Casa-Port Railway Terminal (, french: link=no, Gare de Casa-Port) is an
ONCF
ONCF (from French: ''Office National des Chemins de Fer''; ar, المكتب الوطني للسكك الحديدية ''Al-Maktab al-Waṭaniy lil-Sikak al-Ḥadīdiyyah''; ''Moroccan National Railways Office'') is Morocco's national railway oper ...
(, "Moroccan National Railway") station in the centre of
Casablanca, near the
Port of Casablanca. It is served by suburban, regional and long-distance trains and is one of the major Casablanca stations, together with .
Layout
The station is a terminus, with 6 tracks and 4 platforms. Most notably, it is served by the
Train Navette Rapide
''Train Navette Rapide'' ("Fast Shuttle Train", more commonly known as the "TNR" or "Aouita") is a Moroccan rail service operated by the ONCF. Its first phase runs from Casablanca to Kénitra with a half-hourly service in each direction, betwe ...
(TNR) from Casablanca to
Kénitra via
Rabat.
Renovation

The terminal went through a renovation from 2008 to September 2014.
The project included modernizing the rail infrastructure and platforms, as well as building a new passenger area, shops, and a 500-place underground car park, in addition to of office space.
ONCF
ONCF (from French: ''Office National des Chemins de Fer''; ar, المكتب الوطني للسكك الحديدية ''Al-Maktab al-Waṭaniy lil-Sikak al-Ḥadīdiyyah''; ''Moroccan National Railways Office'') is Morocco's national railway oper ...
's total investment is around 100 million
MAD.
During the renovation, access to the platforms was via a temporary passenger building on the Boulevard Moulay Abderrahmane. Boarding and alighting points were moved to allow train movements without interruption to other traffic.
After the works are complete, the station will comprise 8 tracks with 5 platforms and have a capacity of 20 trains per hour (t.p.h.), handling 10,000 passengers a day.
The reconstruction works had several setbacks. The initial plan for the works, managed by the ONCF with
AREP
AREP (french: Amenagement, Recherche, Pole d'Echanges, "Management, Research, Interchange") is a multidisciplinary consultancy that is wholly owned by SNCF (Stations and Connections division). It was formed in 1997 by Jean-Marie Duthilleul and ...
/Groupe 3A as contractors, was for them to end in 2012, then in 2013.
The trickiest part of the construction was new underground levels in unstable soil, close to the sea – in 2010 the whole site was flooded – and the contractor's failure, which meant re-tendering to a wider market of larger contractors.
Despite multiple delays in the construction project, the brand new railway station was inaugurated on 25 September 2014 in the presence of King
Mohammed VI.
Local transport
The station is accessible by taxi. A station on
Casablanca Tramway
, color =
, logo = Logo-casatramway.png
, logo_width =
, logo_alt =
, image = Casablance tram Citadis placedesnatio ...
Line 1 is about away, in the Place des Nations Unies.
References
External links
Official website of ONCF
Railway stations in Casablanca
Buildings and structures in Casablanca
Transport in Casablanca
Railway stations opened in 1907
Railway stations serving harbours and ports
{{Morocco-railstation-stub