Rupsha Railway Bridge is a railway bridge on Rupsha River under construction. This bridge will connect
Khulna Khulna ( bn, খুলনা, ) is the third-largest city in Bangladesh, after Dhaka and Chittagong. It is the administrative centre of Khulna District and Khulna Division. Khulna's economy is the third-largest in Bangladesh, contributing $53 b ...
with Port of Mongla by railway network. Bangladesh Railway and Indian
Larsen & Toubro Limited Larsen & Toubro Ltd, commonly known as L&T, is an Indian multinational conglomerate company, with business interests in engineering, construction, manufacturing, technology, information technology and financial services, headquartered in Mumba ...
signed an agreement to construct the bridge. The bridge will be long.


Project details

Khulna-Mongla Railway Project was passed by
ECNEC The Executive Committee of the National Economic Council (ECNEC) is an executive committee under the Cabinet Division The Cabinet Division ( bn, মন্ত্রিপরিষদ বিভাগ) is the executive office of the Prime Minister ...
on 21 December 2010. This project is divided into three parts. First one is to construct the railway, second one is to build a bridge over Rupsha and third one is to construct the signaling system. Estimated cost of this project is 1,076.445 crore taka. The bridge has 7 nos. of 102.4m long Double Warren Open-web Truss Girders with 136 nos. of 32.2 m long Composite Plate Girders for Viaducts on either side. This project will be finished in 2024. STUP Consultants P Limited of India is the Engineering Consultants for Design and Construction Supervision Services. STUP Consultants got associated with this Project since 1 January 2018. The construction work of the bridge was completed on 25 June 2022.


Features

* Height: from the land level. * Number of Spans: 136 nos. of 32.2 m long Steel Composite Plate Girders on Viaduct on both end with 7 nos. of 102.4 m long Double Warren Type Truss Girders for the main bridge. * Number of Piles: 1.0 m Dia 836 nos. of Piles for Viaducts and 2.5 m Dia 72 nos. of Piles for the main bridge and Fenders. Average length of 2.5 m dia pile for main bridge is about 65 m * Number of Piers & Pier Caps: 136 + 8 = 144.