Konza Technopolis, also known as Silicon Savannah, is a large technology hub being built 64 km (39 mi) south of
Nairobi Nairobi is the Capital city, capital and largest city of Kenya. The city lies in the south-central part of Kenya, at an elevation of . The name is derived from the Maasai language, Maasai phrase , which translates to 'place of cool waters', a ...
. Its location spreads across the three counties of
Machakos Machakos, also called Masaku, is a town in Machakos County, Kenya. Serving as the capital of the county, its urban population was 63,767 as of 2019. History Machakos was established in 1887 by Sakshi Shah, ten years before Nairobi. Machakos ...
, Makueni and
Kajiado Kajiado is a town in Kajiado County, Kenya. The town is located south of Nairobi, along the Nairobi – Arusha highway ( A104 road). Kajiado has an urban population of 24,678 (2019 census). Local people are predominantly of the Maasai tribe. ...
. It is a gazetted Special Economic Zone. Konza hosted the 41st International Association of Science Parks (IASP) conference from 25-27 September 2024.


Planning

Konza Technopolis is a
smart city A smart city is an urban area that uses digital technology to collect data and operate services. Data is collected from citizens, devices, buildings, or cameras. Applications include traffic and transportation systems, power plants, utilities ...
flagship project and a key component of Kenya's Vision 2030, that is positioned within the Economic and Macro Pillar under the business process outsourcing sector and related IT-enabled services (ITES). Through fostering a supportive environment that leverages information and communication technology (ICT), the technopolis is being modelled into a smart city meant to drive social and economic development.


Design team

The Expression of Interest for this assignment attracted 22 firm responses, narrowed to 6 in a shortlist. The Ministry and IFC selected the team led by HR&A Advisors, Inc. of New York City leading an international team: *HR&A Advisors, Inc.; A real estate and economic development advisory firm specialising in large-scale master plan implementation. *
SHoP Architects SHoP Architects is an architecture firm in Lower Manhattan, New York City, with projects located on five continents. Led by four principals, the firm provides services to residences, commercial buildings, schools and cultural institutions, as we ...
: An architecture and planning firm creating the conceptual design for the sales pavilion and the urban design for Phase 1. *Center for Urban and Regional Planning: A Nairobi-based physical planning firm preparing the Local Physical Development Plan for Konza *OZ Architecture: A design firm providing sustainability strategies for Konza *
Tetra Tech Tetra Tech, Inc. is an American consulting and engineering services firm based in Pasadena, California. The company provides consulting, engineering, program management, and construction management services in the areas of water, environment, inf ...
: An international engineering services firm developing the infrastructure concepts for Konza *
Dar Al-Handasah Dar Al-Handasah Consultants (Shair and Partners; ) is a privately owned international consulting company active in engineering, architecture, planning, environmental consulting, project and construction management, facilities management, and econ ...
: An International engineering services firm carrying out the Construction supervision services * WPP-Scangroup and
Hill & Knowlton Hill & Knowlton is an American global public relations consulting company, headquartered in New York City. The firm has over 80 additional offices in more than 40 countries. The company was founded in Cleveland, in 1927 by John W. Hill and is no ...
provided branding and communication services. *HP-Gauff Ingenieure was contracted for local engineering services.


Master Delivery Partner 1 plan

The
Ministry of Information and Communications A Communications Ministry or Department of Communications is a ministry or other government agency charged with communication. Communications responsibilities include regulating telecommunications, postal services, broadcasting and print media. The ...
and the
International Finance Corporation The International Finance Corporation (IFC) is an international financial institution headquartered in Washington, D.C. and a member of the World Bank Group that offers investment, advisory, and asset-management services to encourage private ...
(IFC) engaged Master Delivery Partner 1 (MDP1) to prepare a detailed business plan and master plan for Phase 1 in July 2012. The initial feasibility and concept master plan was prepared jointly by
Deloitte Deloitte is a multinational professional services network based in London, United Kingdom. It is the largest professional services network in the world by revenue and number of employees, and is one of the Big Four accounting firms, along wi ...
and Pell Frischmann, a UK-based design consultancy and funded by the IFC. At that stage, the project brief was limited to a
technology park A science park (also called a "university research park", "technology park", "technopark", "technopolis", "technopole", or a "science and technology park" TP is defined as being a property-based development that accommodates and fosters th ...
of with BPO/ IT businesses at its core. During the feasibility study, Pell Frischmann proposed Konza Technology City to make the technology park a more viable destination. The Kenyan government agreed and commissioned a new master plan for a city of that was completed by Pell Frischmann. The land on which Konza was to be built was acquired from Malili Ranch Limited for 1 billion Kenyan shillings, a deal that has since then been filled with controversy, evidenced by ongoing court cases. Konza Technopolis was approved by the Parliament Account Committee and endorsed by the Kenyan Government.


Administration

The study also recommended the creation of a management board to enhance the development of Konza. The government set up the Konza Technolopolis Development Authority (KoTDA), whose Board of Directors was appointed in 2013 and is currently overseeing the development of infrastructure for Phase 1 of Konza. The initial board, appointed by the then Information Minister,
Samuel Poghisio Samuel Losuron Poghisio is a Kenyan politician who served as the Majority Leader of the Kenyan Senate. He belongs to the Kenya African National Union - KANU and was previously a member of the United Republican Party - URP and the Orange Democ ...
, consisted of economist Haron Nyakundi (then-chairman of the Quantity Surveyors Chapter of the
Architectural Association of Kenya The Architectural Association of Kenya (AAK) is a corporate body for professionals in the built and natural environments in Kenya. It draws its membership from eight major disciplines: *Architects (Arch.) *Quantity Surveyors (QS) *Town Planners (Pla ...
), architects Reuben Mutiso and Emma Miloyo (then-deputy president of the Architectural Society of Kenya), Rosemary Maundu, and investment banker John Ngumi. The first CEO of the KoTDA was Catherine Adeya-Weya, who later on resigned. She was succeeded by John Kipchumba Tanui in 2015. The current CEO Is John Paul Okwiri.


Construction

The groundbreaking for construction at Konza was done in January 2013 by President
Mwai Kibaki Emilio Stanley Mwai Kibaki (15 November 1931 – 21 April 2022) was a Kenyan politician who served as the third President of Kenya from December 2002 until April 2013. He served in various leadership positions in Kenya's government including ...
. Thereafter, the project took a slower turn after the end of President Kibaki's tenure, with people casting doubts on whether the flagship project would be actualized. This was triggered by the fact that several years later, no notable construction had been done on the land. The technopolis is currently being built in different phases:


Phase One

This phase had an initial 5 year development period and overall completion in 2020. This phase took of late due to funding constraints. The proposal was to develop 410 acres out of the 5000 acres of land owned for this purpose. It would be built to have a university, residential area, parks, office space, and life science facilities. Upon completion, Phase one was intended to create at least 16,000 jobs.


Horizontal infrastructure

This 170-hectare phase involved the development of essential infrastructure, including 40 kilometers of paved, landscaped roads with stormwater drainage and sewage systems, a water treatment plant and reservoir, power and telecom networks, public spaces, a welcome centre, a safety complex (police and fire stations), utility tunnels, a waste facility, and a transit hub. An agreement between the Kenyan government and an Italian firm in June 2017 kicked off the process of construction of Phase one, with an estimated cost of $391 million (Ksh 50.4 Billion). The financing agreement was between the government and UniCredit SpA of Italy, for the horizontal infrastructure through the Engineering, Procurement, Construction and Financing (EPCF) model. The contract was awarded to Impresa Construzioni Maltauro (ICM) Group, Italy. The construction was completed in 2022.


Konza Complex Office Block

The Konza Complex that houses the headquarters and other offices was completed in 2019. The nine-storey office block hosts the Konza Technopolis headquarters. This was the first phase of the project. The Open University of Kenya is also hosted here. In September 2024,
Donghua University Donghua University (DHU, ) is a public university in Shanghai, China. It is affiliated with the Ministry of Education. The university is part of the Double First-Class Construction and Project 211. Formerly known as China Textile Universit ...
and Open University of China signed a memorandum of understanding with Open University of Kenya to strengthen collaboration in digital education. Thereafter, the China-Africa digital learning center was launched in February 2025 at the Open University of Kenya. The second phase of the project will comprise a five-star hotel and a conference facility.


National Data Centre

In 2019,
Huawei Huawei Technologies Co., Ltd. ("Huawei" sometimes stylized as "HUAWEI"; ; zh, c=华为, p= ) is a Chinese multinational corporationtechnology company in Longgang, Shenzhen, Longgang, Shenzhen, Guangdong. Its main product lines include teleco ...
committed to building a National Cloud data center, smart ICT city and traffic and surveillance project and a Government Cloud service at Konza worth Ksh17.5 billion which was funded with Chinese concessional loans. By 2020, the first phase, i.e., construction of a containerized National Data Centre, was completed. The second phase, a Tier III National Data Center with Smart City facilities and services to support Konza Technopolis, e-government as well as the Small and Medium Enterprises Services, was completed by 2021.


Kenya Advanced Institute of Science and Technology (KAIST)

The Kenya Advanced Institute of Science and Technology (KAIST) is being built on 36 acre parcel in Konza, at a cost of Ksh 13 Billion, part of which is provided by the South Korean government (Ksh 8Billion) and the remaining provided by the Kenyan government. It is modeled on South Korea's Advanced Institute of Science and Technology. The project contractor is BOMI Engineering and Construction Consortium. It is intended to advance STEM Courses and enhance the number of specialists in Kenya. It was planned to admit its first Master's and Doctoral students in 2023. The cabinet, on March 11th 2025, approved the institution as a specialised post degree awarding institution of strategic national importance.As of 2025, the first phase of its construction was complete. Phase two will include the setup of labs, hiring faculty and an academic launch in 2026.


Konza Technopolis Security Command Centre

The groundbreaking was presided over by ministers, Joe Mucheru of ICT and Fred Matiang'i of Interior in 2021. The project features the construction of a Police Station, security barrier, entrance feature, fire station, emergency response unit and an emergency response centre.


Phase Two

The first phase of the EIPP projects, laid the foundation for the technopolis's development. Key initiatives undertaken during this phase included the formulation of the Konza Technopolis Smart City master plan, a feasibility study focused on the Integrated Operations Centre with an emphasis on security operations, and the establishment of an intelligent transport system and
smart mobility Smart mobility refers to many modes of transport. Some smart mobility services include: * public transport (with real-time timetabling and route optimization, seamless travel and digital ticketing) * Carsharing * Mobility as a service (MaaS) * Mo ...
basic plan. The second phase involves a preliminary feasibility study for an intelligent transport system and integrated control centre,, the establishment of a startup ecosystem implementation plan for Konza, consultation for the implementation of smart
logistics Logistics is the part of supply chain management that deals with the efficient forward and reverse flow of goods, services, and related information from the point of origin to the Consumption (economics), point of consumption according to the ...
in Konza (such as smart parking,
digital signage Digital signage is a segment of electronic signage that uses Electronic visual display, digital display technologies to present multimedia content in both public and private environments. Content may include video, images, text, or interactive me ...
, and
electric vehicle An electric vehicle (EV) is a motor vehicle whose propulsion is powered fully or mostly by electricity. EVs encompass a wide range of transportation modes, including road vehicle, road and rail vehicles, electric boats and Submersible, submer ...
services), and the establishment of a master plan for the development of the Konza-Nairobi Corridor Transport Network. The Korea Trade-Investment and Promotion Agency and the Konza Technopolis Development Authority are implementing the projects on behalf of the two governments. In 2024, KoTDA, along with the Korea Trade-Investment Promotion Agency (KOTRA) launched the 3rd Year of EIPP that focuses on establishing essential infrastructure, including an incubation complex, smart farm, and diverse energy sources, aligning with Konza’s green transition and energy independence goals. Notable milestones will include industrial clusters, smart city development, and the Konza Digital Media City. The Konza-Nairobi Corridor Transport Network road construction, specifically the Machakos turnoff to Emali is expected to beign in 2025. Kenya also signed an MoU with the Korea Electronic Association to establish a $1.4 million electronics and information technology manufacturing support centre at Konza. The project, valued at 180 million Kenyan shillings, will unfold in four phases over 2-3 years.


Economic Innovation Partnership Program (EIPP) with South Korea

The Korea-Kenya EIPP project started in 2021 and went through a consultation process between the two countries. EIPP is a new and extended cooperation model of the KSP (Knowledge Sharing Program) of Korea to foster mutually beneficial relationships between South Korea and partner countries.


= Digital media city

= At the sideline of the Korea–Africa summit in 2024, South Korea and the Kenyan government entered into a financing agreement with the Government of South Korea to establish a
digital media In mass communication, digital media is any media (communication), communication media that operates in conjunction with various encoded machine-readable data formats. Digital content can be created, viewed, distributed, modified, listened to, an ...
city. The Digital Media City (DMC) project, which is a city within, will sit on 65 hectares. The Digital Media City will give support to Kenya’s creative sector in providing shared state-of-the-art infrastructure for content creators and digital innovators.


Smart Vaccine Facility Project (SVFP)

In October 2024, a delegation from South Korea, including SK Bioscience, conducted a feasibility study for the potential establishment of a smart vaccine manufacturing facility in Kenya. As part of the study, they visited Konza Technopolis. Konza technopolis continues to attract more Korean companies.


Investments

By the end of the 2022–23
fiscal year A fiscal year (also known as a financial year, or sometimes budget year) is used in government accounting, which varies between countries, and for budget purposes. It is also used for financial reporting by businesses and other organizations. La ...
, at least 75% of the parcels at Konza Technopolis had been committed by investors. Some of the investors include
Riara University Riara University is a Private University located along Mbagathi Way in Nairobi, Kenya. Location The university's main campus is just next to Nyayo Highrise Estate in Kibera, Nairobi County, a fifteen minutes drive from Nairobi Central Busines ...
, the Africa Center for Technology Studies, the National Construction Authority, and the National Housing Corporation. On February 2025, the government gave an ultimatum urging investors to start developing their plots. The government is pushing for rapid development of the area.


See also

*
iHub iHub is an Innovation hub and hacker space for the technology community in Nairobi. It was started in March 2010 by Erik Hersman, a blogger, TED fellow, and entrepreneur and acquired by Co-creation Hub (CcHUB) in 2019. This coworking space, ...
* NaiLab * Silicon Savannah * Kigali Innovation City


References