The Tailem Bend Solar Power Farm is a solar power farm near
Tailem Bend Tailem Bend (locally, "Tailem") is a rural town in South Australia, south-east of the state capital of Adelaide. It is located on the lower reaches of the River Murray, near where the river flows into Lake Alexandrina. It is linear in layout s ...
in
South Australia South Australia (commonly abbreviated as SA) is a state in the southern central part of Australia. It covers some of the most arid parts of the country. With a total land area of , it is the fourth-largest of Australia's states and territories ...
. It has 108MW of generation capacity but is limited to supplying 95MW to the national grid. An additional 85MW is proposed in stage 2. It is developed and owned by Singapore-based Vena Energy, a new name for the former Equis Energy following acquisition by
Global Infrastructure Partners Global Infrastructure Partners (GIP) is an infrastructure investment fund making equity and selected debt investments. GIP's main headquarters are located in New York City and its equity investments are based on infrastructure assets in the energ ...
in January 2018. The output will be sold to
Snowy Hydro Snowy Hydro Limited is an electricity generation and retailing company in Australia that owns, manages, and maintains the Snowy Mountains Hydro-electric Scheme which consists of nine hydro-electric power stations and sixteen large dams connecte ...
for retail sale under its
Lumo Energy Lumo Energy is an Australian energy retailer operating in Victoria and South Australia, which has been wholly owned by Snowy Hydro since 2014. The business offers electricity and gas packages in Victoria and South Australia. As of October 2017 ...
brand. Stage 2 is also expected to provide battery storage. The solar farm covers of land with more than 390,000 photovoltaic solar panels. The panels are mounted on fixed-angle racks. The site is a joint development between Equis and Snowy Hydro. Snowy Hydro also had plans to establish a 28MW diesel generator at the site. UGL was contracted in February 2018 to build the first stage, which was expected to be connected to the power grid in the first quarter of 2019. A second stage to generate an additional 111MW is also being planned. The Tailem Bend solar farm received its generation licence on 30 January 2019, and was expected to start commissioning in February, with full production from mid-April. Its theoretical capacity is 108MW, but the licence limits it to 95MW to ensure it can deliver
reactive power Reactive may refer to: *Generally, capable of having a reaction (disambiguation) *An adjective abbreviation denoting a bowling ball coverstock made of reactive resin * Reactivity (chemistry) * Reactive mind * Reactive programming See also * Rea ...
to the grid. The 95MW Tailem Bend solar farm began production on 4 March 2019 and officially opened on 30 May 2019. Vena Energy expects to proceed with the completion of stage two of the Tailem Bend solar farm, which will be similar in scale to the first stage. Vena Energy also has plans for a Tailem Bend Battery Energy Storage Project. The plan for a nearby diesel generator has been dropped.


References

Energy infrastructure completed in 2019 Solar power stations in South Australia 2019 establishments in Australia {{Australia-powerstation-stub