HOME

TheInfoList



OR:

Chilime Hydropower Company Limited (Chilime) was incorporated in 1995 with an objective of hydroelectricity generation through optimal utilization of resources within the country. Nepal Electricity Authority (NEA) holds majority ownership with 51% share holding. Remaining 49% shareholding is from general public including 10% equity ownership of local people. Chilime owns and operates 22.1 MW power plant commissioned on August 25, 2003 and located in Rasuwa district, 133 km north of capital city Kathmandu. It sales bulk electricity to NEA at the long term PPA price. The annual energy generation from the plant is about 150 GWh.


Gallery

File:Chilime Dam.JPG, Dam of Chilime Hydropower File:Chilime Switchyard.jpg, Switchyard


See also

* Kaligandaki A * Nepal Electricity Authority


References

* {{GeoGroupTemplate Hydroelectric power stations in Nepal Dams in Nepal Run-of-the-river power stations Dams completed in 2003 Energy infrastructure completed in 2003 2003 establishments in Nepal Buildings and structures in Rasuwa District