HOME

TheInfoList



OR:

The High Marnham Test Track is a linear railway test track created in 2009 and centred on Lodge Lane, Tuxford, in Nottinghamshire in the United Kingdom. It houses Network Rail's Rail Innovation & Development Centre (RIDC), originally known as the Rail Vehicle Development Centre (RVDC). The main route is approximately long and rated for speeds up to . It is primarily formed of a former section of the Lancashire, Derbyshire and East Coast Railway running between Thoresby Colliery Junction at the western end, and High Marnham Power Station at the eastern end. Additionally a branchline diverges northwards over the Bevercotes Colliery Branch via Boughton Brake Tunnel to Bevercotes. The main test track passes on a bridge directly over the
East Coast Main Line The East Coast Main Line (ECML) is a electrified railway between London and Edinburgh via Peterborough, Doncaster, York, Darlington, Durham and Newcastle. The line is a key transport artery on the eastern side of Great Britain running broa ...
, at the location of the former Dukeries Junction interchange station, but without a rail connection being provided. Instead the test track is accessed from the national British railway network via Shirebrook Junction on the Robin Hood Line and the existing line from there to Thoresby Colliery Junction. Access for trains is protected by an
Annett's key In British, Australian, French, and Swiss railway signalling, an Annett's key is a form of trapped-key interlocking that locks levers or other items of signalling apparatus, thereby serving as a portable form of interlocking. The purpose is to ...
under the supervision of an Engineering Technical Officer. There is no signalling on the line owing to theft and vandalism, including the previous destruction of the Ollerton Colliery signal box.


Re-opening

On 10 February 2009 975025 ''Caroline'' visited the line on inspection duties prior to re-opening. Network Rail announced their intention for the reopening between Thoresby Colliery Junction and High Marnham on 10 July 2009. In August 2009 Network Rail stated that because the route of the line would now be maintained, it might increase the likelihood of being able to restore a passenger service in connection with Robin Hood Line services at a later date. In November 2011 local people were reminded about the operational nature of the test track following acts of trespass. During 2012 the Branch Line Society announced their intention to run a railtour covering the main test track and special steep gradients; plus the Bevercotes Branch to a distance of . Such a tour ran on 5 January 2013 and was widely reported in the railway enthusiast press. This line has been identified by Campaign for a Better Transport as a priority 1 candidate for reopening.https://bettertransport.org.uk/sites/default/files/research-files/case-for-expanding-rail-network.pdf


Facilities

The test track includes short sections of non-energised
25 kV AC railway electrification Railway electrification systems using alternating current (AC) at are used worldwide, especially for high-speed rail. It is usually supplied at the standard utility frequency (typically 50 or 60Hz), which simplifies traction substations. The dev ...
and non-energised third/fourth rail, a W6A
loading gauge A loading gauge is a diagram or physical structure that defines the maximum height and width dimensions in railway vehicles and their loads. Their purpose is to ensure that rail vehicles can pass safely through tunnels and under bridges, and ke ...
, and facilities for ERA Technical Specifications for Interoperability (TSI) noise testing. An area of special track exists for RIS-1530-PLT testing of on-track plant, including lengths of track for brake testing at up to 1:25 and sharp reverse curves. The Lodge Lane area also contains portacabins for visiting staff, and a inspection shed for railway vehicles.


Projects

In March 2012 braking tests were undertaken for fitments of improved
hydraulic brake A hydraulic brake is an arrangement of braking mechanism which uses brake fluid, typically containing glycol ethers or diethylene glycol, to transfer pressure from the controlling mechanism to the braking mechanism. History During 1904, Frederick ...
s to 450 road-rail vehicle
excavator Excavators are heavy construction equipment consisting of a boom, dipper (or stick), bucket and cab on a rotating platform known as the "house". The house sits atop an undercarriage with tracks or wheels. They are a natural progression fro ...
s. These excavators were all falling under classification "type 9b" where the rubber wheel touch small flanged steel wheels, which in-turn touch the rails and were found to have significantly reduced braking performance in adverse conditions. In August 2012 the line was used for the testing of
RFID Radio-frequency identification (RFID) uses electromagnetic fields to automatically identify and track tags attached to objects. An RFID system consists of a tiny radio transponder, a radio receiver and transmitter. When triggered by an electromag ...
and iPad-based "Virtual Lineside Signalling". Funding came from a Department of Transport £100,000-grant to investigate the possibility for low cost system for locations where
European Rail Traffic Management System The European Rail Traffic Management System (ERTMS) is the system of standards for management and interoperation of signalling for railways by the European Union (EU). It is conducted by the European Union Agency for Railways (ERA) and is the o ...
installation is not viable. RFID tags are placed on the track, and contact with a central signalling location is maintained by using encryption over traditional GSM networks and off-the-shelf portable computers used for the cab display. In October 2013 a new high output "factory train" which will be used on
Great Western Main Line The Great Western Main Line (GWML) is a main line railway in England that runs westwards from London Paddington to . It connects to other main lines such as those from Reading to Penzance and Swindon to Swansea. Opened in 1841, it was the or ...
electrification is due to be brought from Germany to the test track for trialling and staff familiarisation.


References


Sources

*


External links

* {{coord, 53.225389, -0.881288, region:GB_dim:10000_source:OSM, display=title Railway test tracks Network Rail 2009 establishments in England Railway lines in the East Midlands