In the 21st century, a series of investments were made to improve and extend the line. This began in May 2003 when the South Australian Government announced an upgrade of the Glenelg line infrastructure and the introduction of new trams.
Major work to upgrade the line took place between 5 June and 7 August 2005.
Concrete sleeper
A concrete sleeper (British English) or concrete tie (American English) is a type of railway sleeper or railroad tie made out of steel reinforced concrete.
History
In 1877, Joseph Monier, a French gardener, suggested that concrete reinforced ...
s were installed and much of the track renewed in an intensive nine-week project. Most of the 21 tram stops were reconstructed with higher platforms to allow level access to the new low-floor trams. The overhead electrical supply was upgraded and some minor modifications were made to the H type trams and Glengowrie depot. Tram services were replaced with substitute bus services during this period. Services resumed on 8 August 2005. The terminus at Moseley Square was reconfigured in September 2005 as part of a general redevelopment of the square.
Extension to City West

The South Australian Government announced a 1.2 kilometre extension from
Victoria Square along
King William Street to
Adelaide railway station
Adelaide Railway Station is the central terminus of the Adelaide Metro railway system. All lines approach the station from the west, and it is a terminal station with no through lines, with most of the traffic on the metropolitan network eith ...
and the western city campus of the
University of South Australia
The University of South Australia (UniSA) is a public research university in the Australian state of South Australia. It is a founding member of the Australian Technology Network of universities, and is the largest university in South Austral ...
in April 2005. An additional two
Bombardier Flexity Classic
The Bombardier Flexity Classic is a model of light-rail tram manufactured by Bombardier Transportation. Although it is marketed as the most traditionally designed member of the Flexity family, it is still a modern bi-directional articulated t ...
trams were ordered to cater for services on the city centre extension.
Construction work on the extension commenced in early 2007. A new Victoria Square stop opened on 6 August 2007. The stop moved from the centre of the square to the western side. Testing of the extension began in September 2007.
The extension opened on 14 October 2007. Initially, a shuttle service running between Victoria Square and City West tram stop was provided. Normal services continued to run between Victoria Square and Glenelg. A new timetable began on 15 October 2007 with through services from Glenelg to City West and a free shuttle service between South Terrace and City West.
South Road overpass
An overpass crossing
South Road
South Road and its southern section as Main South Road outside of Adelaide is a major north–south conduit connecting Adelaide and the Fleurieu Peninsula, in South Australia. It is one of Adelaide's most important arterial and bypass roads. As S ...
was announced in the 2007 South Australian Budget. The project was built in conjunction with the
Anzac Highway
Anzac Highway is an main arterial road heading southwest from the city of Adelaide, the capital of South Australia, to the beachside suburb of Glenelg.
Originally named the Bay Road (which remains an informal synonym), it mostly follows the t ...
Underpass. Construction by
McConnell Dowell
McConnell Dowell is a major infrastructure construction company founded in New Zealand in 1961. In 2003 it became a wholly owned subsidiary of Aveng, which is listed on the Johannesburg Stock Exchange in South Africa.
History
McConnell Dowell was ...
commenced in July 2009. On 8 December 2009, the overpass opened to allow trams to pass over it, however the South Road tram stop was not operational until 15 March 2010.
Extension to Adelaide Entertainment Centre

A$100 million extension to the
Adelaide Entertainment Centre
The Adelaide Entertainment Centre (AEC) is an indoor arena located in the South Australian capital of Adelaide. It is used for sporting and entertainment events. It is the principal venue for concerts, events and attractions for audiences be ...
was announced in the 2008 South Australian Budget. Planning commenced soon after and the state cabinet approved the extension in November 2008.
Construction work began on 11 May 2009.
Testing began in February 2010 and the extension opened on 22 March 2010.
Extension to East End
After a lobbying campaign from businesses and institutions located in the area, a $50 million project to construct a one-kilometre branch along the eastern section of North Terrace was announced in the 2016 South Australian Budget. The extension enabled the creation of shuttle service between the old
Royal Adelaide Hospital
The Royal Adelaide Hospital (RAH), colloquially known by its initials or pronounced as "the Rah", is South Australia's largest hospital, owned by the state government as part of Australia's public health care system. The RAH provides tertiary h ...
and the Adelaide Entertainment Centre. Services operate every ten minutes. An expansion of the project was also announced in December 2016. This saw a 100-metre northern spur line constructed from North Terrace on King William Road. The intention was to avoid modifying the North Terrace-King William Road intersection twice - once for the East End extension, then again if future northernbound expansion goes ahead - by combining all the work into a single program. Three new trams were ordered. The changes resulted in an extra $20 million being added to the budget for the project.
The eastern branch includes three new stops on North Terrace to service the
South Australian Museum
The South Australian Museum is a natural history museum and research institution in Adelaide, South Australia, founded in 1856 and owned by the Government of South Australia. It occupies a complex of buildings on North Terrace in the cu ...
,
University of Adelaide
The University of Adelaide (informally Adelaide University) is a public research university located in Adelaide, South Australia. Established in 1874, it is the third-oldest university in Australia. The university's main campus is located on ...
and
Ayers House, while the northern branch will include a single stop on King William Road to service
Elder Park
Elder Park is a public open space in the city of Adelaide, South Australia on the southern bank of the River Torrens and that is bordered by the Adelaide Festival Centre and North Terrace.
The park is named after the Elder family who w ...
and the Riverbank precinct.
A tender to design and construct the project was called in December 2016. Preliminary works commenced in July 2017, with major works commencing in October, and are expected to be completed by early 2018. In August 2017, it was revealed that the planned rail junction at the North Terrace-King William Road intersection would be altered, disallowing trams to turn left onto King William Road from North Terrace. Further controversy arose in late 2017 when it was revealed that trams would also not be able to turn right onto North Terrace from King William Street, disallowing future services from Glenelg to continue directly to East End and beyond.
Originally expected to be completed in early 2018, electrical faults pushed the opening date back to July 2018, while signalling faults uncovered during testing weeks before the scheduled opening date of 29 July further delayed the project. In addition, the company responsible for construction entered voluntary administration in August 2018.
The extension was opened on 13 October 2018, with services running Glenelg to Royal Adelaide Hospital, with limited peak services continuing to Entertainment Centre, and Entertainment Centre to Botanic Gardens. A route running from Glenelg to Festival Plaza runs only on weekends and Adelaide Oval event days.
Routes
On 13 October 2018, following the opening of the Botanic Gardens and Festival Plaza extensions, the network timetable was restructured and new routes opened to service the new stations. The primary route from Glenelg was curtailed to terminate at the Royal Adelaide Hospital, and two additional routes were introduced to leave three routes in total:
* Glenelg to Royal Adelaide Hospital: typical 5-minute frequency, select peak services continue to Entertainment Centre
* Glenelg to Festival Plaza: operates only on weekends and Adelaide Oval event days
* Entertainment Centre to Botanic Gardens: typical 10-minute frequency
Controversy
Due to the increased popularity of the service beyond the city after the City West extension, the trams service dramatically exceeded its capacity, with over 100,000 extra trips for the three months from November 2007, compared the same period the previous year. This resulted in intensive overcrowding on board the trams, and many passengers were unable to board trams during peak hours. The extension of the tramway along King William Street and North Terrace was blamed by critics for increased congestion within the centre of Adelaide, but no actual evidence of this occurring was identified.
There have been a small number of minor derailments along the tramway, including one on Melbourne Cup Day, 6 November 2007. On several occasions, some Flexity trams experienced breakdown problems.
References
External links
Glenelg tram (Adelaide Metro)Bill's Glenelg tram pages
{{TramsAustralia
Transport in Adelaide
Light rail in Australia
Tram transport in South Australia
5 ft 3 in gauge railways in Australia
Standard gauge railways in Australia
1873 establishments in Australia