History
The first TT-400TP was constructed in 2009, following by sea trials in 2011. The second TT-400TP ship, known as 274, was handed over on May 28, 2014. The 3rd and 4th TT-400TP ships, known as 272 and 273, were commissioned on October 25, 2014. As of May 2017, 6 TT-400TPs are known to be in service. In 2015, Asia Times reported rumors that the Philippines was potentially willing to purchase TT-400TP ships. As of 2023, the Vietnamese navy has six TT-400TPs in service.Design
''TT-400TP'' class ships have gun control automatic weapons on the sea with four tasks: destroying hostile amphibious ships and corvettes of the enemy and protecting the base of the amphibious fleet and fleet escort in the operation of ships in service forces and forces scan mines, protection of civilian ships at sea and tactical reconnaissance planes of the water. Z173 shipyard engineers were involved in the construction after being trained abroad. Its speed is 32 nautical miles per hour and it can operate on sea for 30 days. It has a length of 54.16m, a width of 9.16m and a full load displacement of 480 tons. The ship is equipped withShips
References
External links
* {{in lang, vi Ships of the Vietnam People's Navy