The Romaine-1 Generating Station () is a 270 MW hydroelectric generating station on the
Romaine River The Romaine River (), known also as the Kanatuahkuiau, Uanaman Hipu, and Uepatauekat Shipu, is a river in eastern Canada. It flows from north to south, emptying into the Jacques Cartier Strait in the municipality of Havre-Saint-Pierre. The Roma ...
in the
Côte-Nord Côte-Nord (Region 09) (, ; ) is an List of regions of Quebec, administrative region of Quebec, on the Quebec-Labrador peninsula, Quebec-Labrador Peninsula, Canada. The region runs along the St. Lawrence River and then the Gulf of St. Lawrence, ...
region of the province of Quebec, Canada. It is owned and operated by
Hydro-Québec Hydro-Québec () is a Canadian Crown corporations of Canada#Quebec, Crown corporation public utility headquartered in Montreal, Quebec. It manages the electricity generation, generation, electric power transmission, transmission and electricity ...
.


Location

The dam is on the Romaine River in the municipality of
Havre-Saint-Pierre Havre-Saint-Pierre () is a municipality located on the north shore of the Gulf of St. Lawrence, in Côte-Nord region, Minganie RCM, Quebec, Canada. History In 1857, a group of Acadian families arrived, in 1872, the Parish of Saint-Pierre-d ...
in the Minganie Regional County Municipality, Quebec. It is from the mouth of the river. The site is open to visitors, who can visit three floors of the generating station and walk on the dam.


Description

The Romaine-1 Dam (''Barrage de la Romaine-1'') is high and has a holding capacity of . It is zoned rockfill, with a waterproofing screen. The foundation is treated rock. The reservoir covers . Peak surface elevation is . Drawdown from peak to minimum water levels is just . A short canal carries water from just west of the dam to the generating station's water intake. The plant does not have a feed gallery or a surge chamber. It has two Francis-type turbine generator units. The generating station has capacity of 270 MW. The utilization factor is 0.59. Annual average production is 1.4 TW. With its small reservoir, Romaine-1 gives off low and variable greenhouse gas emissions, and in this is similar to a
run-of-the-river Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amou ...
station. The Romaine complex as a whole is one of the most efficient in Quebec in terms of CO2 equivalent emissions per TWh.


History

The dams and generating station are part of a huge hydroelectric complex with four dams on the Romaine River. The overall Romaine project was formally launched by Quebec premier
Jean Charest John James "Jean" Charest (; born June 24, 1958) is a Canadian lawyer and former politician who served as the 29th premier of Quebec from 2003 to 2012. Prior to that, he was a member of Parliament (MP) between 1984 and 1998. After holding se ...
in May 2009. A road was built to provide access to the four dams. The Murailles camp at from the start of the road was built to house up to 2,408 workers on the Romaine 2 and Romaine 1 projects. The project was completed in 42 months, 7 months ahead of schedule. On 25 November 2015 Hydro-Québec announced that the generating station had been commissioned with a group of turbine generators producing 135 MW of power. A second group of generators was planned to start up later that year. Romaine-1 is the second power station commissioned on the Romaine River. The first was the 640 MW Romaine-2. In September 2017 Hydro-Québec had said it had no plans for more dams due to the present surplus of electricity. During the inauguration of Romaine-3 in October 2017, Quebec premier
Philippe Couillard Philippe Couillard (; born June 26, 1957) is a Canadian business advisor and former neurosurgeon, university professor and politician who served as 31st premier of Quebec from 2014 to 2018. Between 2003 and 2008, he was Quebec's Minister of H ...
confirmed that no more major projects were planned.


Controversies

The company had to negotiate several agreements with the local
Innu The Innu/Ilnu ('man, person'), formerly called Montagnais (French for ' mountain people'; ), are the Indigenous Canadians who inhabit northeastern Labrador in present-day Newfoundland and Labrador and some portions of Quebec. They refer to ...
communities, paying more than CDN$200 million over a 60-year period to compensate for the effects of the dams, roads and electric transmission lines. There were a number of controversies. In March 2012
Quebec Route 138 Route 138 is a major highway in the Canadian province of Quebec, following the entire north shore of the St. Lawrence River past Montreal to the temporary eastern terminus in Kegashka on the Gulf of St. Lawrence. The western terminus is in E ...
was blocked at
Maliotenam Maliotenam (Mani-Utenam in Innu-aimun) is a First Nations reserve in Quebec, located adjacent to the city of Sept-Îles. Together with Uashat some distance away, it forms the Innu The Innu/Ilnu ('man, person'), formerly called Mont ...
by the Innu, who were demanding compensation for the power lines on their territory. In June 2015 Route 138 was blocked at
Pessamit Pessamit (formerly Betsiamites, or Bersimis), is a First Nations reserve and Innu community in the Canadian province of Quebec, located about southwest from Baie-Comeau along the north shore of the Saint Lawrence River at the mouth of the Betsi ...
and
Maliotenam Maliotenam (Mani-Utenam in Innu-aimun) is a First Nations reserve in Quebec, located adjacent to the city of Sept-Îles. Together with Uashat some distance away, it forms the Innu The Innu/Ilnu ('man, person'), formerly called Mont ...
, and the access road to the construction site was blocked, by construction workers demanding that more local workers be hired. In July 2015 the road to the site was blocked by the Innu of Natashquan who felt that Hydro-Quebec did not respect the agreement signed in 2008. In March 2016 a court rejected the demand by Innu families of Uashat mak Mani-utenam to stop the project. In November 2016 there was controversy over the waste of wood cut in the reservoirs.