
Transrapid is a German-developed
high-speed monorail train using
magnetic levitation. Planning for the Transrapid system started in 1969 with
a test facility for the system in Emsland, Germany completed in 1987. In 1991, technical readiness for application was approved by the
Deutsche Bundesbahn in cooperation with renowned universities.
The last version, the Transrapid 09, is designed for a cruising speed of and allows acceleration and deceleration of approximately .
In 2002, the first commercial implementation was completed – the
Shanghai Maglev Train, which connects the city of Shanghai's rapid transit network to
Shanghai Pudong International Airport. The Transrapid system has not yet been deployed on a long-distance intercity line.
The system is developed and marketed by Transrapid International, a joint venture of
Siemens and
ThyssenKrupp.
In 2011, the Emsland test track closed down when its operating license expired. In early 2012, demolition and reconversion of the entire Emsland site including the factory was approved. In September 2017, there were plans to use the last Transrapid 09 as a conference and museum space on the grounds of Fleischwarenfabrik Kemper.
Technology
Levitation
The super-speed Transrapid maglev system has no wheels, no axles, no gear transmissions, no steel rails, and no overhead electrical
pantographs
A pantograph (, from their original use for copying writing) is a mechanical linkage connected in a manner based on parallelograms so that the movement of one pen, in tracing an image, produces identical movements in a second pen. If a line dr ...
. The maglev vehicles do not roll on wheels; rather, they hover above the track guideway, using the
attractive magnetic force between two linear arrays of electromagnetic coils—one side of the coil on the vehicle, the other side in the track guideway, which function together as a magnetic dipole. During levitation and travelling operation, the Transrapid maglev vehicle floats on a frictionless magnetic cushion with no mechanical contact whatsoever with the track guideway. On-board vehicle electronic systems measure the dipole gap distance 100,000 times per second to guarantee the clearance between the coils attached to the underside of the guideway and the magnetic portion of the vehicle wrapped around the guideway edges. With this precise, constantly updated electronic control, the dipole gap remains nominally constant at . When levitated, the maglev vehicle has about of clearance above the guideway surface.
The Transrapid maglev vehicle requires less power to hover than it needs to run its on-board air conditioning equipment.
In Transrapid vehicle versions TR08 and earlier, when travelling at speeds below , the vehicle levitation system and all on-board vehicle electronics were supplied with power through physical connections to the track guideway. At vehicle speeds above , all on-board power was supplied by recovered
harmonic oscillation of the
magnetic field
A magnetic field is a vector field that describes the magnetic influence on moving electric charges, electric currents, and magnetic materials. A moving charge in a magnetic field experiences a force perpendicular to its own velocity and t ...
s created from the track's linear stator. (Since these oscillations are parasitic, they cannot be used for vehicle propulsion). A new energy transmission system, version TR09, has since been developed for Transrapid, in which maglev vehicles now require no physical contact with the track guideway for their on-board power needs, regardless of the maglev vehicle speed. This feature helps to reduce on-going maintenance and operational costs.
In case of power failure of the track's propulsion system, the maglev vehicle can use on-board backup batteries to temporarily power the vehicle's levitation system.
Propulsion
The Transrapid maglev system uses a synchronous ''longstator''
linear motor for both propulsion and braking. It works like a rotating
electric motor
An electric motor is an electrical machine that converts electrical energy into mechanical energy. Most electric motors operate through the interaction between the motor's magnetic field and electric current in a wire winding to generate forc ...
whose
stator
The stator is the stationary part of a rotary system, found in electric generators, electric motors, sirens, mud motors or biological rotors. Energy flows through a stator to or from the rotating component of the system. In an electric ...
is "unrolled" along the underside of the guideway; instead of producing
torque
In physics and mechanics, torque is the rotational equivalent of linear force. It is also referred to as the moment of force (also abbreviated to moment). It represents the capability of a force to produce change in the rotational motion of t ...
(rotation) it produces a linear force along its length. The electromagnets in the maglev vehicle which lift it also work as the equivalent of the excitation portion (
rotor) of this linear electric motor. Since the magnetic travelling field works in only one direction, if there were to be several maglev trains on a given track section, they would all travel in the same direction thereby reducing the possibility of collision between moving trains.
Energy requirements
The normal energy consumption of the Transrapid is approximately per section for levitation and travel, and vehicle control. The
drag coefficient of the Transrapid is about 0.26. The
aerodynamic drag of the vehicle, which has a frontal cross section of , requires a power consumption, at or cruising speed, given by the following formula:
Power consumption compares favourably with other high-speed rail systems. With an efficiency of 0.85, the power required is about 4.2 MW. Energy consumption for levitation and guidance purposes equates to approximately 1.7 kW/t. As the propulsion system is also capable of functioning in reverse, energy is transferred back into the
electrical grid
An electrical grid is an interconnected network for electricity delivery from producers to consumers. Electrical grids vary in size and can cover whole countries or continents. It consists of:Kaplan, S. M. (2009). Smart Grid. Electrical Power ...
during braking. An exception to this is when an emergency stop is performed using the emergency landing skids beneath the vehicle, although this method of bringing the vehicle to a stop is intended only as a last resort should it be impossible or undesirable to keep the vehicle levitating on back-up power to a natural halt.
Market segment, ecological impact and historical parallels
Compared to classical railway lines, Transrapid allows higher speeds and gradients with less weathering and lower energy consumption and maintenance needs. The Transrapid track is more flexible, and more easily adapted to specific geographical circumstances than a classical train system. Cargo is restricted to a maximum payload of per car. Transrapid allows maximum speeds of , placing it between conventional high speed trains () and air traffic (). The magnetic field generator, an important part of the engine being a part of the track, limits the system capacity.
From a competition standpoint, the Transrapid is a proprietary solution. The track being a part of the engine, only the single-source Transrapid vehicles and infrastructure can be operated. There is no multisourcing foreseen concerning vehicles or the highly complicated crossings and switches. Unlike classical railways or other infrastructure networks, as jointly administrated by the
Federal Network Agency (Bundesnetzagentur) in Germany, a Transrapid system does not allow any direct competition.
Ecological impact
The Transrapid is an electrically driven, clean, high-speed, high-capacity means of transport able to build up point-to-point passenger connections in geographically challenged surroundings. This has to be set in comparison with the impact on heritage and or landscape protection areas (compare
Waldschlösschen Bridge). Any impact of emissions has to take into account the source of electrical energy. The reduced expense, noise and vibration of a people-only Transrapid system versus a cargo train track is not directly comparable. The reuse of existing tracks and the interfacing with existing networks is limited. The Transrapid indirectly competes for resources, space and tracks in urban and city surroundings with classical urban transport systems and high speed trains.
Comparative costs
Track construction cost
The fully elevated
Shanghai Maglev was built at a cost
of US$1.33 billion over a length of including trains and stations. Thus the cost per km for dual track was US$43.6 million, including trains and stations. This was the first commercial use of the technology. Since then conventional fast rail track has been mass-produced in China for between US$4.6 and US$30.8 million per kilometer, mostly in rural areas. (See
High-speed rail in China).
In 2008 Transrapid Australia quoted the
Victoria State Government
A$34 million per kilometer for dual track.
[Transrapid quote to Victorian Government](_blank)
/ref> This assumed 50% of the track was at grade and 50% was elevated. In comparison, the Regional Rail Link to be built in Victoria will cost A$5 billion, or A$105 million per kilometer, including two stations.
From the above it is not possible to say whether Transrapid or conventional fast rail track would be cheaper for a particular application.
The higher operating speed of the maglev system will result in more passengers being delivered over the same distance in a set time. The ability of the Transrapid system to handle tighter turns and steeper gradients could heavily influence a cost comparison for a particular project.
Train purchase cost
In 2008, Transrapid Australia quoted the Victorian
Victorian or Victorians may refer to:
19th century
* Victorian era, British history during Queen Victoria's 19th-century reign
** Victorian architecture
** Victorian house
** Victorian decorative arts
** Victorian fashion
** Victorian literature ...
State Government between A$16.5 million (commuter) and A$20 million (luxury) per trains section or carriage. Due to the width of the Transrapid carriages they have a floor area of about . This works out at between A$179,000 and A$217,000 per square meter.
In comparison, InterCityExpress which are also built by Siemens cost about A$6 million per carriage. Due to the width of the ICE carriages they have a floor area of about . This works out at about A$83,000 per square meter.
This shows Transrapid train sets are likely to cost over twice as much as ICE 3 conventional fast rail train sets at this time. However, each Transrapid train set is more than twice as efficient due to their faster operating speed and acceleration according to UK Ultraspeed. In their case study only 44% as many Transrapid train sets are needed to deliver the same number of passengers as conventional high-speed trains.
Operational cost
Transrapid claims their system has very low maintenance costs compared to conventional high speed rail systems due to the non-contact nature of their system.[Transrapid Website - Economic Efficiency](_blank)
Implementations
China
The only commercial implementation so far was in the year 2000, when the Chinese government ordered a Transrapid track to be built connecting Shanghai to its Pudong International Airport.
It was inaugurated in 2002 and regular daily trips started in March 2004. The travel speed is , which the Maglev train maintains for 50 seconds as the short, track only allows the cruising speed to be maintained for a short time before deceleration must begin. The average number of riders per day (14 hours of operation) is about 7,500, while the maximum seating capacity
Seating capacity is the number of people who can be seated in a specific space, in terms of both the physical space available, and limitations set by law. Seating capacity can be used in the description of anything ranging from an automobile th ...
per train is 440. A second class ticket price of about 50 RMB ( renminbi) (about 6 euro
The euro (symbol: €; code: EUR) is the official currency of 19 out of the member states of the European Union (EU). This group of states is known as the eurozone or, officially, the euro area, and includes about 340 million citizens . ...
) is four times the price of the airport bus and ten times more expensive than a comparable underground ticket.
The project was sponsored by the German Hermes
Hermes (; grc-gre, Ἑρμῆς) is an Olympian deity in ancient Greek religion and mythology. Hermes is considered the herald of the gods. He is also considered the protector of human heralds, travellers, thieves, merchants, and orato ...
loans with DM 200 million. The total cost is believed to be $1.33 billion.
A planned extension of the line to Shanghai Hongqiao Airport () and onward to the city of Hangzhou
Hangzhou ( or , ; , , Standard Mandarin pronunciation: ), also romanized as Hangchow, is the capital and most populous city of Zhejiang, China. It is located in the northwestern part of the province, sitting at the head of Hangzhou Bay, wh ...
() has been repeatedly delayed. Originally planned to be ready for Expo 2010
Expo 2010, officially the Expo 2010 Shanghai China, was held on both banks of the Huangpu River in Shanghai, China, from 1 May to 31 October 2010. It was a major World Expo registered by the Bureau International des Expositions (BIE), in the ...
, final approval was granted on 18 August 2008, and construction was scheduled to start in 2010 for completion in 2014. However the plan is cancelled, possibly due to the building of the high speed Shanghai–Hangzhou Passenger Railway.
Germany
The Emsland test facility was the only Transrapid track in Germany. It has been deactivated, and is scheduled to be disassembled.
Planned systems
Iran
In 2007, Iran
Iran, officially the Islamic Republic of Iran, and also called Persia, is a country located in Western Asia. It is bordered by Iraq and Turkey to the west, by Azerbaijan and Armenia to the northwest, by the Caspian Sea and Turkm ...
and a German company reached an agreement on using maglev trains to link the cities of Tehran
Tehran (; fa, تهران ) is the largest city in Tehran Province and the Capital city, capital of Iran. With a population of around 9 million in the city and around 16 million in the larger metropolitan area of Greater Tehran, Tehran is th ...
and Mashhad
Mashhad ( fa, مشهد, Mašhad ), also spelled Mashad, is the second-most-populous city in Iran, located in the relatively remote north-east of the country about from Tehran. It serves as the capital of Razavi Khorasan Province and has a po ...
. The agreement was signed at the Mashhad International Fair site between Iranian Ministry of Roads and Transportation and the German company. Munich-based Schlegel Consulting Engineers said they had signed the contract with the Iranian ministry of transport and the governor of Mashad. "We have been mandated to lead a German consortium in this project," a spokesman said. "We are in a preparatory phase." The next step will be to assemble a consortium, a process that is expected to take place "in the coming months," the spokesman said. The project could be worth between 10 billion and 12 billion euros, the Schlegel spokesman said. Siemens and ThyssenKrupp, the developers of a high-speed maglev train, called the Transrapid, both said they were unaware of the proposal. The Schlegel spokesman said Siemens and ThyssenKrupp were currently "not involved" in the consortium.
Switzerland
SwissRapide AG in co-operation with the SwissRapide Consortium is developing and promoting an above-ground magnetic levitation (Maglev) monorail system, based on the Transrapid technology. The first projects planned are the lines Bern – Zurich, Lausanne
Lausanne ( , , , ) ; it, Losanna; rm, Losanna. is the capital and largest city of the Swiss French speaking canton of Vaud. It is a hilly city situated on the shores of Lake Geneva, about halfway between the Jura Mountains and the Alps, and fac ...
– Geneva
Geneva ( ; french: Genève ) frp, Genèva ; german: link=no, Genf ; it, Ginevra ; rm, Genevra is the second-most populous city in Switzerland (after Zürich) and the most populous city of Romandy, the French-speaking part of Switzerland. Situ ...
as well as Zurich – Winterthur
, neighboring_municipalities = Brütten, Dinhard, Elsau, Hettlingen, Illnau-Effretikon, Kyburg, Lindau, Neftenbach, Oberembrach, Pfungen, Rickenbach, Schlatt, Seuzach, Wiesendangen, Zell
, twintowns = Hall in Tirol (Austri ...
.
Colorado I-70
Transrapid is one of a number of companies seeking to build a high speed transit system parallel to the I-70 Interstate in the US state of Colorado. Submissions put forward say that maglev offers significantly better performance than rail given the harsh climate and terrain. No technology has been preferred as of November 2013 with construction slated to begin in 2020.
Los Angeles to Las Vegas
The California–Nevada Interstate Maglev project is a proposed 269 mi (433 km) line from Las Vegas, Nevada to Anaheim, California. One segment would run from Las Vegas to Primm, Nevada, with proposed service to the Las Vegas area's forthcoming Ivanpah Valley Airport. The top speed would be 310 mph (500 km/h). In August 2014 the backers of the scheme were seeking to revive interest in it.
Other US
There have been several other evaluations conducted in the US including Washington DC to Baltimore, Chattanooga to Atlanta and Pittsburgh to Philadelphia. So far no project has started construction. See List of maglev train proposals:United States
Tenerife
A two line, 120-kilometers (75-mile) long system has been proposed for the island of Tenerife
Tenerife (; ; formerly spelled ''Teneriffe'') is the largest and most populous island of the Canary Islands. It is home to 43% of the total population of the Archipelago, archipelago. With a land area of and a population of 978,100 inhabitant ...
, which is visited by five million tourists per year. It would connect the island capital Santa Cruz in the north with Costa Adeje in the south and Los Realejos in the northwest with a maximum speed of 270 km/h (169 mph). The estimated cost is €3 billion. Transrapid has advantages over a conventional rail plans which would require 35% of its route in tunnels because of the steep terrain on the island.
Rejected systems
Germany
High-speed competition
The Transrapid originated as one of several competing concepts for new land-based high-speed public transportation developed in Germany. In this competition, the Transrapid primarily competed with the InterCityExpress (ICE), a high-speed rail system based on "traditional" railway technology. The ICE “won” in that it was adopted nationwide in Germany, however Transrapid development continued. A number of studies for possible Transrapid lines were conducted after the ICE had entered service, including a long-distance line from Hamburg to Berlin.
Munich link
The most recent German Transrapid line project, and the one that came closest to being built, having previously been approved, was an airport connection track from Munich Central Station
Munich ( ; german: München ; bar, Minga ) is the capital and most populous city of the German state of Bavaria. With a population of 1,558,395 inhabitants as of 31 July 2020, it is the third-largest city in Germany, after Berlin and Ha ...
to Munich Airport
Munich International Airport- Franz Josef Strauß (german: link=no, Flughafen München) is an international airport serving Munich and Upper Bavaria. It is the second-busiest airport in Germany in terms of passenger traffic after Frankfurt ...
, a project. The connection between the train station and airport was close to being built, but was cancelled on 27 March 2008, by the German government due to a massive overrun in costs. Prior to the cancellation, the governing party, the Christian Social Union of Bavaria (CSU), faced internal and local resistance, in particular from communities along the proposed route. The CSU had planned to position Transrapid as an example of future technology and innovation in Bavaria. German federal transport minister Wolfgang Tiefensee announced the decision after a crisis meeting in Berlin
Berlin is Capital of Germany, the capital and largest city of Germany, both by area and List of cities in Germany by population, by population. Its more than 3.85 million inhabitants make it the European Union's List of cities in the European U ...
at which industry representatives reportedly revealed that costs had risen from €1.85 billion to well over €3 billion ($4.7 billion). This rise in projected costs, however was mostly due to the cost estimates of the construction of the tunnel and related civil engineering after the designated operator Deutsche Bahn AG
The (; abbreviated as DB or DB AG) is the national railway company of Germany. Headquartered in the Bahntower in Berlin, it is a joint-stock company ( AG). The Federal Republic of Germany is its single shareholder.
describes itself as the se ...
shifted most of the risk-sharing towards its subcontractors - and not due to the cost of the maglev technology.
United Kingdom
The Transrapid was rejected in 2007 by the UK government for a maglev link between London and Glasgow
Glasgow ( ; sco, Glesca or ; gd, Glaschu ) is the most populous city in Scotland and the fourth-most populous city in the United Kingdom, as well as being the 27th largest city by population in Europe. In 2020, it had an estimated pop ...
, via Birmingham, Liverpool/Manchester, Leeds, Teesside, Newcastle and Edinburgh.
Incidents
September 2006 accident
On 22 September 2006, a Transrapid train collided with a maintenance vehicle at on the test track in Lathen, Germany. The maintenance vehicle destroyed the first section of the train, then lifted off the track to complete two full rotations before landing in a pile of pre-exploded debris. This was the first major accident involving a Transrapid train. The news media reported 23 fatalities and that several people were severely injured, these being the first fatalities on any maglev. The accident was caused by human error with the first train being allowed to leave the station before the maintenance vehicle had moved off the track. This situation could be avoided in a production environment by installing an automatic collision avoidance system.
SMT fire accident
On 11 August 2006, a Transrapid train running on the Shanghai Maglev Line caught fire. The fire was quickly put out by Shanghai's firemen. It was reported that the vehicle's on-board batteries may have caused the fire.
Alleged theft of Transrapid technology
In April 2006, new announcements by Chinese officials planning to cut maglev rail costs by a third stirred some strong comments by various German officials and more diplomatic statements of concern from Transrapid officials. Deutsche Welle reported that the ''China Daily
''China Daily'' () is an English-language daily newspaper owned by the Central Propaganda Department of the Chinese Communist Party.
Overview
''China Daily'' has the widest print circulation of any English-language newspaper in China. ...
'' had quoted the State Council encouraging engineers to "learn and absorb foreign advanced technologies while making further innovations." The Chinese deny any technology plagiarism. The China Aviation Industry Corporation has said the new Chinese "Zhui Feng" magnetic train is not dependent on foreign technology. It is much lighter than the Transrapid product, the company said, and features a much more advanced design.
Development history and versions
See also
* Aérotrain
* High-speed rail
High-speed rail (HSR) is a type of rail system that runs significantly faster than traditional rail, using an integrated system of specialised rolling stock and dedicated tracks. While there is no single standard that applies worldwide, line ...
– for an overview of competitors to this system
* JR-Maglev
The SCMaglev (superconducting maglev, formerly called the MLU) is a magnetic levitation (maglev) railway system developed by Central Japan Railway Company (JR Central) and the Railway Technical Research Institute.
On 21 April 2015, a manned sev ...
* Land speed record for railed vehicles
* Magnetic levitation train
Maglev (derived from ''magnetic levitation''), is a system of train transportation that uses two sets of electromagnets: one set to repel and push the train up off the track, and another set to move the elevated train ahead, taking advantage ...
References
External links
*
ThyssenKrupp Transrapid GmbH
Der Transrapid 08 in Lathen und seine Vorgänger
Comparison of wheel-rail technology and maglev technology
Transrapid timeline
Transrapid Photos China & GER, by International Maglev Board
Further Reading - Link to PDF Documents about Transrapid
{{Authority control
Electrodynamics
Emerging technologies
Experimental and prototype high-speed trains
High-speed trains of Germany
Land speed record rail vehicles
Maglev
Magnetic propulsion devices
Siemens products