HOME

TheInfoList



OR:

The Edinburgh Glasgow Improvement Programme or EGIP was an initiative funded by
Transport Scotland Transport Scotland () is the national transport agency of Scotland. It was established by the Transport (Scotland) Act 2005, and began operating on 1 January 2006 as an executive agency of the Scottish Government. Transport Scotland, an execut ...
on behalf of the
Scottish Government The Scottish Government (, ) is the executive arm of the devolved government of Scotland. It was formed in 1999 as the Scottish Executive following the 1997 referendum on Scottish devolution, and is headquartered at St Andrew's House in ...
to increase capacity on the main
railway line Rail transport (also known as train transport) is a means of transport using wheeled vehicles running in tracks, which usually consist of two parallel steel rails. Rail transport is one of the two primary means of land transport, next to road ...
between
Edinburgh Edinburgh is the capital city of Scotland and one of its 32 Council areas of Scotland, council areas. The city is located in southeast Scotland and is bounded to the north by the Firth of Forth and to the south by the Pentland Hills. Edinburgh ...
and
Glasgow Glasgow is the Cities of Scotland, most populous city in Scotland, located on the banks of the River Clyde in Strathclyde, west central Scotland. It is the List of cities in the United Kingdom, third-most-populous city in the United Kingdom ...
, with new, longer electric trains running by 2017 and scheduled for full completion in 2019. It was expected to cost £742 million and delivered by
Network Rail Network Rail Limited is the owner (via its subsidiary Network Rail Infrastructure Limited, which was known as Railtrack plc before 2002) and railway infrastructure manager, infrastructure manager of most of the railway network in Great Britain. ...
. The programme was initially announced by the Labour-
Liberal Democrat Several political parties from around the world have been called the Liberal Democratic Party, Democratic Liberal Party or Liberal Democrats. These parties have usually followed liberalism as ideology, although they can vary widely from very progr ...
coalition government A coalition government, or coalition cabinet, is a government by political parties that enter into a power-sharing arrangement of the executive. Coalition governments usually occur when no single party has achieved an absolute majority after an ...
in 2006, and was continued, although cut back from the original scheme, by the subsequent
Scottish National Party The Scottish National Party (SNP; ) is a Scottish nationalist and social democratic party. The party holds 61 of the 129 seats in the Scottish Parliament, and holds 9 out of the 57 Scottish seats in the House of Commons of the United Kingdom, ...
governments. It was officially completed on 4 October 2021 with the completion of the redevelopment of the Glasgow Queen Street station.


Aims

The project aimed to deliver the infrastructure to enable 8 car, electric trains to operate (an increase from the previous 6 car maximum) on Edinburgh - Glasgow services with a fastest journey time of 42 minutes. The additional train carriages were to allow a total increase in capacity of 30%. The project was also designed to deliver electrification of of track including diversionary routes through
Cumbernauld Cumbernauld (; ) is a large town in the Shires of Scotland, historic county of Dunbartonshire and council area of North Lanarkshire, Scotland. It is the tenth List of towns and cities in Scotland by population, most-populous locality in Scotl ...
and Falkirk.


Timeline of planned improvements

* December 2013 - Haymarket Station redevelopment opens. * May 2014 - Glasgow - Cumbernauld electrification complete. * May 2015 - Haymarket - Inverkeithing signalling renewals complete. * July 2015 -
Winchburgh Winchburgh is a village in the Subdivisions of Scotland, council area of West Lothian, Scotland. It is located approximately west of the city centre of Edinburgh, east of Linlithgow and northeast of Broxburn, West Lothian, Broxburn. Demograp ...
Tunnel clearance completed. * April 2016 - 61 Bridges and structures cleared for electrification. * August 2016 -
Glasgow Queen Street Glasgow Queen Street () is a passenger railway terminus serving the city centre of Glasgow, Scotland. It is the smaller of the city's two mainline railway terminals (the larger being Glasgow Central) and is the third-busiest station in Scotland ...
(High Level) tunnel track and trackbed replacement completion. * October 2016 - Platform extensions at
Linlithgow Linlithgow ( ; ; ) is a town in West Lothian, Scotland. It was historically West Lothian's county town, reflected in the county's historical name of Linlithgowshire. An ancient town, it lies in the Central Belt on a historic route between Edi ...
, Croy,
Polmont Polmont () is a village in the Falkirk council area of Central Scotland. It lies towards the east of the town of Falkirk, north of the Union Canal (Scotland), Union Canal, which runs adjacent to the village. Due to its situation in Central Sco ...
and Falkirk High. * December 2016 - Platform extensions at
Edinburgh Waverley Edinburgh Waverley (also known simply as Edinburgh; ) is the principal railway station serving Edinburgh, Scotland. It is the second busiest station in Scotland, after Glasgow Central. The station serves as the northern terminus of the East C ...
. * December 2016 - Electrification of the Edinburgh to Glasgow via Falkirk High Line. * December 2016 -
Edinburgh Gateway Edinburgh Gateway station is a railway station and interchange at Gogar in Edinburgh, Scotland, which opened on 11 December 2016. It is served by ScotRail and Edinburgh Trams, and serves both Gogar and Edinburgh Airport, to which it is connect ...
station opened. * 2017 - Millerhill Depot in Millerhill Marshalling Yard opens. * December 2017 - Delivery of first new Hitachi Class 385 trains. * July 2018 - First Hitachi Class 385 EMUs enter service. * December 2018 - Platform extensions at
Glasgow Queen Street Glasgow Queen Street () is a passenger railway terminus serving the city centre of Glasgow, Scotland. It is the smaller of the city's two mainline railway terminals (the larger being Glasgow Central) and is the third-busiest station in Scotland ...
. * December 2018 - Electrification of the Cumbernauld - Falkirk line. * 4 October 2021 - The redevelopment of Glasgow Queen Street station was officially completed.


Previous proposals

As originally announced in 2006, the project would have cost £1 billion and aimed to increase capacity by increasing service frequency to 6tph rather than by lengthening trains. Transport Scotland commissioned
Jacobs Jacobs may refer to: Businesses and organisations *Jacob's, a brand name for several lines of biscuits and crackers in Ireland and the UK * Jacobs (coffee), a German brand of coffee * Jacobs Solutions, an American international technical professi ...
to examine the project for potential savings and they identified that the a similar capacity increase could be achieved by increasing train length while maintaining a 4tph frequency. This had previously been thought to be impossible due to restrictions at Glasgow Queen Street station. The redevelopment of Buchanan Galleries allowed this option to be developed instead with a major rebuild and the lengthening of platforms at Queen St high level station. This enabled several major schemes to be dropped from the scope of EGIP as they were only required if an increase in train frequency took place: * Construction of turnback sidings at Abbeyhill Junction and . * Remodelling of Greenhill Junction to provide a non-conflicting junction; * Construction of a new chord line at Dalmeny to allow trains from the west to access the Haymarket north lines without obstructing existing services at the junction on approach to the station.. Another proposed scheme the Garngad Chord, near had already been dropped from the scheme. It was intended to allow Glasgow-Cumbernauld services to use the North Clyde Line into Queen Street Low Level, thus freeing up capacity on the High Level station. Instead services started on this route in 2014 with a reversal in Springburn, creating a slightly longer journey time. Electrification to
Stirling Stirling (; ; ) is a City status in the United Kingdom, city in Central Belt, central Scotland, northeast of Glasgow and north-west of Edinburgh. The market town#Scotland, market town, surrounded by rich farmland, grew up connecting the roya ...
, and was originally reported to have been dropped as part of the changes to EGIP. Electrification is continuing and is expected to be complete by 2018; it has been carried out under the rolling programme of electrification, rather than as part of the EGIP programme.


Criticism

The new proposals were criticised by business and environmental groups. Sustainable transport campaign group Transform Scotland described the cuts as 'a major step backwards' and suggested that the government's concurrent decision to bring forward a £3 billion project to dual the A9 road demonstrated a 'perverse set of priorities'. The fastest journey times between Glasgow and Edinburgh under the scheme will now be 42 minutes compared to the just over half an hour previously promised. One of the most disruptive elements of the project was the complete closure of Glasgow Queen Street High Level for a 20-week period between March and August 2016. This was to allow replacement of the track in the Cowlairs Tunnel and the lowering of the track bed to accommodate the installation of overhead electrification equipment in the tunnel. ScotRail warned that the diversion works created a potential
single point of failure A single point of failure (SPOF) is a part of a system that would Cascading failure, stop the entire system from working if it were to fail. The term single point of failure implies that there is not a backup or redundant option that would enab ...
which could paralyse Glasgow's rail network in the event of a train failure or other incident.


See also

* Airdrie–Bathgate rail link *
Glasgow Airport Rail Link The Glasgow Airport Rail Link (GARL) is a proposed link between Glasgow City Centre and Glasgow Airport. The original plans for an airport rail link were proposed during the 2000s to directly link Glasgow Central railway station, Glasgow Centr ...
* History of rail transport in Great Britain 1995 to date


References


External links

* {{Railway lines in Scotland Rail infrastructure in Scotland Electrification Railway lines in Scotland Scottish Government Transport in Edinburgh Transport in Glasgow 2006 establishments in Scotland Transport in Falkirk (council area) Transport in East Dunbartonshire Transport in West Lothian