Yuancun Station (Guangzhou Metro)
   HOME

TheInfoList



OR:

Yuancun station () is an
interchange station An interchange station or a transfer station is a train station for more than one railway route in a public transport system that allows passengers to change from one route to another, often without having to leave a station or pay an additional ...
between Line 5 and Line 11 of the
Guangzhou Metro The Guangzhou Metro ( zh, s=广州地铁, labels=no) is the rapid transit system of the city of Guangzhou in the Guangdong Province of China. It is operated by the state-owned Guangzhou Metro Corporation and was the fourth metro system to be b ...
. It is located under the junction of Huacheng Avenue East () and Yuancun 2nd Cross Road () in
Tianhe District Tianhe District () is one of the eleven districts of Guangzhou, the capital of Guangdong province. In Chinese, the name Tianhe literally means "River of Heaven", which is also a Chinese name for the Milky Way. It is bordered by Yuexiu District ...
. It lies to the east of
Zhujiang New Town Zhujiang New Town or Zhujiang New City is a central business district in Tianhe District, Guangzhou city, Guangdong province, China. It is bounded by Huangpu Avenue on the north, the Pearl River on the south, Guangzhou Avenue on the west ...
and to the north of
Pazhou Pazhou is a subdistrict of Haizhu in southeastern Guangzhou, Guangdong Province, in China. , formerly Whampoa Island, has a total area of and is the site of Pazhou Pagoda. Its eastern bay was formerly the chief anchorage for ships part ...
, and was opened on 28 December 2009. Line 11 started operations at this station on 28 December 2024. Prior to the opening of Line 11, the dismantling work of the section from this station to of Line 21 took place between 2 October 2024 and 27 December 2024, and the terminus of Line 21 was adjusted north to . The 6B train type's shielding doors and glass panel false walls of the outer platform were removed, and then the appropriate shielding doors of the 8A train type were installed. At the same time, it was necessary to dismantle the outer platform and the third track between the station and the Tianhe Park station area and replace the signal system to Line 11 standards.


Usage

There are many residential communities and natural estates around the station, and there are also many primary and secondary schools nearby, so there is a large number of passengers entering and exiting on weekdays. After the opening of the remaining section of Line 21, the station became an interchange station for Line 5 and Line 21, attracting a large number of passengers to transfer at this station, making the station more congested during peak hours and increasing the passenger pressure of Line 5. After Line 21 was shortened to Tianhe Park in October 2024, the congestion at the station during peak hours was greatly alleviated. Currently, passenger flow control measures are in place between 07:45 and 09:30 on weekdays. Platform 2, Yuancun Station, Guangzhou Metro 20220121.jpg, Line 5 platform 2 during peak hours


Station layout


Line 5


Line 11


Exits


Gallery

Yuancun Station Platform 4 2019 12.jpg, Line 21 platform (prior to renovation) Yuancun Station Concourse.JPG, Line 5 Concourse Yuancun Station B1 Concourse for Line 21 2019 12.jpg, Line 21 Upper Concourse (prior to renovation) Yuancun Station B2 Concourse for Line 21 2019 12 Part 1.jpg, Line 21 Lower Concourse (prior to renovation) Yuancun Station Line 11 Concourse 20241230-A.jpg, Line 11 Upper Concourse (post renovation) Yuancun Station Line 11 Concourse 20241230-B.jpg, Line 11 Lower Concourse (post renovation) Yuancun Station Platform 3 20241230.jpg, Line 11 Outer Circle platform (post renovation) Yuancun Station Platform 1 Panorama 20250108.jpg, Line 5 platform panorama Yuancun Station Platform 4 Panorama 20250108.jpg, Line 11 platform panorama (post renovation)


History


Planning

Yuancun Station first appeared in 1997 in the "Guangzhou City Expressway, Traffic Line Planning Study (Final Report)", and the station was located on Line 3 at that time, in which the location was essentially the same as the current one. Later, in the 2003 plan, the original Line 3 was renamed Line 5, and the station was still placed and set for construction. Later, in the 2008 proposal, Line 8, which was planned as a circular line at that time, also passed through this station and became one of the interchange stations with Line 5. Later, in the 2010 plan, the ring line was changed to a completely new project, and the number was adjusted to Line 11. The station thus became an interchange between Lines 5 and 11. In the further design of Line 21, it was considered that by the time that Line 21 opened, Lines 11 and 13 at its intended terminus at had not yet been completed and opened, making Line 21 a "dead end" when it reached the terminal station. Therefore, Line 21 temporarily borrowed a section of line from Line 11 by running from Tianhe Park Station to this station, so that Line 21 can interchange with Line 5 and provide better access to the line network. On the eve of the completion of Line 11, the section was dismantled from Line 21 and returned to Line 11 for operation.


Construction

On 20 December 2013, the construction of the Line 21 station began, which was the first station of Line 21 to start construction. In response to the construction of the Line 21 station, the original paid area of the Line 5 concourse was changed from the original north side to the south side, the shops were demolished, and the police station was relocated. In July 2018, the main structure of the station of Line 21 was topped out. On 6 December 2018, in order to cooperate with the construction of Line 21, Exit A, which was originally located near Exit D, was closed. On 20 December 2019, the Line 21 station was opened with the opening of the remaining section of Line 21, and the station code was set as at the time. Exit A, which was closed earlier, had been relocated to the east side of Yuancun 2nd Cross Road near Shidong Primary School and reopened on the same day. During the construction of the Line 21 station, a platform that can accommodate 8-car A-type cars (the model used by Line 11) was directly built at the time of construction. Since Line 21 itself uses 6-car group B type cars, the platform screen door is installed according to the 6B-type train, and the extra length is directly closed by the glass plate false wall. During the dismantling and transformation project, the original 6B-type screen door and glass plate false wall of the platform were dismantled, and the screen door suitable for the 8A-type was installed at the same time. Moreover, the contact network required for Line 11 has also been installed in advance by Line 21, the switchback line and the section from this station to Tianhe Park Station, and the third track of the section will be removed and the signaling system used by Line 11 will be replaced at the same time. With the imminent opening of Line 11, on 2 October 2024, the dismantling project of Line 21 will be initiated, and the station body part of Line 21 (platforms 3-4, concourse, Exits A, E, and F) will be temporarily closed until after the opening of Line 11. After this part of the station was transferred to Line 11, the existing storage line will also be used to store the spare trains of Line 11. At the end of the same month, the station renovation project was completed and the "three rights" transfer was completed. On 28 December 2024, the original station body of Line 21 was handed over and resumed with the opening of Line 11.


References


External links

{{Guangzhou Metro , line5=yes , line11=yes Railway stations in China opened in 2009 Railway stations in China opened in 2019 Guangzhou Metro stations in Tianhe District