HOME

TheInfoList



OR:

The Baltimore and Potomac Tunnel (or B&P Tunnel) is a
double-tracked Double tracking or doubling is an audio recording technique in which a performer sings or plays along with their own prerecorded performance, usually to produce a stronger or bigger sound than can be obtained with a single voice or instrument. ...
, masonry
arch An arch is a curved vertical structure spanning an open space underneath it. Arches may support the load above them, or they may perform a purely decorative role. As a decorative element, the arch dates back to the 4th millennium BC, but stru ...
railroad
tunnel A tunnel is an underground or undersea passageway. It is dug through surrounding soil, earth or rock, or laid under water, and is usually completely enclosed except for the two portals common at each end, though there may be access and ve ...
on the
Northeast Corridor The Northeast Corridor (NEC) is an electrified railroad line in the Northeast megalopolis of the United States. Owned primarily by Amtrak, it runs from Boston in the north to Washington, D.C., in the south, with major stops in Providence, Rhod ...
in
Baltimore Baltimore is the most populous city in the U.S. state of Maryland. With a population of 585,708 at the 2020 census and estimated at 568,271 in 2024, it is the 30th-most populous U.S. city. The Baltimore metropolitan area is the 20th-large ...
, Maryland, just west of Pennsylvania Station (Baltimore). Opened in 1873, the tunnel is the oldest tunnel operated by
Amtrak The National Railroad Passenger Corporation, Trade name, doing business as Amtrak (; ), is the national Passenger train, passenger railroad company of the United States. It operates intercity rail service in 46 of the 48 contiguous United Stat ...
. In 2008, the tunnel was used by about 140
Amtrak The National Railroad Passenger Corporation, Trade name, doing business as Amtrak (; ), is the national Passenger train, passenger railroad company of the United States. It operates intercity rail service in 46 of the 48 contiguous United Stat ...
and MARC passenger trains and two freight trains every day. The tunnel, which passes under the Baltimore neighborhoods of Bolton Hill, Madison Park, and Upton, is a single tube with two tracks. It is punctuated by two open-air cuts for ventilation of exhaust fumes and smoke—Pennsylvania Avenue Opening and John Street Opening—that divide the main tunnel into three "sub-tunnels", designated (from south to north) Gilmor Street Tunnel, Wilson Street Tunnel, and John Street Tunnel.


History and operations

Constructed by the
Baltimore and Potomac Railroad The Baltimore and Potomac Railroad (B&P) operated from Baltimore, Maryland, southwest to Washington, D.C., from 1872 to 1902. Owned and operated by the Pennsylvania Railroad, it was the second railroad company to connect the nation's capital to ...
under Winchester Street and Wilson Street in
Baltimore Baltimore is the most populous city in the U.S. state of Maryland. With a population of 585,708 at the 2020 census and estimated at 568,271 in 2024, it is the 30th-most populous U.S. city. The Baltimore metropolitan area is the 20th-large ...
, the tunnel opened on June 29, 1873. The construction of the tunnel required 13 million bricks and the waste dirt was used to shore up several areas of the city allowing for the construction of more homes and buildings. The B&P tunnel allowed the
Pennsylvania Railroad The Pennsylvania Railroad ( reporting mark PRR), legal name as the Pennsylvania Railroad Company, also known as the "Pennsy," was an American Class I railroad that was established in 1846 and headquartered in Philadelphia, Pennsylvania. At its ...
(PRR) direct access to
Washington, D.C. Washington, D.C., formally the District of Columbia and commonly known as Washington or D.C., is the capital city and federal district of the United States. The city is on the Potomac River, across from Virginia, and shares land borders with ...
, for the first time by connecting its
Northern Central Railway The Northern Central Railway (NCRY) was a Class I Railroad in the United States connecting Baltimore, Maryland, with Sunbury, Pennsylvania, along the Susquehanna River. Completed in 1858, the line came under the control of the Pennsylvania R ...
affiliate, which arrived in Baltimore from the north, to the Baltimore and Potomac's new spur, which ran to Washington, D.C. Between 1916 and 1917, the PRR expanded the tunnel to accommodate larger trains. The railroad lowered the tunnel floor about , underpinned the side walls, installed a concrete invert slab, and rebuilt the track structure. The bases of the tunnel walls were chipped away to improve horizontal clearance. Before the PRR electrified its
New York City New York, often called New York City (NYC), is the most populous city in the United States, located at the southern tip of New York State on one of the world's largest natural harbors. The city comprises five boroughs, each coextensive w ...
–Washington main line in 1935, the poorly ventilated tunnel filled with smoke from steam locomotives. The smoke also was a nuisance to the residential neighborhoods above the tunnel. In preparation for the electrified operation, the tunnel was lined with gunite to waterproof the arch and prevent icicles from shorting out the catenary wires. Financial considerations prevented the PRR from constructing a new passenger tunnel on the Presstman Street alignment, for which it previously had acquired rights. The PRR's plan had envisioned using the new Presstman Street tunnel and the original bores of the Union Tunnel for passenger operations, while the old B&P Tunnel and the newer bores of the Union Tunnel (completed in the 1930s) would have been used for freight operations. In the late 1950s, the tunnel became a hindrance to the growth of PRR's Trailer-on-Train service, which required additional vertical and horizontal clearance to accommodate
semi-trailer A semi-trailer is a trailer (vehicle), trailer without a front axle. The combination of a semi-trailer and a tractor truck is called a ''semi-trailer truck'' (also known simply as a "semi-trailer", "tractor trailer", or "semi" in the United Sta ...
s on top of railroad
flatcar A flatcar (US) (also flat car, or flatbed) is a piece of rolling stock that consists of an open, flat deck mounted on trucks (US) or bogies (UK) at each end. Occasionally, flat cars designed to carry extra heavy or extra large loads are mounted ...
s. The curve at Pennsylvania Avenue was the biggest constraint. The PRR modified the tunnel walls and ceiling for a distance of to improve clearance and enable high cars and piggyback trailers to traverse the tunnel without damaging their roofs. Additionally, a
gauntlet track Gauntlet track or interlaced track, also gantlet track () is an arrangement in which Rail tracks, railway tracks run parallel on a single track bed and are interlaced (i.e., overlapped) in such a way that only one pair of rails can be used at any ...
was installed on southbound Track 3 to shift trains closer to the middle of the tunnel. However, the gauntlet track effectively created a single-track tunnel: trains could not use Track 2 while a train was using the gauntlet track, and if a train using the gauntlet track became disabled, the tunnel would be shut down until the disabled train was moved. In addition, even with the gauntlet track, the tunnel could not accommodate cars that were taller than or exceeded the Plate C
loading gauge A loading gauge is a diagram or physical structure that defines the maximum height and width dimensions in railway vehicles and their loads. Their purpose is to ensure that rail vehicles can pass safely through tunnels and under bridges, and k ...
. In the early 1980s, the tunnel underwent rehabilitation as part of the Northeast Corridor Improvement Project. The repairs included replacing the existing invert, repairing the tunnel lining, upgrading the track structure, installing a new gauntlet track, and rehabilitating the tunnel drainage system. No fundamental change was made in the tunnel's difficult geometry. Eventually, the gauntlet track was removed, due to freight traffic largely shifting to the ex-Baltimore and Ohio route through the Howard Street Tunnel.


Problems

The tunnel has long been one of the worst
bottleneck Bottleneck may refer to: * the narrowed portion (neck) of a bottle Science and technology * Bottleneck (engineering), where the performance of an entire system is limited by a single component * Bottleneck (network), in a communication network * ...
s for rail traffic along the Northeast Corridor and its maintenance is costly: * A sharp curve at the south portal of the tunnel limits southbound trains to U.S. Federal Railroad Administration. Washington, DC
"Report To Congress: Baltimore's Railroad Network, Challenges and Alternatives."
November 2005. p. 2.16.
* The spacing between tracks is tight * There are water infiltration and drainage issues * A mile-long, 1.34 percent grade—the steepest grade on the NEC between Philadelphia and Washington—further constrains train performance Collectively, the tunnel's height, speed, and capacity limitations threaten the ability for the
Port of Baltimore The Helen Delich Bentley Port of Baltimore is a Port, shipping port along the tidal basins of the three branches of the Patapsco River in Baltimore, Baltimore, Maryland, on the upper northwest shore of the Chesapeake Bay. It is the nation's la ...
to be competitive with increased shipping volumes.


Plans for improvements

In June 2008, the
U.S. House of Representatives The United States House of Representatives is a chamber of the bicameral United States Congress; it is the lower house, with the U.S. Senate being the upper house. Together, the House and Senate have the authority under Article One of th ...
voted to support a study of the environmental impacts of different possible replacement tunnels. On January 28, 2010, $60 million in funding was awarded under the
American Recovery and Reinvestment Act The American Recovery and Reinvestment Act of 2009 (ARRA) (), nicknamed the Recovery Act, was a stimulus package enacted by the 111th U.S. Congress and signed into law by President Barack Obama in February 2009. Developed in response to the G ...
to conduct the study, but not the money that would be required for a replacement tunnel. Estimates in 2013 put the cost around $1.5 billion. An outgrowth of the ARRA funds, the B&P Tunnel Project was an environmental and engineering study by the FRA, MDOT, and Amtrak to evaluate potential improvements to the tunnel. The study held multiple open houses in 2014–2015 to share information and solicit public input.


Preliminary alternatives

In December 2014, the study published the ''Preliminary Alternatives Screening Report'', in which four alternatives from 16 were selected to be carried forward for further consideration and study: * Alternative 1, No Build: do nothing * Alternative 2, Rebuild/Rehabilitate: improve the existing tunnel to either eliminate the need for a new tunnel or complement a new tunnel * Alternative 3, Great Circle Passenger Tunnel: construct a new tunnel on a wide, continuous arc to the north of the existing tunnel, bypassing it entirely * Alternative 11, Robert Street South: construct a new tunnel roughly parallel to and within 2–4 blocks of the existing tunnel Among the criteria used to evaluate the alternatives was the ability to accommodate double-stack container cars. The 12 eliminated alternatives included several that varied greatly from the existing alignment and bypassed Pennsylvania Station entirely (including one using the former I-170 right of way), as well as several that reused one or more of the three existing tunnel sections.


Selected alternative

In November 2016, Alternative 3B (Great Circle) was chosen as the preferred alternative in the ''Final Environmental Impact Statement'' (FEIS) over Alternative 1 (No Build) and two other variations of the Great Circle Alternative (Alternatives 3A and 3C). Highlights of Alternative 3B are: * A design that permits a maximum speed of over , up from for the existing tunnel. * A total cost (including engineering, design, and construction) of $4.52 billion. * A total project length of , including a tunnel with four single-track tubes. * Three diesel exhaust ventilation facilities. * Approximately 2:30 in travel time savings for Amtrak trains and 1:50 for MARC trains, compared to the existing tunnel. * Reconstruction of the West Baltimore MARC Station with high-level platforms. * Displacement of 22 residences and six businesses. The Federal Railroad Administration released its Record of Decision on the new tunnel, the final step in the
NEPA The National Environmental Policy Act (NEPA) is a United States environmental law designed to promote the enhancement of the environment. It created new laws requiring List of federal agencies in the United States, U.S. federal government agenc ...
process, in March 2017.


Final plan

In June 2021, Amtrak and Maryland announced that they would be moving forward with design and construction of the new tunnel, albeit with several significant changes from the previously announced plan (Alternative 3B): * The number of single-track tubes is reduced from four to two; the third and fourth single-track tubes could be constructed in the future if funding becomes available. * The design is revised to only accommodate electric trains, requiring the MARC
Penn Line The Penn Line is a MARC passenger rail service operating between Union Station in Washington, D.C., and Perryville, Maryland, along the far southern leg of the Northeast Corridor; most trains terminate at Baltimore's Penn Station. It is MA ...
to be converted from a mix of diesel and electric locomotives to all-electric power. * The project is revised to remove the ability to accommodate double-stack freight trains in the new tunnel and instead maintains the B&P Tunnel for use by diesel powered freight trains. The changes were made to reduce the project's cost by $1 billion and to address concerns about diesel exhaust fumes from communities near the ventilation facilities. The changes did not trigger the need for a new Environmental Impact Statement.


Replacement tunnel

The new tunnel, which will be named for
Frederick Douglass Frederick Douglass (born Frederick Augustus Washington Bailey, February 14, 1818 – February 20, 1895) was an American social reformer, Abolitionism in the United States, abolitionist, orator, writer, and statesman. He was the most impor ...
, is scheduled to open in 2035. Amtrak started the process to procure construction services in June 2022. On January 30, 2023, President
Joe Biden Joseph Robinette Biden Jr. (born November 20, 1942) is an American politician who was the 46th president of the United States from 2021 to 2025. A member of the Democratic Party (United States), Democratic Party, he served as the 47th vice p ...
visited the tunnel to kick off the project and promote the $1 trillion
Infrastructure Investment and Jobs Act The Infrastructure Investment and Jobs Act (IIJA), also known as the Bipartisan Infrastructure Law (BIL),H.R. 3684 is a United States federal statute enacted by the 117th United States Congress and signed into law by President Joe Biden on Nov ...
(IIJA). Biden, who had taken "a thousand trips" through the tunnel on Amtrak between Wilmington and Washington during his time as Senator from Delaware, remarked that "you wonder how in the hell he B&P Tunnelis still standing". Amtrak was awarded $4.7 billion in
Infrastructure Investment and Jobs Act The Infrastructure Investment and Jobs Act (IIJA), also known as the Bipartisan Infrastructure Law (BIL),H.R. 3684 is a United States federal statute enacted by the 117th United States Congress and signed into law by President Joe Biden on Nov ...
funds in November 2023. Amtrak and Maryland MTA will contribute an additional $1.2 billion. Amtrak awarded a construction contract in February 2024 and demolition of several buildings began later that month.


See also

* Pennsylvania Station (Baltimore) * Union Tunnel (Baltimore) * Howard Street Tunnel, another rail tunnel under Baltimore that's part of the former
Baltimore Belt Line The Baltimore Belt Line was constructed in Baltimore, Maryland, by the Baltimore and Ohio Railroad (B&O) in the early 1890s to connect the railroad to its new line to Philadelphia and Jersey City (the terminal serving New York City). It include ...
.


References


External links

* U.S. Federal Railroad Administration. ''Report To Congress: Baltimore's Railroad Network, Challenges and Alternatives.'' November 2005. *
Executive Summary
*
"Part 1: Challenges."
Discussing the history and recent state of Baltimore rail infrastructure. *
"Part 2: Alternatives."
Discussing possible replacement tunnel alignments along Presstman Street (see page 7-7) or US Route 40, among others (see page 7–9).
B&P Tunnel Project
{{DEFAULTSORT:Baltimore And Potomac Tunnel Amtrak tunnels Pennsylvania Railroad tunnels Railroad tunnels in Maryland Tunnels in Baltimore Tunnels completed in 1873 1873 establishments in Maryland