The C Line Extension is a project by the
Los Angeles County Metropolitan Transportation Authority The Los Angeles County Metropolitan Transportation Authority (LACMTA), commonly branded as Metro, LA Metro, and L.A. Metro, is the state agency that plans, operates, and coordinates funding for most of the transportation system in Los Angeles ...
to extend the C Line (formerly known as the Green Line) from its terminus in
Redondo Beach Redondo Beach (Spanish for ''round'') is a coastal city in Los Angeles County, California, United States, located in the South Bay (Los Angeles County), South Bay region of the Greater Los Angeles area. It is one of three adjacent Beach Cities, b ...
to Torrance. It is expected to open for service between 2030 and 2033. The project was known as the South Bay Metro Light Rail Extension in planning. The project will become an extension of the K Line upon the completion of LAX/Metro Transit Center station in late 2024, which will become the C Line's new western terminus and allow K Line trains to terminate at
Redondo Beach station Redondo Beach station is an elevated light rail station on the C Line of the Los Angeles Metro Rail system. It is located over Marine Avenue in the city of Redondo Beach, California, after which the station is named. It is currently the western ...
.


Overview

Metro Metro, short for metropolitan, may refer to: Geography * Metro (city), a city in Indonesia * A metropolitan area, the populated region including and surrounding an urban center Public transport * Rapid transit, a passenger railway in an urban ...
is currently working on the initial environmental study of a corridor extension of the C Line from its Redondo terminus toward the southeast. The extension would roughly follow the Harbor Subdivision
right of way Right of way is the legal right, established by grant from a landowner or long usage (i.e. by prescription), to pass along a specific route through property belonging to another. A similar ''right of access'' also exists on land held by a gov ...
into the South Bay, to the proposed Torrance Regional Transit Center (RTC). A study of the South Bay Extension was necessary to initiate the publication of a Draft Environmental Impact Report (DEIR). The study was expected to be completed in 2011, but the project was placed on hold in the Spring of 2012 due to uncertain funding. With the passage of Measure M in 2016, $619 million was earmarked for the Green Line Extension south and the study resumed. The environmental impact report was scheduled to be released in March 2022, but was ultimately pushed back to fall/winter 2022. Preparing the report led the agency to study further alternatives for grade separations along the two routes. The draft environmental impact report was eventually released in January 2023.


Route selection

Four potential routes for the extension starting at
Redondo Beach station Redondo Beach station is an elevated light rail station on the C Line of the Los Angeles Metro Rail system. It is located over Marine Avenue in the city of Redondo Beach, California, after which the station is named. It is currently the western ...
were initially considered. The station in Lawndale was eliminated due to community opposition. Metro authorized two of four alternatives to move forward: Alternative #1 and Alternative #3. Metro staff recommended the two alternatives into the draft environmental impact statement (DEIR) status for further analysis and refinement in September 2018. The study area includes the former Harbor Subdivisions right of way. The extension study consists of the
Redondo Beach station Redondo Beach station is an elevated light rail station on the C Line of the Los Angeles Metro Rail system. It is located over Marine Avenue in the city of Redondo Beach, California, after which the station is named. It is currently the western ...
to the
Torrance Transit Center The Torrance Transit Center (officially the Mary K. Giordano Regional Transit Center) is planned a bus station in Torrance that will serve as the city's transport hub. It opened on June 9, 2023. The station is planned to serve as the southern te ...
, a extension study area. Metro began composing the DEIR in January 2021 and released it in January 2023. The first alternative has been expanded into two, differing in whether the alignment is mainly built above grade over the existing ROW or in an open-air trench under the current ROW (with the freight ROW being rebuilt afterward). The route and stations are identical between the two options. The following table shows all potential Metro stations and the alternatives for which they apply: According to the LA County Expenditure Plan ( Measure M), groundbreaking for the project is scheduled for 2026, with an expected opening in 2030–2033, as of 2022. The timeline is expected to be accelerated under the
Twenty-eight by '28 The Twenty-eight by '28 initiative is an effort set forth by former Mayor Eric Garcetti that the City of Los Angeles complete 28 transportation infrastructure projects before the start of the 2028 Summer Olympics on and the 2028 Summer Paralymp ...
initiative. On August 16, 2023, Metro conducted a survey in regards to the C Line extension, in which 67% of the voters supported the project. After releasing an Draft Environmental Impact Review (EIR) of the project on January 27, 2023, 66% of the comments prefer extending the C Line using the Metro ROW option.


References


External links


C Line (Green) Extension to Torrance

South Bay Metro Light Rail Extension
(old Metro page) {{Los Angeles County Metropolitan Transportation Authority 2030 in rail transport Transportation in Los Angeles Los Angeles County Metropolitan Transportation Authority Los Angeles Metro Rail projects Public transportation in Los Angeles Public transportation in Los Angeles County, California Proposed railway lines in California