Build! Build! Build! Infrastructure Plan
The Build! Build! Build! Infrastructure Program (BBB) was the infrastructure program of Duterte administration, the administration of Rodrigo Duterte, the 16th president of the Philippines. A key component of DuterteNomics, his socioeconomic policy, the program aimed to reduce poverty, encourage economic growth and reduce congestion in Metro Manila, and address the country's infrastructure gap. Launched on April 18, 2017, the program also included the continuation of 44 infrastructure projects under previous administrations. The Build! Build! Build! program was superseded by the Build Better More (BBM) infrastructure program of Presidency of Bongbong Marcos, the administration of Duterte's successor, Bongbong Marcos; government officials have described the new program as an expansion of the BBB program. List of associated projects In November 2019, the government revised its list of flagship infrastructure projects under the program, expanding it to 100. It was revised agai ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
LRT Line 6 (Cavite)
The Light Rail Transit Line 6 is a proposed rapid transit system in Cavite, Philippines. There have been two proposals for the line, with the first one shelved immediately in 2018. Another proposal emerged in 2017 and is currently under review by the National Economic and Development Authority (NEDA). Background and history The province of Cavite is known as a "bedroom community" for those who work in Metro Manila. Over the recent decades, urbanization has been widespread in the country and urban sprawl has been most evident within the Greater Manila Area. The LRT Line 6 aims to provide rail transport options to 45 percent of Cavite's population which are concentrated on the cities of Bacoor, Imus and Dasmariñas. Early trains in Cavite Trains belonging to the Manila Railroad Company previously plied the Naic line from Paco station in Manila to Naic station in Naic, Cavite. The commuter rail line was opened in 1909 by the virtue of Insular Government Act No. 1905. It had 19 ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
EDSA Busway
The EDSA Carousel, also known as Route 1 and formerly and still referred to as Route E, is a bus rapid transit (BRT) system, part of several List of bus routes in Metro Manila, bus routes in Metro Manila. It is situated along EDSA (Circumferential Road 4, C-4 Road) and other roads, running on a dedicated right-of-way (traffic), right-of-way called the EDSA Busway, separated from normal road traffic in most of its stretch by Traffic barrier, concrete barriers and steel bollards on the innermost lane. Interim operations began on June 1, 2020, serving as a replacement of the former bus routes along EDSA, acting as an augmentation service to the MRT Line 3 (Metro Manila), MRT Line 3 due to the limited capacity restrictions put in place by the COVID-19 community quarantines in the Philippines, general community quarantine in Metro Manila as a result of the COVID-19 pandemic in the Philippines. Full operations began later on July 1, 2020. Intended to be largely served by bus stops alo ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
Cebu Bus Rapid Transit System
The Cebu Bus Rapid Transit System (branded as CEBRT) is a mass transit system under construction in Cebu City, Philippines. It is expected to become the first operational bus rapid transit project in the Philippines.Valentina Lopez (July 2010)“Update: The Progression of the Cebu BRT Project and its Impact in the Philippines”. PPIAF. Retrieved 2011-01-27 Only one line has been planned in detail so far, but scheme developers note the potential to develop a larger network comprising the adjacent cities of Lapu-Lapu City, Lapu-Lapu, Mandaue, and Talisay, Cebu, Talisay, all of which, together with Cebu City, form part of the Metro Cebu, Cebu metropolitan area.Integrated Transport Planning Ltd (2010). “Study and Concept Plan for a Demonstration Bus Rapid Transit Corridor”. For World Bank and PPIAF. The project has faced numerous delays since its supposed implementation in 2016, from disagreements in the route alignments. The COVID-19 pandemic and Typhoon Rai (local name ''Odett ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
Cebu Light Rail Transit System
The Cebu Monorail Transit System, simply known as the Cebu Monorail, was a proposed monorail rapid transit system to be built in Metro Cebu, Philippines. Originally proposed by the Japanese in 2015 as the Cebu MRT System, it was revised to a light rail line in the late 2010s, dubbed the Cebu Light Rail Transit System or Cebu LRT. It was then again revised to its present form in late 2019. The system would consist of two lines, one in mainland Cebu named the ''Central Line'' and another leading to Mactan–Cebu International Airport, named the ''Airport Line''. The system was originally set to begin construction in 2021 and to partially open before year-end. The entire system was due to begin operating by May or June 2022. , the project is still awaiting approval from relevant government bodies, but no progress has been made. Background The island of Cebu was historically served by the Cebu Line of the Panay Railways, Philippine Railway Company between 1911 and 1942. After ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
Mindanao Railway
The Mindanao Railway, previously known as the Trans-Mindanao High Speed Railway, is a proposed railway system in Mindanao, the southernmost major island of the Philippines. Originally proposed in 1936 as part of Manuel L. Quezon's efforts to strengthen the presence of Commonwealth government in Mindanao against the rising influence of Imperial Japan before World War II, the line was shelved. Other proposals and studies were made in the 1950s, 1990s, and the 2000s, but never materialized. The current line began development in 2018; however, construction has yet to start. It will be initially built as a single-track standard gauge system to be operated by diesel-powered rolling stock, but will have provisions for upgrading to double-track and electrification through overhead lines. The system will be constructed as a network long in its present form, totalling of track, with the centerpiece being a circumferential mainline that connects some of the major cities of the island ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
SkyTrain (Metro Manila)
SkyTrain is a proposed automated people mover line meant to serve the city of Makati and Bonifacio Global City area in Taguig, Metro Manila. Originally scheduled for completion in 2021, as of March 2022, construction has yet to begin. History Development Infracorp Development Inc., a subsidiary of Alliance Global Group of Andrew Tan submitted an unsolicited proposal to build a people mover system which will link the Fort Bonifacio area in Taguig and the Guadalupe MRT station in Makati on October 26, 2017 to the Department of Transportation (DOTr). The proposal was officially endorsed by the DOTr in May 2018 and Infracorp was given "original proponent status" by the government agency. Following the DOTr's endorsement, the proposal is subject to review by the Investment Coordination Committee of the National Economic and Development Authority Board. After Infracorp was given "original proponent status" over the SkyTrain project, the firm began looking for an operations an ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
PNR South Long Haul
The PNR South Long Haul, also known as the PNR Bicol, was a proposed inter-city rail line project in southern Luzon, Philippines. It is part of the larger Luzon Rail System, a network of long-distance standard-gauge lines being built by the Philippine National Railways throughout Luzon. It is one of the two lines would have reconstructed the historic PNR South Main Line, along with the electrified North–South Commuter Railway South section to Calamba, Laguna. The line will initially begin at Banlic station in Calamba, Laguna and terminate at Daraga, Albay. It would have also plan an additional extensions, infill stations, and branch lines. The masterplan line shall connect passengers from Sucat station in Muntinlupa to either the Batangas International Port, Legazpi, Albay, or Matnog, Sorsogon. Freight trains will also serve the line and there will be an eventual extension of the line to the Port of Manila. The project was estimated to cost ₱175 billion (US$3.45 billi ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
North–South Commuter Railway
The North–South Commuter Railway (; NSCR), also known as the Clark–Calamba Railway, is a commuter rail system under construction on the island of Luzon in the Philippines. Running from New Clark City in Capas, Tarlac, to Calamba, Laguna, with 36 stations and four services, the railway is designed to improve connectivity within the Greater Manila Area and will be integrated with the railway network in the region. Originally planned in the 1990s, the railway project has had a tumultuous history, being repeatedly halted and restarted for various reasons. The first proposals were the "Manila–Clark rapid railway" with Spain in the 1990s, alongside the "Manila–Calabarzon Express". During the 2000s, the Northrail project with China was initiated but discontinued in 2011 due to allegations of overpricing. The railway's current incarnation began development in 2013. The project's initial phase was approved in 2015, and construction began in 2019. Expected to cost , the lin ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
Philippine National Railways
The Philippine National Railways (PNR) (; ) is a government-owned and controlled corporation, state-owned railway company in the Philippines which operates one commuter rail service between Laguna (province), Laguna and Quezon, and local services between Sipocot, Camarines Sur, Sipocot, Naga, Camarines Sur, Naga and Legazpi, Albay, Legazpi in the Bicol Region. It is an attached agency of the Department of Transportation (Philippines), Department of Transportation. Philippine National Railways traces its roots to the Ferrocarril de Manila-Dagupan, founded on November 24, 1892 during the History of the Philippines (1521–1898), Spanish colonial period, and later becoming the Manila Railroad Company (MRR) during the History of the Philippines (1898–1946), American colonial period. Founded on June 20, 1964, by virtue of Republic Act No. 4156, the PNR used to operate over of route from La Union to the Bicol Region. However, neglect reduced the railway's service, and persistent p ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
Panay Railways
Panay Railways, Inc. is a government-owned and controlled corporation of the Philippines that formerly operated railway systems on the islands of Panay and Cebu. It is headquartered in La Paz, Iloilo City, and is a subsidiary of Phividec Railways, Inc. under the Philippine Veterans Investment Development Corporation (PHIVIDEC). While Panay Railways currently does not operate any trains, it leases its property, and the generated revenue is utilized to cover personnel and administrative costs associated with maintaining its assets. The company has been owned in succession by the Rehabilitation Finance Corporation which became the Development Bank of the Philippines (1945–74), and then it was sold to the PHIVIDEC (1974–79). In 1979, management and operations were transferred to the Philippine Sugar Commission (PHILSUCOM) which changed the company's name to the current Panay Railways, Inc. On September 26, 1995, PHIVIDEC re-acquired ownership of Panay Railways from the Sugar Re ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
North Triangle Common Station
The North Triangle Common Station, officially designated as the Unified Grand Central Station and North EDSA for the MRT Line 7, commonly known as the Common Station or North Triangle station, is an under-construction rapid transit terminal and transport hub that will connect LRT Line 1, MRT Line 3, and MRT Line 7, and the nearby Metro Manila Subway. It is located in Bagong Pag-asa, Quezon City, Philippines, and is named after its location, which is at the corner of EDSA and North Avenue. The common alignment had been in limbo for years since the Department of Transportation and Communications (DOTC), now Department of Transportation (DOTr), reviewed the project's technical and financial components. It was in January 2017 that an agreement was reached to build the station. The groundbreaking of the station was held at the North Triangle Transport Terminal in September 2017. The station was initially expected to fully open in January 2021, but repeated delays have set back ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |