuter and goods railway line from Sydney to Wollongong and Bomaderry in New South Wales, Australia. Beginning at the Illawarra Junction, the line services the Illawarra an ...
that could reduce travel time between Sydney and Wollongong by 22 minutes, but that rail improvements were being sidetracked in favour of improving and extending the Motorway. Later in September 2017, a state government leak showed the extent of the route, to be carried out in multiple sections which would largely follow the original planned route. The leaked document referred to the road as South Link. Sections included tunnels to the northern side of the Captain Cook Bridge, a bridge duplication allowing for motorway traffic to use the existing bridge and local traffic to keep access. To the south of the bridge, a surface motorway would run through current parks and reserves which had been left for the original route, then run along the route of the current Princes Highway with tunnels bypassing the towns of Heathcote and Waterfall before joining the existing freeway. In October 2017, the government announced it will proceed with Stage 1 of the F6 extension, which will run via two 4 km tunnels linking the New M5 (now M8) tunnels at Arncliffe to President Avenue at Kogarah. Stage 1 was originally planned to start construction in 2020 and open to traffic in late 2024. In October 2019, the government announced a name change of the extension to "M6 Motorway", removing its reference to the defunct F6 name. The renaming to a different route number was due to general renaming of roads in NSW to reflect new national route numbers. Additionally the decision was made not to connect the future southern end of M6 at Loftus to the northern end of the M1 Princes Motorway at Waterfall, resulting in the two motorways to remain separated in the short-term. The completion date of Stage 1 was also pushed back to late 2025, with major construction planned to begin by early 2022. In December 2019, planning approval for M6 Stage 1 was granted. In June 2022, the NSW Government announced that some proposed major infrastructure projects including Stage 2 of the M6 Motorway would be shelved indefinitely, due to market constraints and labour shortages.


Construction

Prior to the start of major construction, associated construction works began on open spaces near the M6 corridor in August 2020. These include upgrades to Ador Park and McCarthy Reserve at Rockdale, and Brighton Memorial Playing Fields at Brighton-Le-Sands. The upgrades are due to the upcoming construction impacts on the open space and recreational facilities at Rockdale Bicentennial Park. In May 2021, the design and construction contract for Stage 1 was awarded to
CIMIC Group CIMIC Group Limited (formerly Leighton Holdings) is an Australian construction contractor. It is active in the telecommunications, engineering and infrastructure, building and property, mining and resources, and environmental services industries ...
's subsidiaries CPB and UGL, in a joint venture with Ghella. Major construction of Stage 1 began on 29 November 2021.


Tolls

Toll prices are proposed to be $2.44 each way when the first stage of M6 opens. However, as all traffic will have to utilise the M8, motorists will also have to pay
WestConnex WestConnex is a predominantly underground motorway scheme in Sydney, New South Wales, Australia. As of 2022, it is partially completed and partially still under construction. A joint project of the New South Wales and Australian governments, t ...
tolls in addition to the M6 toll.