Yellow Line (Kolkata Metro)
   HOME



picture info

Yellow Line (Kolkata Metro)
Yellow Line is a rapid transit metro line of the Kolkata Metro currently under construction in Kolkata, West Bengal, India. It will be a with 10 stations. long line from Noapara, West Bengal, Noapara to Barasat in North 24 Parganas. It is being built by Rail Vikas Nigam, RVNL, Senbo & Italian-Thai Development, ITD. It will run mostly on underground tunnels, the track will be elevated until Jessore Road metro station, Jessore Road from Noapara metro station and depot, Noapara and then go underground towards Barasat metro station. It will have an interchange at the Netaji Subhas Chandra Bose International Airport, Kolkata Airport with Orange Line (Kolkata Metro), Orange Line. Stations The stations of this corridor are: Progress of Dum Dum Cantonment metro station An amount of Rs 227 crore contract to build this station along with a mostly at-grade section from the Bagjola Canal to the existing ramp of the Airport Circular Railway track was awarded to Senbo Engineering Limite ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

Kolkata Metro Yellow Line
Yellow Line is a rapid transit metro line of the Kolkata Metro currently under construction in Kolkata, West Bengal, India. It will be a with 10 stations. long line from Noapara to Barasat in North 24 Parganas. It is being built by RVNL, Senbo & ITD. It will run mostly on underground tunnels, the track will be elevated until Jessore Road from Noapara and then go underground towards Barasat metro station. It will have an interchange at the Kolkata Airport Netaji Subhas Chandra Bose International Airport () is an international airport serving the city of Kolkata and the Kolkata metropolitan area, the capital metropolis of the Indian state of West Bengal. It is the primary aviation hub for eas ... with Orange Line (Kolkata Metro), Orange Line. Stations The stations of this corridor are: Progress of Dum Dum Cantonment metro station An amount of Rs 227 crore contract to build this station along with a mostly at-grade section from the Bagjola Canal to the existing ra ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  



MORE