Bukit Panjang LRT Line
   HOME

TheInfoList



OR:


, color = , logo = BPLRT logo.svg , logo_width = 250px , logo_alt = Logo of Bukit Panjang LRT line , image = File:BP1 Choa Chu Kang LRT Platform 1 20210217 155354.jpg , image_width = 280px , caption = C801A trains in a two-car formation on the Bukit Panjang LRT , type =
Automated guideway transit An automated guideway transit (AGT) or automated fixed-guideway transit or automatic guideway transit system is a type of fixed guideway transit infrastructure with a riding or suspension track that supports and physically guides one or more dri ...

People mover A people mover or automated people mover (APM) is a type of small-scale automated guideway transit system. The term is generally used only to describe systems serving relatively small areas such as airports, downtown districts or theme parks ...
, system =
Light Rail Transit (Singapore) The Light Rail Transit system, locally known by the Acronym, initialism LRT, are a series of localised automated guideway transit (AGT) systems in Singapore which acts as feeder services to the rapid transit, heavy rail Mass Rapid Transit (Sing ...
, status = Operational , locale =
Singapore Singapore, officially the Republic of Singapore, is an island country and city-state in Southeast Asia. The country's territory comprises one main island, 63 satellite islands and islets, and one outlying islet. It is about one degree ...
, start =
Choa Chu Kang Choa Chu Kang (), alternatively spelled Chua Chu Kang and often abbreviated as CCK, is a planning area and residential town located at the northwestern point of the West Region of Singapore. The town shares borders with Sungei Kadut to the ...
, end =
Choa Chu Kang Choa Chu Kang (), alternatively spelled Chua Chu Kang and often abbreviated as CCK, is a planning area and residential town located at the northwestern point of the West Region of Singapore. The town shares borders with Sungei Kadut to the ...
, stations = 13 , routes = 2 , daily_ridership = 64,781 (July 2020) , open = , owner =
Land Transport Authority The Land Transport Authority (LTA) is a Statutory boards of the Singapore Government, statutory board under the Ministry of Transport (Singapore), Ministry of Transport of the Government of Singapore. History Incorporation The Land Transport Au ...
, operator = SMRT Trains Ltd ( SMRT Corporation) , character = Fully elevated , depot = Ten Mile Junction , stock = Bombardier Innovia APM 100 (C801)
Bombardier Innovia APM 100 (C801A)
Bombardier Innovia APM 300R (C801B) , linelength = , tracklength = , gauge = central guideway with rubber tyres , electrification = 600 V 50 Hz 3-phase AC
third rail A third rail, also known as a live rail, electric rail or conductor rail, is a method of providing electric power to a railway locomotive or train, through a semi-continuous rigid conductor placed alongside or between the rails of a track (r ...
, speed = , signalling = Current: Bombardier CITYFLO 550 fixed block ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI
Future: Alstom Cityflo 650 moving block CBTC ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI , map = , map_state = collapsed The Bukit Panjang LRT (
abbreviation An abbreviation () is a shortened form of a word or phrase, by any method including shortening (linguistics), shortening, contraction (grammar), contraction, initialism (which includes acronym), or crasis. An abbreviation may be a shortened for ...
: BPLRT) is an
automated guideway transit An automated guideway transit (AGT) or automated fixed-guideway transit or automatic guideway transit system is a type of fixed guideway transit infrastructure with a riding or suspension track that supports and physically guides one or more dri ...
line in
Bukit Panjang Bukit Panjang ( ) is a Planning Areas of Singapore, planning area and New towns of Singapore, residential town located in the West Region, Singapore, West Region of Singapore. A portion of this town is situated on a low-lying elongated hill. T ...
, Singapore. The BPLRT is currently the only
Light Rail Transit Light rail (or light rail transit, abbreviated to LRT) is a form of passenger urban rail transit that uses rolling stock derived from tram technology National Conference of the Transportation Research Board while also having some features from ...
(LRT) line operated by SMRT Trains. As the name suggests, it serves 13 stations in the neighbourhood of
Bukit Panjang Bukit Panjang ( ) is a Planning Areas of Singapore, planning area and New towns of Singapore, residential town located in the West Region, Singapore, West Region of Singapore. A portion of this town is situated on a low-lying elongated hill. T ...
and parts of
Choa Chu Kang Choa Chu Kang (), alternatively spelled Chua Chu Kang and often abbreviated as CCK, is a planning area and residential town located at the northwestern point of the West Region of Singapore. The town shares borders with Sungei Kadut to the ...
in the north-west area of the country. The line was the first LRT line constructed in Singapore, having been opened on 6 November 1999 by then-
Deputy Prime Minister A deputy prime minister or vice prime minister is, in some countries, a Minister (government), government minister who can take the position of acting prime minister when the prime minister is temporarily absent. The position is often likened to th ...
Tony Tan Tony Tan Keng Yam (; born 7 February 1940) is a Singaporean banker and politician who served as the seventh president of Singapore between 2011 and 2017. Prior to entering politics, Tan was a general manager at OCBC Bank. He made his polit ...
. It is a fully elevated and automated
people mover A people mover or automated people mover (APM) is a type of small-scale automated guideway transit system. The term is generally used only to describe systems serving relatively small areas such as airports, downtown districts or theme parks ...
system. The line currently uses the Innovia APM 100 C801, C801A and C801B rolling stock supplied by Bombardier, running in a two-car formation. With a 20-year design lifespan, a major overhaul of the system began in 2019 that is scheduled to complete in 2026, which include a new signalling system (Innovia APM 300R) and power rails system, as well as rolling stock.


History


Planning and construction

In November 1994, then- Communication Minister Mah Bow Tan announced that the Mass Rapid Transit Corporation (MRTC) was conducting studies on the feasibility of a Light Rail Transit (LRT) system in the estate of Bukit Panjang. Subsequently, Bukit Panjang was one of the two locations selected for the construction of the first LRT systems in Singapore in December 1994, the other being at Queenstown and linked to
Buona Vista MRT station Buona Vista MRT station is a Mass Rapid Transit (Singapore), Mass Rapid Transit (MRT) interchange station on the East West MRT line, East West line and Circle MRT line, Circle line in Queenstown, Singapore, Queenstown, Singapore. This station i ...
, the latter of which was eventually not built. The tender for the design and construction of the LRT system in Bukit Panjang were called in December 1994, receiving eight bids. In February 1996, then-Prime Minister
Goh Chok Tong Goh Chok Tong (born 20 May 1941) is a Singaporean former politician who served as the second prime minister of Singapore from 1990 to 2004 and as a senior minister of Singapore from 2004 to 2011. He served as the secretary-general of the Peo ...
announced that an LRT system in Bukit Panjang had been given the go-ahead, and was expected to be completed in three years. An exhibition about the system was organised by the
Land Transport Authority The Land Transport Authority (LTA) is a Statutory boards of the Singapore Government, statutory board under the Ministry of Transport (Singapore), Ministry of Transport of the Government of Singapore. History Incorporation The Land Transport Au ...
(LTA) in April 1996, featuring models and maps of the stations on the line, and a booth at which visitors could vote for the colours of the rolling stock, and the shape of the station roofs. In the same month, the contract for the system's design and construction was awarded to a consortium consisting of Keppel Corporation, Gammon, and
Adtranz Adtranz was a multi-national rail transportation equipment manufacturer with facilities concentrated in Europe and the US. The company, legally known as ABB Daimler-Benz Transportation, was created in 1996 as a joint venture between ABB and Daim ...
for . On 5 August 1997, the LTA awarded SMRT a license to operate the LRT due to its experience with the MRT system. Testing on the line was underway by December 1998 and it commenced operations on 6 November 1999.


Reliability issues

Upon opening, the system suffered from reliability issues, having 32 service disruptions in its first six months of operation. Safety concerns regarding the system were also raised in
Parliament In modern politics and history, a parliament is a legislative body of government. Generally, a modern parliament has three functions: Representation (politics), representing the Election#Suffrage, electorate, making laws, and overseeing ...
in the wake of a collision between two trains in November 2000 that injured five passengers. Most of these issues were rectified by September 2001, and, by May 2002, the system was able to attain the government's desired service levels. However, a subsequent five-day service disruption in October 2002, caused by a loose guide wheel, led the LTA to conduct an audit on the maintenance procedures carried out for the line. The audit found that the training and procedures for maintenance were adequate, but the actual maintenance work was not properly done, and the LTA gave the line's operator, Singapore LRT, six months to rectify the lapses found in the audit. To rectify the issues with the system, Singapore LRT spent to replace worn-out wires in the line's signalling system, from December 2003 to April 2004. Service levels on the line had improved to adequate standards by 2003, but a subsequent disruption of service in May 2004 led to the line's operator initiating an internal probe into the matter. Besides the reliability issues, the line was doing poorly financially, with Singapore LRT making annual losses of around to . Ridership on the line was also low, with around 40,000 commuters daily, 10,000 less than needed to break even, and was not expected to increase further, given a development slowdown in Bukit Panjang.


Upgrades and capacity increases

By 2010, ridership on the line had increased significantly, to around 47,000 commuters daily, and was expected to increase further. As the trains on the line had limited capacity to meet the demand, in November 2010, SMRT announced that they were contemplating capacity increases on the line. These capacity increases, in the form of 13 additional train cars, and a supplementary bus service between heavily used stations on the line and Choa Chu Kang, were announced by then-Transport Minister
Lui Tuck Yew Lui Tuck Yew (; born 16 August 1961) is a Singaporean diplomat, former politician and two-star rear-admiral who has been serving as List of ambassadors of Singapore to the United States, Singapore Ambassador to the United States since 2023. Pri ...
in July 2011. In addition, SMRT contracted Bombardier to conduct a study on how to improve the line's reliability. The new trains entered service on the line in 2015. In a bid to further improve reliability, in June 2015, the LTA and SMRT announced upgrades to the track, signalling systems, and electrical systems along the line, as faults in these areas had caused most of the service disruptions on the line. Later that month, Lui elaborated that the upgrades would comprise a 12-month study period to identify issues to rectify, and a several years long period in which the upgrades would be implemented. Additional staff were also deployed to improve service recovery and platform barriers were installed at all stations along the line by 2017. In October 2016, as the line was approaching its 20-year design lifespan, LTA and SMRT announced that they were considering several courses of action regarding the system. These comprised the renewal of the existing system, or its complete replacement, either with a new system or with buses. On 8 March 2017, it was announced that the system's power supply, signalling, rolling stock, track, and stations along with a new signalling system would be upgraded. The authorities ruled out scrapping the entire system or changing to automated guided vehicles drawn on self-power as it would cause major traffic congestion. On 3 October 2017, a tender for the revamp was called. To improve service reliability in the interim period, SMRT shortened operating hours on all Sundays from 12 November 2017 until the end of that year, which SMRT said allowed for additional time for maintenance. On 7 March 2018, LTA awarded the contract for $344 million to Bombardier, the original supplier of the rolling stock, to fully upgrade the system. This includes overhauling the line's signalling system with a
communications-based train control Communications-based train control (CBTC) is a railway signaling system that uses telecommunications between the train and track equipment for traffic management and infrastructure control. CBTC allows a train's position to be known more accura ...
(CBTC) system for a tighter headway between each train and thus, reducing waiting time. The 19 first-generation trains will be removed from service and replaced while the 13 second-generation trains will be refurbished. These upgrades are slated to be completed by 2026.


Network and operations


Route

Covering a distance of , the fully elevated line has 13 stations, and connects Bukit Panjang with Choa Chu Kang MRT/LRT station. From Choa Chu Kang station, the line runs east along Choa Chu Kang Way and Choa Chu Kang Road, before making a loop around Bukit Panjang.


Services

There are two services currently operating on the line: A and B, both of which terminate at
Choa Chu Kang Choa Chu Kang (), alternatively spelled Chua Chu Kang and often abbreviated as CCK, is a planning area and residential town located at the northwestern point of the West Region of Singapore. The town shares borders with Sungei Kadut to the ...
. Since 30 December 2024, Service A resumed full day operation on the weekdays.


Stations

All stations, except
Choa Chu Kang Choa Chu Kang (), alternatively spelled Chua Chu Kang and often abbreviated as CCK, is a planning area and residential town located at the northwestern point of the West Region of Singapore. The town shares borders with Sungei Kadut to the ...
, have two facing side platforms. Choa Chu Kang uses a
Spanish solution In railway and rapid transit parlance, the Spanish solution is a station layout with two railway platforms, one on each side of the track, which allows for separate platforms for boarding and alighting. The "Spanish solution" is used in several ...
, unique amongst Singapore MRT stations. All the stations on the LRT have half-height platform barriers, installed between 2016 and 2017. These platform barriers have fixed openings instead of platform doors, which the LTA attributed to insufficient space on the station platforms to install the equipment needed for platform doors. Choa Chu Kang station also has two additional platforms and a new set of fare gates to ease crowding during peak hours. The stations on the line sport a conventional barrel-roof design, which was chosen by the Bukit Panjang residents when the BPLRT was being constructed.


List


Rolling stock

The Bukit Panjang LRT operates on the Bombardier Innovia APM 100 rolling stock, similar to the ones used by the Changi Airport Skytrain until 2006. An initial 19 trainsets were delivered in 1999 under C801, which bear a cerulean livery. An additional 13 trainsets were delivered in 2014 under C801A, bearing SMRT's pixel livery and a slightly different exterior design. Each unit is long. These trains, also known as automated people movers, are rubber-tyred for minimised operating noise within built-up areas and guided by a central guideway which also contains a power rail. They operate in both single-car and double-car arrangements, paired with a similar model (C801 and C801A trainsets are not cross-coupled). The trains are also equipped with windows that fog up automatically when the train runs near residential buildings. 19 Bombardier Innovia APM 300R trains have been procured under C801B as part of the Bukit Panjang LRT overhaul. These trains will be equipped with Communications Based Train Control (CBTC) signalling system and will replace the first generation C801 trains.


Train formation

Between 1999 and 2015, the trains operated in one-car (M) formations throughout the day. Two-car formations were only operated during weekday peak hours to accommodate increased demand prior to the introduction of C801A trains in 2014. Service B used to operate 2-car sets only during weekday morning peak hours, while Service A mostly operated them during weekday evening peak hours. From 2015 until 2019, the majority of trains operated in two-car (M-M) formations. Two-car formations were no longer limited to peak hours due to the increase in ridership and number of apartments in Bukit Panjang. Since 2019, all of the trains are running in two-car (M-M) formations throughout the day. The units are limited to a two-car train formation because of station length. Coupling is usually done in Ten Mile Junction Depot and the trains are coupled with the same car type: C801 + C801 or C801A (non-CBTC) + C801A (non-CBTC) or C801A (CBTC) + C801A (CBTC) or C801B + C801B. Occasionally units are mixed for reasons such as rescue operations or testing.


Train control

The line is equipped with Bombardier's CITYFLO 550 fixed block signalling system for
automatic train control Automatic train control (ATC) is a general class of train protection systems for railways that involves a speed control mechanism in response to external inputs. For example, a system could effect an emergency brake application if the driver do ...
(ATC) under
automatic train operation Automatic train operation (ATO) is a method of operating trains automatically where the driver is not required or is required for supervision at most. Alternatively, ATO can be defined as a subsystem within the automatic train control, which pe ...
(ATO) GoA 4 (UTO). The subsystems consist of
automatic train protection Automatic train protection (ATP) is the generic term for train protection systems that continually check that the speed of a train is compatible with the permitted speed allowed by signalling, including automatic stop at certain signal aspects ...
(ATP) to govern train speed, Automatic Train Supervision (ATS) to track and schedule trains, and a
computer-based interlocking Computer-based interlocking is railway signal interlocking implemented with computers, rather than using older technologies such as relays or mechanics Mechanics () is the area of physics concerned with the relationships between force, matt ...
(CBI) system that prevents incorrect signal and track points settings. When the Bombardier Innovia APM 300R C801B enter service, the line will be upgraded to use Alstom’s Cityflo 650 moving block
communications-based train control Communications-based train control (CBTC) is a railway signaling system that uses telecommunications between the train and track equipment for traffic management and infrastructure control. CBTC allows a train's position to be known more accura ...
(CBTC) signalling system.


References


External links


Bukit Panjang LRT line
{{DEFAULTSORT:Bukit Panjang LRT line 1999 establishments in Singapore Bukit Panjang Choa Chu Kang Innovia people movers Light Rail Transit (Singapore) lines Railway lines opened in 1999 Automated guideway transit