Shuixi Station
   HOME

TheInfoList



OR:

Shuixi station ( zh, s=水西站, t=水西站, p=Shuìxī Zhàn, j=seoi2sai1 zaam6), is an
interchange station An interchange station or a transfer station is a train station for more than one railway route in a public transport system that allows passengers to change from one route to another, often without having to leave a station or pay an additional ...
between Line 7 and Line 21 of the
Guangzhou Metro The Guangzhou Metro ( zh, s=广州地铁, labels=no) is the rapid transit system of the city of Guangzhou in the Guangdong Province of China. It is operated by the state-owned Guangzhou Metro Corporation and was the fourth metro system to be b ...
. Line 21 opened on 20 December 2019., whilst Line 7 opened on 28 December 2023.


History

Shuixi Station was originally planned as the northern terminus of Line 4. At the end of 2010, the northern extension of the original Line 4 (Huangcun-Shuixi) was singled out and extended to both ends to become Line 21. In order to cooperate with the express positioning of Line 21, this station was cancelled for a time; Later, the setting was resumed during the EIA stage, and construction was finally implemented. In 2016, the second phase of Plan 7 was extended to Shuixi Station as the terminal station, and then further extended to Shuixibei Station (now ). Line 21 was not initially scheduled have a transfer with Line 7, but at the end of 2016, the station design was changed to include a reserved transfer point with Line 7. On 30 April 2019, the transfer to the '3 Powers' was completed on Line 21 of this station; On 20 December of the same year, the station was opened with the opening of the remaining section of Line 21. In order to coincide with the upcoming opening of the second phase of Line 7, the express train of Line 21 will stops at this station from 29 August 2023. In October 2023, the transfer to the '3 Powers' was completed at the Line 7 station. On 28 December 2023, the station part of Line 7 was officially opened with the opening of the second phase of Line 7, and the station became a transfer station.


Layout

The Line 21 station has an underground
island platform An island platform (also center platform (American English) or centre platform (British English)) is a station layout arrangement where a single platform is positioned between two tracks within a railway station, tram stop or transitway inte ...
, along with 2 bypass tracks next to the stopping tracks. The Line 7 station has a separate
island platform An island platform (also center platform (American English) or centre platform (British English)) is a station layout arrangement where a single platform is positioned between two tracks within a railway station, tram stop or transitway inte ...
underneath Line 21. There are 6 exits, lettered A, B, C, D, E and F. Exits A, C and F are accessible. Exits A, B and D are located on Shuixi Road, and exits C, E and F are located on Luosuizhi Street. Exit A provides interchange with Huangpu Tram Line 1 (
THP1 Guangzhou Huangpu Tram Line 1 () is a tram line serving the Huangpu District, Guangzhou, Huangpu District of Guangzhou. The initial section opened on 1 July 2020. The remaining section opened on 28 December 2020. It is in length with 20 station ...
).


Gallery

Concourse of L7, Shuixi Station, Guangzhou Metro 20231230-A.jpg, Line 7 concourse Platform 1, Shuixi Station, Guangzhou Metro 20231230.jpg, Line 7 platform Shuixi Station Concourse.jpg, Line 21 concourse


References


External links

{{Guangzhou Metro , line7=yes , line21=yes Railway stations in China opened in 2019 Guangzhou Metro stations in Huangpu District