AS-105
AS-105 was the fifth and final orbital flight of a boilerplate Apollo spacecraft, and the third and final launch of a Pegasus micrometeroid detection satellite. It was launched by SA-10, the tenth and final Saturn I rocket, in 1965. Overview AS-105 was an Apollo boilerplate spacecraft; boilerplate BP-9A was used for the flight. The spacecraft reentered on November 22, 1975. The Saturn launch vehicle (SA-10) was similar to those of missions AS-103 and AS-104. As on the previous mission, the boilerplate service module was equipped with a test installation of a reaction control engine package. The primary flight objective was to continue demonstration of the launch vehicle's iterative guidance mode and evaluation of system accuracy. Launch AS-105 was launched from Cape Kennedy Launch Complex 37B at 08:00 EST (13:00 GMT) on July 30, 1965, on the last Saturn I rocket, SA-10. A planned thirty-minute hold ensured that launch time coincided with the opening of the Pegasus ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
AS-104
AS-104 was the fourth orbital test of a boilerplate Apollo spacecraft, and the second flight of the Pegasus micrometeoroid detection satellite. It was launched by SA-8, the ninth Saturn I carrier rocket. Objectives The primary mission objective was to demonstrate the launch vehicle's iterative guidance mode and to evaluate system accuracy. The launch trajectory was similar to that of mission AS-103. The Saturn launch vehicle SA-8 and payload were similar to those of mission AS-103, except that a single reaction control engine assembly was mounted on the boilerplate service module (BP-26). The assembly was instrumented to acquire additional data on launch environment temperatures. This assembly also differed from the one on the AS-101 mission in that two of the four engines were of a prototype configuration instead of all engines being simulated. Launch This was the first nighttime launch in the Saturn I series. A built-in 35 minute hold was used to ensure that launch time coin ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
Boilerplate (spacecraft)
A boilerplate spacecraft, also known as a mass simulator, is a nonfunctional craft or payload that is used to test various configurations and basic size, load, and handling characteristics of rocket launch vehicles. It is far less expensive to build multiple, full-scale, non-functional boilerplate spacecraft than it is to develop the full system (design, test, redesign, and launch). In this way, boilerplate spacecraft allow components and aspects of cutting-edge aerospace projects to be tested while detailed contracts for the final project are being negotiated. These tests may be used to develop procedures for mating a spacecraft to its launch vehicle, emergency access and egress, maintenance support activities, and various transportation processes. Boilerplate spacecraft are most commonly used to test crewed spacecraft; for example, in the early 1960s, NASA performed many tests using boilerplate Apollo spacecraft atop Saturn I rockets, and Mercury spacecraft atop Atlas rocke ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
Saturn I
The Saturn I was a rocket designed as the United States' first medium lift launch vehicle for up to low Earth orbit payloads.Terminology has changed since the 1960s; back then, 20,000 pounds was considered "heavy lift". The rocket's first stage was built as a cluster of propellant tanks engineered from older rocket tank designs, leading critics to jokingly refer to it as "Cluster's Last Stand". Its development was taken over from the Advanced Research Projects Agency in 1958 by the newly formed civilian NASA. Its design proved sound and flexible. It was successful in initiating the development of liquid hydrogen-fueled rocket propulsion, launching the Pegasus satellites, and flight verification of the Apollo command and service module launch phase aerodynamics. Ten Saturn I rockets were flown before it was replaced by the heavy lift derivative Saturn IB, which used a larger, higher total impulse second stage and an improved guidance and control system. It also led the ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
Cape Canaveral Air Force Station Space Launch Complex 37
Space Launch Complex 37 (SLC-37), previously Launch Complex 37 (LC-37), is a launch complex on Cape Canaveral Space Force Station, Florida. Construction began in 1959 and the site was accepted by NASA to support the Saturn I program in 1963. The complex consists of two launch pads. LC-37A has never been used, but LC-37B launched uncrewed Saturn I flights (1964 to 1965) and was modified and launched Saturn IB flights (1966 to 1968), including the first (uncrewed) test of the Apollo Lunar Module in space (Apollo 5). It was deactivated in 1972. In 2001 it was modified as the launch site for Delta IV, a launch system operated by United Launch Alliance. The original layout of the launch complex featured one Mobile Service Structure which could be used to service or mate a rocket on either LC-37A or 37B, but not on both simultaneously. The Delta IV Mobile Service Tower is tall, and fitted to service all Delta IV configurations, including the Delta IV Heavy. Launch history Rocket con ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
AS-201
AS-201 (or SA-201), flown February 26, 1966, was the first uncrewed test flight of an entire production Block I Apollo command and service module and the Saturn IB launch vehicle. The spacecraft consisted of the second Block I command module and the first Block I service module. The suborbital flight was a partially successful demonstration of the service propulsion system and the reaction control systems of both modules, and successfully demonstrated the capability of the command module's heat shield to survive re-entry from low Earth orbit. Vehicle configuration Spacecraft The command and service module CSM-009 was a Block I version, designed before the lunar orbit rendezvous method was chosen for the Apollo lunar landing; therefore it lacked capability to dock with a lunar module. Block I also employed preliminary designs of certain subsystems, and was heavier than the Block II version with lunar mission capability. All previous command and service modules flown (with one ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
Boilerplate (spaceflight)
A boilerplate spacecraft, also known as a mass simulator, is a nonfunctional craft or payload that is used to test various configurations and basic size, load, and handling characteristics of rocket launch vehicles. It is far less expensive to build multiple, full-scale, non-functional boilerplate spacecraft than it is to develop the full system (design, test, redesign, and launch). In this way, boilerplate spacecraft allow components and aspects of cutting-edge aerospace projects to be tested while detailed contracts for the final project are being negotiated. These tests may be used to develop procedures for mating a spacecraft to its launch vehicle, emergency access and egress, maintenance support activities, and various transportation processes. Boilerplate spacecraft are most commonly used to test crewed spacecraft; for example, in the early 1960s, NASA performed many tests using boilerplate Apollo spacecraft atop Saturn I rockets, and Mercury spacecraft atop Atlas roc ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
1965 In The United States
Events from the year 1965 in the United States. Incumbents Federal Government * President: Lyndon B. Johnson ( D-Texas) * Vice President: ''vacant'' (until January 20), Hubert Humphrey ( D-Minnesota) (starting January 20) * Chief Justice: Earl Warren (California) * Speaker of the House of Representatives: John William McCormack ( D-Massachusetts) * Senate Majority Leader: Mike Mansfield ( D-Montana) * Congress: 88th (until January 3), 89th (starting January 3) Events January * January 1 – The ship '' S.S. Catala'' is driven onto the beach in Ocean Shores, Washington, stranding her. * January 4 – President Lyndon B. Johnson proclaims his "Great Society" during his State of the Union Address. * January 19 – The unmanned ''Gemini 2'' is launched on a suborbital test of various spacecraft systems. * January 20 – President Lyndon B. Johnson begins his full term. Hubert Humphrey is sworn in as Vice President of the United States. February * Febru ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
Spacecraft Launched In 1965
A spacecraft is a vehicle or machine designed to fly in outer space. A type of artificial satellite, spacecraft are used for a variety of purposes, including communications, Earth observation, meteorology, navigation, space colonization, planetary exploration, and transportation of humans and cargo. All spacecraft except single-stage-to-orbit vehicles cannot get into space on their own, and require a launch vehicle (carrier rocket). On a sub-orbital spaceflight, a space vehicle enters space and then returns to the surface without having gained sufficient energy or velocity to make a full Earth orbit. For orbital spaceflights, spacecraft enter closed orbits around the Earth or around other celestial bodies. Spacecraft used for human spaceflight carry people on board as crew or passengers from start or on orbit (space stations) only, whereas those used for robotic space missions operate either autonomously or telerobotically. Robotic spacecraft used to support scientific re ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
A-004
A-004 was the sixth and final test of the Apollo launch escape vehicle and the first flight of a Block I production-type Apollo Command/Service Module. Objectives Mission A-004 was uncrewed and was conducted to demonstrate that # The launch escape vehicle would satisfactorily orient and stabilize itself in the proper attitude after being subjected to a high rate of tumbling during the powered phase of an abort # The escape vehicle would maintain its structural integrity under test conditions in which the command module structure was loaded to the design limit. The launch vehicle was the fifth and final Little Joe II flown. The propulsion system consisted of four Algol and five Recruit rocket motors. The attitude control system was similar to the one used on mission A-003 except that the reaction control system was deleted and the vehicle was provided with the capability of responding to a radio-transmitted pitch up command. The pitch up maneuver was required to help initiate ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
Pad Abort Test-2 (Apollo)
Pad Abort Test 2 was the follow-on second pad abort test, abort test to Pad Abort Test 1 of the Apollo spacecraft . Objectives Apollo Pad Abort Test 2 was the fifth of six uncrewed Apollo missions that flight tested the capability of the Apollo spacecraft#Launch escape system (LES), launch escape system (LES) to provide for safe recovery of Apollo crews under critical abort conditions. This flight was the second test of the launch escape system with the abort initiated from the launch pad. The launch escape system included qualified launch escape and pitch motors and was equipped with canards to orient the vehicle aft heat shield forward prior to tower jettison and parachute deployment. A boost protective cover was also provided. The spacecraft was BP-23A, a Boilerplate (spaceflight), boilerplate Apollo command module that had been used on mission A-002 and refurbished to more nearly simulate a Block-I-type command module in mass and other characteristics. The Earth landing system ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |
|
S-IV
The S-IV was the second stage of the Saturn I rocket used by NASA for early flights in the Apollo program. The S-IV was manufactured by the Douglas Aircraft Company and later modified by them to the S-IVB, a similar but distinct stage used on the Saturn IB and Saturn V rockets. The S-IV stage was a large LOX/LH2-fueled rocket stage used for the early test flights of the Saturn I rocket. It formed the second stage of the Saturn I and was powered by a cluster of six RL-10A-3 engines. Each one of the engines supplied of thrust for a total of about . The cryogenic LH2 (liquid hydrogen) and LOX (liquid oxygen Liquid oxygen—abbreviated LOx, LOX or Lox in the aerospace, submarine and gas industries—is the liquid form of molecular oxygen. It was used as the oxidizer in the first liquid-fueled rocket invented in 1926 by Robert H. Goddard, an a ...) tanks were separated by a common bulkhead. The forward bulkhead of the LOX tank formed the aft bulkhead of the LH2 tank. T ... [...More Info...]       [...Related Items...]     OR:     [Wikipedia]   [Google]   [Baidu]   |