History
Name changes
Transfers
Rolling stock
The line is served by the Nadzaladevi (No.1) and Gldani depot (No.2), currently 9 four carriage trains are assigned to it. All are the 81-714/717 versions with .5 and .5M modificationsRecent developments and future plans
The line is extending to the west and some of the construction sites that have been derelict since Soviet times have recently been restarted. Construction of the State University station (Sakhelmtsipo Universiteti), which dates back to the Soviet era and was suspended for 22 years, was restarted in July 2015 and was completed in October 2017. In perspective the line might continue to the east.External links
References
Tbilisi Metro Railway lines opened in 1979 {{Georgia-transport-stub