HOME

TheInfoList



OR:

The Southeast Gateway Line (formerly the West Santa Ana Branch Transit Corridor) is a planned
light rail Light rail (or light rail transit, abbreviated to LRT) is a form of passenger urban rail transit that uses rolling stock derived from tram technology National Conference of the Transportation Research Board while also having some features from ...
line, mostly following the
Pacific Electric The Pacific Electric Railway Company, nicknamed the Red Cars, was a privately owned Public transport, mass transit system in Southern California consisting of electrically powered streetcars, interurban cars, and buses and was the largest electr ...
's historic West Santa Ana Branch, connecting
Downtown Los Angeles Downtown Los Angeles (DTLA) is the central business district of the city of Los Angeles. It is part of the Central Los Angeles region and covers a area. As of 2020, it contains over 500,000 jobs and has a population of roughly 85,000 residents ...
to the city of Artesia, along with other cities in southeastern Los Angeles County.


Overview

The
Los Angeles County Metropolitan Transportation Authority The Los Angeles County Metropolitan Transportation Authority (LACMTA), branded as Metro, is the county agency that plans, operates, and coordinates funding for most of the Transportation in Los Angeles, public transportation system in Los Ang ...
(Metro) has $4 billion in funds available for construction planned to begin in 2022. The plan included in the
Measure M Measure R was a ballot measure during the November 2008 elections in Los Angeles County, California, that proposed a half-cent sales taxes increase on each dollar of taxable sales (originating in or made from Los Angeles County) for thirty years ...
transportation funding measure is to build improvements in two stages. In June 2017, Metro issued a request for proposal (RFP) to study alternatives for this new line. Metro has narrowed the options to two alternatives and are currently preparing to publish the Draft EIS/EIR for public comment. The draft EIS/EIR is planned to be released in 2020. The project's timeline was expected to be accelerated under the Twenty-eight by '28 initiative. The environmental impact report released in 2021 set an estimated cost of $8.6 billion for the line. The City of Cerritos filed a lawsuit to force Metro to alter the planned route through that city. Under the plan, the new light rail will travel over 1.3 miles (2.09 km) within the city limits with three street crossings between I-605 and the proposed Pioneer station. Metro proposes in Cerritos, at 183rd and Gridley Street, a crossing shared with the City of Artesia, a $687 million dollar above ground bridge crossing. Cerritos prefers a $1.1 billion dollar underground rail options within its limits. Metro has stated a budget difference of $413 million in additional tax payer funds is not needed. By 2023, the Metro board sought to change the project's name to reflect that it would not reach Santa Ana or Orange County. The $8.5 billion project has been in the planning stage for two decades. Metro estimates it will take 10 years to build, starting in 2025 and opening in 2035. On January 22, 2024, the line's new name was announced by Los Angeles County Supervisor
Janice Hahn Janice Kay Hahn (born March 30, 1952) is an American politician serving as a member of the Los Angeles County Board of Supervisors from the 4th district since 2016. A member of the Democratic Party, she was a U.S. Representative from California ...
to be the Southeast Gateway Line. On March 29, 2024, Metro publicly published the final environmental impact report (EIR) for the project, pending certification by the Metro board of directors. The FTA is expected to issue a record of decision to happen sometime during the summer of 2024. The board voted to certify the EIR at a meeting on April 25, 2024, paving the way for construction to begin by the end of 2024. Metro released an RFP right after the certification, seeking a contractor for pre-construction "Advanced Works". In October 2024, the California State Transportation Agency (CalSTA) awarded Metro $231 million for construction on the Southeast Gateway Line as part of the $1.3 billion Transit and Intercity Rail Capital Program Cycle 7. Groundbreaking on advance utility relocation began on October 31, 2024.


Proposed routings and modes

The Southeast Gateway Line is proposed as a light rail transit line that would connect downtown Los Angeles to Artesia. Along the route, it would also serve the communities of Vernon,
Huntington Park Huntington Park is a city located in the South Central region of Los Angeles County, California, United States. The area includes the separate communities of Florence, California, Florence, Firestone Park, California, Firestone Park, Graham, ...
,
Bell A bell /ˈbɛl/ () is a directly struck idiophone percussion instrument. Most bells have the shape of a hollow cup that when struck vibrates in a single strong strike tone, with its sides forming an efficient resonator. The strike may be m ...
, Cudahy, South Gate, Downey,
Paramount Paramount (from the word ''paramount'' meaning "above all others") may refer to: Entertainment and music companies * Paramount Global, also known simply as Paramount, an American mass media company formerly known as ViacomCBS. **Paramount Picture ...
, Bellflower and Cerritos in the southeast area of the county. The southern portion route, east and south of Slauson, leaves the A Line corridor via the former Pacific Electric Whittier Line, continues south on a former
Union Pacific Railroad The Union Pacific Railroad is a Railroad classes, Class I freight-hauling railroad that operates 8,300 locomotives over routes in 23 U.S. states west of Chicago and New Orleans. Union Pacific is the second largest railroad in the United Stat ...
line (Florence/Salt Lake to Paramount/Rosecrans), and then transitions to the old Santa Ana right of way (south of Paramount/Rosecrans). These corridors are owned by the Ports of Los Angeles/Long Beach and Metro, requiring minimal property acquisition. The northern alignment through Downtown Los Angeles is being studied as a possible underground light rail transit route. Six options were proposed. , two options were being considered (both of which would connect to the southern alignment by paralleling the A Line between and stations, as well as part of an existing freight rail line along Randolph Street): *Alameda Street (Alternative E): A subway under Alameda, passing through the Arts District and connecting to the A and E lines at before continuing to . *Downtown Transit Core (Alternative G): Would deviate westward from the Alameda route in the Arts District and continue downtown via a subway, terminating at either or station. By March 2018, Cerritos had opted out of the project, leaving the southern terminus at Pioneer. In November 2018, Metro removed the A Line stations north of Slauson from the study area, citing redundant service and expedited travel times as the prime reasons. In 2019, Metro announced that as part of its design analysis, it would study opening the line in two stages, with the initial opening $1 billion segment running from Pioneer Station in Artesia north to Slauson Station on the A Line, with the remainder of the $3 billion route into downtown built as Phase 2. Metro staff were "optimistic" that it would be feasible to build the line to Slauson by 2028 with existing Measure M funds. Metro was also studying
public–private partnership A public–private partnership (PPP, 3P, or P3) is a long-term arrangement between a government and private sectors, private sector institutions.Hodge, G. A and Greve, C. (2007), Public–Private Partnerships: An International Performance Revie ...
s that could accelerate the construction schedule of the entire line. The service is not planned to interline with the A Line to 7th Street/Metro Center due to operational constraints.


Route Selection: Alternative E

By 2022, the Metro Board backed the Union Station option as the northern terminus. Construction on the segment south of Slauson is expected to begin construction in 2025 with an estimated opening of 2035. The second phase north of Slauson to Union Station is expected to be completed in 2043 at the earliest.


Stations


Proposed extension into Orange County

Metro is evaluating an optional station in Cerritos at Bloomfield Avenue (just north of the Los Angeles-Orange county line) to facilitate a possible future extension into Orange County; it would eventually connect to the under-construction OC Streetcar, which also uses part of the Pacific Electric WSAB right-of-way.


Proposed Rio Hondo confluence station

Metro is evaluating an optional station in South Gate at the confluence of the
Los Angeles River The Los Angeles River (), historically known as by the Tongva and the by the Spanish, is a major river in Los Angeles County, California. Its headwaters are in the Simi Hills and Santa Susana Mountains, and it flows nearly from Canoga Park ...
and Rio Hondo to connect with future planned development in the surrounding area.


References


External links


Measure R

Southeast Gateway Line
{{Los Angeles County Metropolitan Transportation Authority Transportation in Los Angeles Los Angeles County Metropolitan Transportation Authority Public transportation in Los Angeles Public transportation in Los Angeles County, California Proposed railway lines in California 2035 in rail transport Los Angeles Metro Rail projects