550 South Tryon (formerly the Duke Energy Center) is a tall, 48-floor (54 floors including mechanical floors)
skyscraper A skyscraper is a tall continuously habitable building having multiple floors. Most modern sources define skyscrapers as being at least or in height, though there is no universally accepted definition, other than being very tall high-rise bui ...
in Charlotte,
North Carolina North Carolina ( ) is a U.S. state, state in the Southeastern United States, Southeastern region of the United States. It is bordered by Virginia to the north, the Atlantic Ocean to the east, South Carolina to the south, Georgia (U.S. stat ...
. When completed in 2010, it was the largest building in Charlotte (in square footage), second tallest building in Charlotte, 63rd tallest building in the United States, and the tallest in the world to use precast double tees.


History

Duke Power Duke Energy Corporation is an American electric power and natural gas holding company A holding company is a company whose primary business is holding a controlling interest in the Security (finance), securities of other companies. A hold ...
chief executive Bill Lee had put together the property in the 1990s, intending to build Duke's headquarters there, but the company dropped its plans and sold the land to Wachovia.


Development Years

Originally, the building was to be known as the Wachovia Corporate Center. It was to replace One Wachovia Center as the headquarters of
Wachovia Wachovia was a diversified financial services company based in Charlotte, North Carolina. Before its acquisition by Wells Fargo and Company in 2008, Wachovia was the fourth-largest bank holding company in the United States, based on total asset ...
. Wachovia was to occupy of the tower. The first floor of the building was to contain the main lobby and elevators. The second floor was to have Wachovia's
server room A server room is a room, usually air-conditioned, devoted to the continuous operation of computer servers. An entire building or station devoted to this purpose is a data center. The computers in server rooms are usually headless systems that c ...
. The third floor would have been occupied by training areas during the day and classrooms at night. This area was to have been shared by Wachovia and Wake Forest University, which was to use it for its MBA courses. Floors four through seven were to contain the trading floor. It would have taken up and housed approximately 750 traders per floor. Wachovia would also have used floors 36 through 48. After Wells Fargo announced its purchase of Wachovia, Duke (by this time called Duke Energy) more than doubled the space it planned to use from to and the name changed to Duke Energy Center. In addition to the upper floors Wachovia would have used, Duke planned to use floors 15 through 22. Wells Fargo, which still owned the building, planned to occupy five of its 14 floors late in 2010.
KPMG KPMG is a multinational professional services network, based in London, United Kingdom. As one of the Big Four accounting firms, along with Ernst & Young (EY), Deloitte, and PwC. KPMG is a network of firms in 145 countries with 275,288 emplo ...
and Katten Muchin Rosenman moved into the building in February 2010, while Duke Energy moved later in 2010. Originally law firm Sonnenschein announced it would lease on the 34th and 35th floors and
Deloitte Deloitte is a multinational professional services network based in London, United Kingdom. It is the largest professional services network in the world by revenue and number of employees, and is one of the Big Four accounting firms, along wi ...
leased of space. After acquiring Wachovia, Wells Fargo still had reserved of space. However, in September 2009 the company stated they were open to leasing out 25% of that space. At that time they were committed to using 10 floors of the building. Prior to Wells Fargo purchasing Wachovia,
Duke Energy Duke Energy Corporation is an American electric power and natural gas holding company headquartered in Charlotte, North Carolina. The company ranked as the 141st largest company in the United States in 2024 – its highest-ever placement on the ...
was planning to occupy of space. In February 2009, Duke announced it would occupy and become the building's primary tenant. The building was rebranded as Duke Energy Center. Duke announced plans to occupy floors 15 through 22 and 36-48. Originally,
Wake Forest University Wake Forest University (WFU) is a private research university in Winston-Salem, North Carolina, United States. Founded in 1834, the university received its name from its original location in Wake Forest, north of Raleigh, North Carolina. The R ...
had planned to locate the Charlotte campus of its Babcock Graduate School of Management in the tower, occupying approximately . However, Wake Forest pulled out of the project after the purchase of Wachovia by Wells Fargo.


Post-Completion

In August 2010 Commercial real estate firm Cassidy Turley announced it had signed a lease to occupy on the 34th floor of the building. The firm will taking part of the formerly leased by law firm Sonnenschein Nath & Rosenthal in 2008. In 2009 the law firm closed its Charlotte office. In August 2012 Babson Capital Management announced they have signed a lease for in the building on the 33rd and 34th floors. The move gave the company a 50% space increase from its former space in
Charlotte Plaza Charlotte Plaza is a tall skyscraper in Charlotte, North Carolina. It was built in 1982 and has 27 floors. It is the 20th-tallest building in the city. The Class A office building is owned by Rabina Properties, LLC. The ground and second floor ...
. The extra space was to support the company's 49% in the last 63 years. In November 2012 Wells Fargo started utilizing for several trading floors. The new space could hold 1,500 employees spread across two trading floors. It became the bank's largest hub for the bank's investment banking and capital markets division. Wells Fargo has announced it would exit its lease at One Wells Fargo Center at the end of 2021. Currently it is the largest tenant with . The company has been consolidating its Charlotte footprint with leasing the entire 300 South Brevard building, expanding their employee space in the building following Duke's departure, and relocating additional employees in Three Wells Fargo Center.


550 South Tryon

Duke Energy's departure left several large blocks of continuous space available, including on floors 7 to 14, on 15 to 21, on 30 to 32 and on the top floors, 40 to 42. As of December 31, 2021, Duke had exited its lease of the building. All Duke employees left the building before the holidays. The Duke Energy Center signs and plaques were removed and the building was temporarily renamed 550 South Tryon. After Wells Fargo moves into space previous occupied by Duke Energy the company will occupy 95% of the building. The bank will be renovating 21 floors of the building and the food court. On June 15, 2025 Wells Fargo used a helicopter to place the words "Wells Fargo" on both sides of the top part of the building, known as the handlebar roof.


Construction

The project was announced in the spring of 2004, and official renderings were not released until December 6, 2006. In the original petition to the Charlotte-Mecklenburg Planning Commission, the building was going to be built on a parcel next to
400 South Tryon 400 South Tryon, formerly called the Wachovia Center, is a skyscraper in Charlotte center city, North Carolina. When it was being built, there were rumors that the developer intended to add ten more floors to pass Bank of America Plaza, and be ...
, with a height of and 34 floors. The site preparation began with the demolition of a Firestone Tire dealership in February 2006, and on February 28, 2006, the excavation and blasting of a -deep hole for the below-grade parking garage began. Over of explosives were used during its excavation and it took just over 60,000 dump truck loads to remove all of the excavated material from the site, some of which was used in the construction of a third runway at Charlotte-Douglas International Airport. The building was constructed by Batson-Cook Construction, with ready mix products from Concrete Supply Co. and structural engineering firm TRC International Ltd, of
Sarasota Sarasota () is a city in and the county seat of Sarasota County, Florida, United States. It is located in Southwest Florida, the southern end of the Tampa Bay area, and north of Fort Myers and Punta Gorda. Its official limits include Sarasota Ba ...
,
Florida Florida ( ; ) is a U.S. state, state in the Southeastern United States, Southeastern region of the United States. It borders the Gulf of Mexico to the west, Alabama to the northwest, Georgia (U.S. state), Georgia to the north, the Atlantic ...
. The building core is constructed with poured-in-place concrete while the floor structures utilize precast
double tee A double tee or double-T beam is a load-bearing structure that resembles two T-beams connected to each other side by side. The strong bond of the flange (horizontal section) and the two webs (vertical members, also known as stems) creates a struc ...
s, a structural method typically seen in parking decks. These double tees span between the poured-in-place core and perimeter systems. The concrete used for the building is . The building received a certificate of occupancy on December 23, 2009, with the lobby and parking garage opening on January 2, 2010.


Features

It is the tallest building in the Levine Center for the Arts (formerly the Wells Fargo Cultural Campus) and the largest building in Charlotte, which will have a footprint. The complex will also include a 46-floor condominium tower (future), the
Harvey B. Gantt Center for African-American Arts + Culture Harvey, Harveys or Harvey's may refer to: Arts, entertainment, and media * ''Harvey'' (play), a 1944 play by Mary Chase about a man befriended by an invisible anthropomorphic rabbit * Harvey Awards ("Harveys"), one of the most important awards ...
, the Mint Museum Uptown, the Knight Theater, the Bechtler Museum of Modern Art, and a History Museum. The building has achieved
LEED Leadership in Energy and Environmental Design (LEED) is a Green building certification systems, green building certification program used worldwide. Developed by the non-profit U.S. Green Building Council (USGBC), it includes a set of rating ...
Platinum status by including water-saving plumbing devices, a water storage system that will treat rainwater to be used for cooling tower make-up water, and a
green roof A green roof or living roof is a roof of a building that is partially or completely covered with vegetation and a growing medium, planted over a waterproofing membrane. It may also include additional layers such as a root barrier and drainage ...
. Rock that was blasted for the parking structure is being recycled by hauling it to a local quarry, where it will be crushed for gravel. The facade of the structure is illuminated by hundreds of programmable color-changing LED and metal halide luminaires with design work by Gabler-Youngston Architectural Lighting Design. The facade lighting system provides various shows and effects. Due to the tower's high visibility over the east corner of
Bank of America Stadium Bank of America Stadium is a 74,867-seat multi-purpose stadium located on in the Uptown section of Charlotte, North Carolina, United States. It is the home facility and headquarters of the Carolina Panthers of the National Football League (NFL ...
, the LED lights are used during key moments of sporting events played there. For example, if the
Carolina Panthers The Carolina Panthers are a professional American football team based in Charlotte, North Carolina. The Panthers compete in the National Football League (NFL) as a member of the National Football Conference (NFC) NFC South, South division. The t ...
are playing, the tower lights up blue for Panthers touchdowns. During the
ACC Championship Game The ACC Championship Game is an annual American college football game held in early December by the Atlantic Coast Conference (ACC) each year to determine its football champion. From its inception in 2005 to 2019, and from 2021 to 2022, the gam ...
, whenever a team scores a touchdown, it lights up in that team's color.


See also

*
List of tallest buildings in Charlotte File:Skyline of Charlotte 2016.jpg, 350px, Skyline of Charlotte (Use cursor to identify buildings) poly 2920 668 2940 252 3044 104 3140 292 3172 428 3204 1380 3160 1384 3145 668 Bank of America Corporate Center poly 360 594 630 594 628 1266 600 ...
* Levine Center for the Arts *
List of tallest buildings in North Carolina This list of tallest buildings in North Carolina ranks skyscrapers in the United States of America, U.S. state of North Carolina by height. The tallest building in North Carolina is the Bank of America Corporate Center in Charlotte, which contain ...
*
List of tallest buildings in the United States The world's first skyscraper was built in Chicago in 1885. Since then, the United States has been home to some of the world's tallest skyscrapers. New York City, and especially the borough of Manhattan, has the tallest skyline in the country. E ...