Kent Station (OC Transpo)
   HOME



picture info

Kent Station (OC Transpo)
Lyon station is an underground light rail station on Line 1 (O-Train), Line 1 of the O-Train in Ottawa located in the western portion of Ottawa's downtown, specifically at Lyon Street and Queen Street, the latter being the street the line runs under within Ottawa's downtown core. Location This O-Train station opened on September 14, 2019. It is located at the Lyon Street North and Queen Street intersection, between Bay Street and Kent Street, which formerly served as Transitway bus stops on Albert Street and Slater Street. This stop is projected to have high usage, with access to Sparks Street, the Supreme Court of Canada, Supreme Court, and the Library and Archives Canada, National Archives of Canada. Layout The station is an underground side platform station; the platforms are located 17.5 metres underground. A concourse above platform level has ticket barriers on either end, giving access to the Lyon Street (east) and Place de Ville (west) accesses. An entrance is integrat ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  


picture info

O-Train
The O-Train is a light rail system in Ottawa, Ontario, Canada, operated by OC Transpo. The O-Train system consists of three lines, all of which are fully Grade separation, grade-separated. As of March 2025, one line is currently being extended and a new line will be added as part of the Stage 2 project, with new segments being phased in between 2025 and 2027. The O-Train network currently operates one Electric multiple unit, electric light rail line, Line 1 (O-Train), Line 1, and two Hybrid rail, diesel light rail lines, Line 2 (O-Train), Line 2 and Line 4 (O-Train), Line 4. Line 1 travels in a 2.8 km tunnel in the downtown core, and the rest of the network continues to operate grade-separated on surface-level, trenched, or elevated tracks. Line 1 is being extended in both directions, with the eastward extension to Trim station in Orleans scheduled to open first in 2025. By 2027, the westward expansion of Line 1 to Baseline station, Algonquin station and the construction of new L ...
[...More Info...]      
[...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]  



MORE