Rogaland Fixed Link or simply the Rogfast, is a project to construct a sub-sea
road tunnel A tunnel is an underground or undersea passageway. It is dug through surrounding soil, earth or rock, or laid under water, and is usually completely enclosed except for the two portals common at each end, though there may be access and ve ...
in Rogaland County,
Norway Norway, officially the Kingdom of Norway, is a Nordic countries, Nordic country located on the Scandinavian Peninsula in Northern Europe. The remote Arctic island of Jan Mayen and the archipelago of Svalbard also form part of the Kingdom of ...
, running between the municipalities of
Randaberg Randaberg is a municipality in Rogaland county, Norway. It is located in the traditional district of Jæren, at the northern end of the Stavanger Peninsula. The administrative centre of the municipality is the village of Randaberg. Randaberg ...
(near the city of Stavanger) and
Bokn Bokn is a List of municipalities of Norway, municipality in Rogaland county, Norway. It is located in the Traditional districts of Norway, traditional district of Haugaland. The administrative centre of the municipality is the village of Føresvi ...
, with a spur connecting to the island municipality of
Kvitsøy Kvitsøy is an island municipality in Rogaland county, Norway. At only , it is the smallest municipality in Norway by area and one of the smallest by population. Kvitsøy is located in the traditional district of Ryfylke. The administrative cen ...
. Once operational, the Boknafjord tunnel will become both the longest underwater road tunnel in the world, with a length of and the deepest tunnel overall, with a maximum depth of below sea level. This will be a part of the main
European route E39 European route E39 is the designation of a north–south road in Norway and Denmark from Klett, just south of Trondheim (city), Trondheim, to Aalborg via Bergen, Stavanger and Kristiansand. In total, there are nine ferries, more than any other ...
highway along the west coast of Norway and it will link the cities of
Kristiansand Kristiansand is a city and Municipalities of Norway, municipality in Agder county, Norway. The city is the fifth-largest and the municipality is the sixth-largest in Norway, with a population of around 116,000 as of January 2020, following th ...
Stavanger Stavanger, officially the Stavanger Municipality, is a city and municipalities of Norway, municipality in Norway. It is the third largest city and third largest metropolitan area in Norway (through conurbation with neighboring Sandnes) and the ...
Haugesund Haugesund () is a municipalities of Norway, municipality and List of towns and cities in Norway, town on the North Sea in Rogaland county, Norway. As of December 2023, the municipality of Haugesund has a population of 37,855. The vast majority of ...
Bergen Bergen (, ) is a city and municipalities of Norway, municipality in Vestland county on the Western Norway, west coast of Norway. Bergen is the list of towns and cities in Norway, second-largest city in Norway after the capital Oslo. By May 20 ...
. It is currently slated for a 2033 opening.


Original plan: 2017

The tunnel is planned as a roadway which will run below the Boknafjorden and Kvitsøyfjorden. A spur connection tunnel, called the Kvitsøy tunnel, going to the island municipality of
Kvitsøy Kvitsøy is an island municipality in Rogaland county, Norway. At only , it is the smallest municipality in Norway by area and one of the smallest by population. Kvitsøy is located in the traditional district of Ryfylke. The administrative cen ...
is included in the project. The project was approved by the
Storting The Storting ( ; ) is the supreme legislature of Norway, established in 1814 by the Constitution of Norway. It is located in Oslo. The Unicameralism, unicameral parliament has 169 members and is elected every four years based on party-list propo ...
(Norwegian Parliament) in May 2017, and it was planned to be finished in 2025–26. At that time, the project was projected to cost
NOK Nok is a village in Jaba, Nigeria, Jaba Local Government Area of Kaduna State, Nigeria. The village is an archeological site. Archaeology The discovery of terracotta figurines at this location caused its name to be used for the Nok culture, ...
16.8 billion (about
The euro sign () is the currency sign used for the euro, the official currency of the eurozone. The design was presented to the public by the European Commission on 12 December 1996. It consists of a stylized letter E (or epsilon), crossed by t ...
1.73 billion), with financing set at NOK11 billion from a loan to be paid by tolls, and 6 billion directly from the government. Construction began in January 2018, with a ceremony for the initial rock blasting for one future entrance to the tunnel.


Project halt and updated plans: 2019–2020

In October 2019, due to cost overruns predicted in budgetary updates, the project was halted, with all plans for issuing of contracts (the project was being contracted out in stages) cancelled. In December 2019, the government requested a full review and revised budget update. The first public awareness of higher costs had occurred in July 2019, when the
Norwegian Public Roads Administration The Norwegian Public Roads Administration () is a Norwegian government agency responsible for national and county public roads in Norway. This includes planning, construction and operation of the national and county road networks, driver trainin ...
announced that it had received only two bids on the contract for the spur connection tunnel to
Kvitsøy Kvitsøy is an island municipality in Rogaland county, Norway. At only , it is the smallest municipality in Norway by area and one of the smallest by population. Kvitsøy is located in the traditional district of Ryfylke. The administrative cen ...
, the lowest of which was
NOK Nok is a village in Jaba, Nigeria, Jaba Local Government Area of Kaduna State, Nigeria. The village is an archeological site. Archaeology The discovery of terracotta figurines at this location caused its name to be used for the Nok culture, ...
1 billion higher than the amount approved by the
Storting The Storting ( ; ) is the supreme legislature of Norway, established in 1814 by the Constitution of Norway. It is located in Oslo. The Unicameralism, unicameral parliament has 169 members and is elected every four years based on party-list propo ...
in 2017. In September 2019, the Kvitsøy bidding process was closed without granting a contract. An update in November 2019 suggested that the earliest possible completion of the project would be in 2029. By April 2020, the Norwegian Public Roads Administration's revised update estimated that the cost of the total project (including the Kvitsøy spur) had increased to NOK25 billion, an increase of NOK6.4 billion, but stated it believed there were savings of up to NOK4 billion to be found before it would submit a revised funding request to the government. In October 2020, the Norwegian Public Roads Administration brought its revised plan to the government for consideration. Included was the intention to divide the entire project into four contracts, with the comprehensive bidding process for the first three contracts to start in 2021, for work to commence in late 2021 and early 2022. These three contracts will cover: the Kvitsøy tunnel segment; the long tunnel segment building north from
Randaberg Randaberg is a municipality in Rogaland county, Norway. It is located in the traditional district of Jæren, at the northern end of the Stavanger Peninsula. The administrative centre of the municipality is the village of Randaberg. Randaberg ...
; and the long tunnel segment building south from
Bokn Bokn is a List of municipalities of Norway, municipality in Rogaland county, Norway. It is located in the Traditional districts of Norway, traditional district of Haugaland. The administrative centre of the municipality is the village of Føresvi ...
. The fourth contract, completing the interchange tunnels connecting the Kvitsøy tunnel to the other two, will go to bidding when the Kvitsøy tunnel is completed. The interconnection, allowing the Rogfast to open, is now forecast to be completed in 2031. In late November 2020, the Norwegian Public Roads Administration received new approval from the government for a revised budget of NOK24.8 billion (€2.55 billion) (contrary to the April 2020 "hope" of reducing it to NOK21 billion), an increase of roughly NOK8 billion from the budget approved in 2017. The government agreed to increase its direct contribution to NOK9.9 billion, with the remaining NOK14.9 billion to be financed by borrowing that would be repaid by tolls charged to vehicles using the Rogfast; this constituted matching NOK3.9 billion increases on both the government contribution and the toll-based loan. As of March 2022 the estimated opening date has further been delayed to 2033, with more recent delays due to gaining successful contractor bids. On December 12, 2022, the first main contract was signed with Skanska for the construction of the northern part of the 26.7-kilometer tunnel, valued at nearly 5 billion NOK. The second main contract, signed on January 9, 2023, with Implenia Norge, focuses on the southern part of the tunnel, amounting to 4 billion NOK. The final main contract, signed June 11, 2024, also with Implenia/Stangeland for the middle part of the tunnel is valued at 6.2 billion NOK. As of November 2023, in the Kvitsøy tunnel, contractor Hæhre/Risa completed the blasting phase, conducting around 800 blasts over 3.5 kilometers, and initiated groundwork for water and sewage systems, targeting completion of their contract by spring/summer 2024. In Mekjarvik, Implenia/Stangeland has excavated 1.3 kilometers of the tunnel, with the aim to reach daylight by early 2024. Construction has also commenced at the other end.


Name

The name ''Rogfast'' is an abbreviation for the Norwegian name which is translated to English as the "Rogaland fixed link". ''Boknafjord tunnel'' refers to the Boknafjord and ''Kvitsøy tunnel'' refers to the island and the municipality of the same name.


See also

*
List of longest tunnels This list of longest tunnels ranks tunnels that are at least long. Only continuous tunnels are included. Pipelines, even those that are buried, are excluded. The longest tunnels have been constructed for Water supply network, water distribution, ...


References


External links


Statens Vegvesen – E39 Rogfast

Official Facebook page with regular updates
{{authority control Proposed tunnels in Norway Subsea tunnels in Norway European route E39 in Norway Bokn Kvitsøy Randaberg Proposed road tunnels in Europe