HOME

TheInfoList



OR:

Tram İzmir, alternatively known as İzmir Tram (), is a tram network in
İzmir İzmir is the List of largest cities and towns in Turkey, third most populous city in Turkey, after Istanbul and Ankara. It is on the Aegean Sea, Aegean coast of Anatolia, and is the capital of İzmir Province. In 2024, the city of İzmir had ...
,
Turkey Turkey, officially the Republic of Türkiye, is a country mainly located in Anatolia in West Asia, with a relatively small part called East Thrace in Southeast Europe. It borders the Black Sea to the north; Georgia (country), Georgia, Armen ...
. Owned by the
İzmir Metropolitan Municipality İzmir is the List of largest cities and towns in Turkey, third most populous city in Turkey, after Istanbul and Ankara. It is on the Aegean Sea, Aegean coast of Anatolia, and is the capital of İzmir Province. In 2024, the city of İzmir had ...
and operated by İzmir Metro A.Ş., the system consists of three lines: one in Karşıyaka, which opened on 11 April 2017, one in Konak, which opened on 24 March 2018 and one in Çiğli, which opened on 27 January 2024. The operating length is and consists of a total 47 stations. The total cost of these two lines is about ₺450 million (approx. US$120 million).


History

The first tram line in İzmir opened in 1890, between
Alsancak Terminal Alsancak railway station () is one of the two main railway terminals in İzmir and is the second-oldest railway station in Turkey, after Kemer, being completed in 1858.Ömer Tolga Sümerli
- The history of Alsancak terminal.
The Alsancak-Pasaport portion was abandoned in 1956 and the last remaining line in İzmir (Konak-Pasaport) was taken up in the early 1960s. Automobile traffic rose greatly in the decades that followed and in the early 2000s, the city was plagued with congestion in central areas. In 2009, the Metropolitan Municipality released an overall transportation plan for the city. The plan included the construction of three new tram lines: one in Konak, Karşıyaka and in Buca respectively. These three lines were to be integrated with the city's metro line as well as the two commuter rail lines. Construction was originally expected to start by the end of 2011; however, due to the delayed Environmental Impact Report, this date was pushed back to 2015. In 2013, the Municipality secured necessary funding from the Ministry of Development and finalized system plans in 2014. In the finalized plan, the Buca Tram line was removed due to pressure from the Ministry of Transport. Construction began in April 2015 on the Karşıyaka Tram, and in November 2015 on the Konak Tram. The first tram vehicles were delivered in 2016 and showcased at the İzmir International Fair in August of the same year. The rest of the vehicles were delivered in February 2017. The general name of the system was branded ''Tram İzmir'' by the Metropolitan Municipality.


T1 Karşıyaka Tram Line

The
Karşıyaka Tram Karşıyaka () is a municipality and Districts of Turkey, district of İzmir Province, Turkey. Its area is 51 km2, and its population is 346,264 (2022). The district extends for twelve kilometres along the northern and eastern coastline of th ...
is long. The tram line is operating with 2 lines. The Alaybey – Ataşehir Kavşağı line is named the Green Line, and the Mavişehir – Ataşehir line is named the Orange Line.


T2 Konak Tram Line

The Konak Tram is long. The line serves 19 stations and began operating on 24 April 2018. The entire line is double track. The Halkapinar and Fahrettin Altay bound tracks run on opposite sides of the Mustafa Kemal Sahil Boulevard from Fahrettin Altay station to Sadık Bey Station. Then after Sadık Bey, the two lines run parallel to each other, between the seaside and the west-bound Mustafa Kemal Sahil Boulevard. The Tramline turns inland at Gazi Boulevard and the track runs through the median. The line then turns onto Şair Eşref Boulevard, where the tracks are laid on the left most lane of each direction. The lines split past the Alsancak Train Station with the Halkapınar bound line taking Şehitler Street and the Fahrettin Altay bound track following Liman Street. The lines meet up again along Şehitler Street just before arriving at Halkapınar.


T3 Çiğli Tram Line (Ring)

The Çiğli Tram is long and serves 14 stations. The tram line is operating with 2 lines. The Red (Outer) Line, and the Blue (Inner) Line. The line opened on 27 January, 2024


Service

The system operates 24/7 with a varying
headway Headway is the distance or duration between vehicles in a transit system. The ''minimum headway'' is the shortest such distance or time achievable by a system without a reduction in the speed of vehicles. The precise definition varies depending on ...
. On the Karşıyaka and Çiğli line, there is a ten-minute headway. On the Konak line, during Monday through Saturday, there is a six/seven and a half-minute headway and during Sunday, there is a seven and a half/ten-minute headway. In 2018, İzmir Tram transported 110,000 passengers per day.


Future Developments

A new line from Yeni Girne to Örnekköy is in its tender phase. Construction is set to begin in early 2024.


Infrastructure

The system operates on its own right of way as well as automobile lanes, despite the latter utilized less so, and is electrified with 750 V DC
overhead wire An overhead line or overhead wire is an electrical cable that is used to transmit electrical energy to electric locomotives, electric multiple units, trolleybuses or trams. The generic term used by the International Union of Railways for the te ...
and consists of
Communications-based train control Communications-based train control (CBTC) is a railway signaling system that uses telecommunications between the train and track equipment for traffic management and infrastructure control. CBTC allows a train's position to be known more accura ...
(CBTC) signalling. Most of the network is double-tracked, except for a short portion between Karşıyaka pier and Alaybey. The tracks are standard
track gauge In rail transport, track gauge is the distance between the two rails of a railway track. All vehicles on a rail network must have Wheelset (rail transport), wheelsets that are compatible with the track gauge. Since many different track gauges ...
at 1,435 mm (4 ft 8 12 in).Both lines will have their own storage and maintenance depots, in Mavişehir and Halkapınar respectively. The tramcars are produced by
Hyundai Rotem Hyundai Rotem Company, often referred to as Hyundai Rotem (), is a South Korean manufacturer of railway rolling stock, railway signalling, defense products and plant equipment. It is a member of Hyundai Motor Group and has presence in more than ...
plant in
Adapazarı Adapazarı () is a municipality and the capital Districts of Turkey, district of Sakarya Province, Turkey. Its area is 324 km2, and its population 281,489 (2022). It covers the central and northern part of the agglomeration of Adapazarı and t ...
. The double-ended 32 m (105 ft)-long five-module tramcars are each 43.1 t heavy. They have 48 seating capacity, and can carry up to 285 passengers each. Service speed is 24 km/h (15 mph), and top speed is 70 km/h (43 mph). Each station is wheelchair-accessible and consists of its own platform, segregated from any sidewalk or street. Information panels showing the real-time status of the next tram are installed in all operating stations.


See also

* Transport in Izmir * Rail Transport in Izmir * Izmir Metro * Trams in Izmir


References

{{Urban public transport in Turkey Tram transport in İzmir Railway lines opened in 2017 Railway lines opened in 2018 2017 establishments in Turkey 2018 establishments in Turkey Karşıyaka District Konak District