Line 17 (Gold) () is an under construction
monorail A monorail is a Rail transport, railway in which the track consists of a single rail or beam. Colloquially, the term "monorail" is often used to describe any form of elevated rail or people mover. More accurately, the term refers to the style ...
project for the
São Paulo Metro The São Paulo Metro (, ), commonly called the ''Metrô'', is one of the rapid transit companies serving the city of São Paulo, alongside the Companhia Paulista de Trens Metropolitanos, São Paulo Metropolitan Trains Company (CPTM), Via Quatro ...
. The line will have 14 stations, beginning at the São Paulo-Morumbi station and ending at the Jabaquara station, with a branch to
Congonhas Congonhas (Congonhas do Campo until 1948) is a historical Brazilian city located in the state of Minas Gerais. It is situated south from Belo Horizonte, the capital of state of Minas Gerais, by the highway BR-040. As of 2020, the city had a popu ...
station, connected to the São Paulo/Congonhas Airport. It will have integration with Line 1-Blue, Line 4-Yellow, and Line 5-Lilac as well as CPTM Line 9-Emerald. The line was originally one of the transportation projects supporting the
2014 FIFA World Cup The 2014 FIFA World Cup was the 20th FIFA World Cup, the quadrennial world championship for list of men's national association football teams, men's national Association football, football teams organised by FIFA. It took place in Brazil fr ...
. However, delays and contract disputes have pushed the completion date from the original 2013 full opening date to 2026. Once completed, the line will be the first in the system to have a branch.


History

The line was originally envisioned to be long and should be opened in three stages. The first section was planned to be a long linking Congonhas-São Paulo Airport to São Judas Station, with an initial demand 18,000 passengers per day and construction start in 2011. The second phase, expected to have a demand of 100,000 passengers per day, was originally planned to begin operations in 2015. It should be long and connect the Morumbi CPTM station and the Jabaquara metro station. The two sections will connect at the future Brooklin Paulista station, forming a "Y". However delays and heritage preservation issues prevented the line from starting construction, leading it to be shelved in 2011. The line was revived soon after with a proposed first phase expanded to connecting Morumbi station and the Congonhas-São Paulo Airport with a daily demand forecast of 43,000 passengers and projected opening in the first half of 2014. The second phase will extend the line west to São Paulo–Morumbi Station increasing the projected ridership for the line to 166,000, while the third phase will continue from Washington Luiz station east towards Jabaquara metro station, bringing the daily ridership to an estimated 252,000. On 2 June 2011,
São Paulo Metro The São Paulo Metro (, ), commonly called the ''Metrô'', is one of the rapid transit companies serving the city of São Paulo, alongside the Companhia Paulista de Trens Metropolitanos, São Paulo Metropolitan Trains Company (CPTM), Via Quatro ...
awarded the Monotrilho Integracao, a consortium consisting of a
Malaysia Malaysia is a country in Southeast Asia. Featuring the Tanjung Piai, southernmost point of continental Eurasia, it is a federation, federal constitutional monarchy consisting of States and federal territories of Malaysia, 13 states and thre ...
n rail company
Scomi Rail Scomi Rail, formerly MTrans and Monorail Malaysia, was a Malaysian rail system manufacturer specializing in monorails. A subsidiary of Scomi Group, the company was one of the world's three leading providers of monorail systems, and one of only fo ...
, Brazil's second largest construction company
Andrade Gutierrez Andrade Gutierrez is a Brazilian private multinational conglomerate headquartered in Belo Horizonte. The company was founded in 1948, in Belo Horizonte, Minas Gerais by the Andrade and Gutierrez families. As of 2013, Andrade Gutierrez is the se ...
, CR Almeida and Montagens e Projetos Especiais a R$1.4bn turnkey contract to build Line 17. The consortium will be responsible for design, supply, installation and commissioning of the Sutra straddle monorail, including 24
Scomi SUTRA SUTRA, abbreviation for Scomi Urban Transit Rail Application, is a monorail electrical multiple unit (EMU) type train system designed by Malaysian rail company Scomi Rail. The design is currently the main product offering of Scomi Rail, which has ...
three-car trains to be provided by Scomi. The line was planned to be operated with CBTC using
Thales Thales of Miletus ( ; ; ) was an Ancient Greek philosophy, Ancient Greek Pre-Socratic philosophy, pre-Socratic Philosophy, philosopher from Miletus in Ionia, Asia Minor. Thales was one of the Seven Sages of Greece, Seven Sages, founding figure ...
SelTrac technology. On 9 June 2014, a concrete support beam collapsed during construction which killed one worker and injuring two others. Completion was scheduled for the start of the World Cup but construction was delayed due to issues with environmental approvals. As a result, the line was delayed until the second half of 2015. Construction stopped October 2015 due to a contract dispute with construction only to be resumed in June 2016. This delay postponed the opening date of the first phase to 2018. Further delays in the construction has meant that the first phase of the line was further postponed from 2018 to 2019. With the financial trouble of Scomi leading to non-performance in manufacturing the monorail rolling stock, the contract was terminated in 2019. After a short rebidding process it was announced that BYD will manufacture the rolling stock using their " SkyRail" platform. On 14 January 2020, a new contract was created, and completion was postponed to 2021 or 2022. In November 2020, after months of legal battles, the Metropolitan Company signed a contract with Coesa Engenharia, owned by Brazilian company OAS, for the conclusion of general construction works. The annual report of the São Paulo Metropolitan Company estimates the opening of the line on 30 April 2023. Before leaving the state government, Governor João Doria estimated the opening to January 2024. After another paralyzation in construction works and another resume, the State Metropolitan Transport Secretariat estimated the opening to June 2026.