Reverse semantic traceability (RST) is a quality control method for verification improvement that helps to insure high quality of
artifact Artifact, or artefact, may refer to: Science and technology * Artifact (error), misleading or confusing alteration in data or observation, commonly in experimental science, resulting from flaws in technique or equipment ** Compression artifact, a ...
s by backward translation at each stage of the
software development process In software engineering, a software development process is a process of dividing software development work into smaller, parallel, or sequential steps or sub-processes to improve design, product management. It is also known as a software deve ...
.


Brief introduction

Each stage of development process can be treated as a series of “translations” from one language to another. At the very beginning a
project A project is any undertaking, carried out individually or collaboratively and possibly involving research or design, that is carefully planned to achieve a particular goal. An alternative view sees a project managerially as a sequence of even ...
team deals with customer’s requirements and expectations expressed in natural language. These customer requirements sometimes might be incomplete, vague or even contradictory to each other. The first step is specification and formalization of customer expectations, transition (“translation”) of them into a formal requirement document for the future system. Then requirements are translated into
system architecture A system architecture is the conceptual model that defines the structure, behavior, and more views of a system. An architecture description is a formal description and representation of a system, organized in a way that supports reasoning about ...
and step by step the project team generates code written in a very formal programming language. There is always a threat of inserting mistakes, misinterpreting or losing something during the translation. Even a small defect in requirement or
design A design is a plan or specification for the construction of an object or system or for the implementation of an activity or process or the result of that plan or specification in the form of a prototype, product, or process. The verb ''to design'' ...
specification A specification often refers to a set of documented requirements to be satisfied by a material, design, product, or service. A specification is often a type of technical standard. There are different types of technical or engineering specificat ...
s can cause huge amounts of defects at the late stages of the project. Sometimes such misunderstandings can lead to project failure or complete customer dissatisfaction. The highest usage scenarios of Reverse Semantic Traceability method can be: * Validating
UML The Unified Modeling Language (UML) is a general-purpose, developmental modeling language in the field of software engineering that is intended to provide a standard way to visualize the design of a system. The creation of UML was originally ...
models: quality engineers restore a textual description of a
domain Domain may refer to: Mathematics *Domain of a function, the set of input values for which the (total) function is defined ** Domain of definition of a partial function **Natural domain of a partial function **Domain of holomorphy of a function *Do ...
, original and restored descriptions are compared. * Validating model changes for a new requirement: given an original and changed versions of a model, quality engineers restore the textual description of the requirement, original and restored descriptions are compared. * Validating a bug fix: given an original and modified
source code In computing, source code, or simply code, is any collection of code, with or without comment (computer programming), comments, written using a human-readable programming language, usually as plain text. The source code of a Computer program, p ...
, quality engineers restore a textual description of the bug that was fixed, original and restored descriptions are compared. * Integrating new
software engineer Software engineering is a systematic engineering approach to software development. A software engineer is a person who applies the principles of software engineering to design, develop, maintain, test, and evaluate computer software. The term ''p ...
into a team: a new team member gets an assignment to do Reverse Semantic Traceability for the key artifacts from the current projects.


RST roles

Main roles involved in RST session are: * authors of project artifacts (both input and output), * reverse engineers, * expert group, * project manager.


RST process


Define all project artifacts and their relationship

Reverse Semantic Traceability as a validation method can be applied to any project artifact, to any part of project artifact or even to a small piece of document or code. However, it is obvious that performing RST for all artifacts can create overhead and should be well justified (for example, for medical software where possible information loss is very critical). It is a responsibility of company and
project manager A project manager is a professional in the field of project management. Project managers have the responsibility of the planning, procurement and execution of a project, in any undertaking that has a defined scope, defined start and a defined fi ...
to decide what amount of project artifacts will be “
reverse engineered Reverse engineering (also known as backwards engineering or back engineering) is a process or method through which one attempts to understand through deductive reasoning how a previously made device, process, system, or piece of software accompli ...
”. This amount depends on project specific details:
trade-off A trade-off (or tradeoff) is a situational decision that involves diminishing or losing one quality, quantity, or property of a set or design in return for gains in other aspects. In simple terms, a tradeoff is where one thing increases, and anot ...
matrix, project and company quality assurance
policies Policy is a deliberate system of guidelines to guide decisions and achieve rational outcomes. A policy is a statement of intent and is implemented as a procedure or protocol. Policies are generally adopted by a governance body within an orga ...
. Also it depends on importance of particular artifact for project success and level of quality control applied to this artifact. Amount of RST sessions for project is defined at the project planning stage. First of all project manager should create a list of all artifacts project team will have during the project. They could be presented as a tree with dependencies and relationships. Artifacts can be present in one occurrence (like Vision document) or in several occurrences (like risks or bugs). This list can be changed later during the project but the idea behind the decisions about RST activities will be the same.


Prioritize

The second step is to analyze
deliverable A deliverable is a tangible or intangible good or service produced as a result of a project that is intended to be delivered to a customer (either internal or external). A deliverable could be a report, a document, a software product, a server upgr ...
importance for project and level of quality control for each project artifact. Importance of document is the degree of artifact impact to project success and quality of final product. It’s measured by the scale: * Crucial (1): the quality of deliverable is very important for overall quality of project and even for project success. Examples:
Functional requirement In software engineering and systems engineering, a functional requirement defines a function of a system or its component, where a function is described as a specification of behavior between inputs and outputs. Functional requirements may involv ...
s,
System architecture A system architecture is the conceptual model that defines the structure, behavior, and more views of a system. An architecture description is a formal description and representation of a system, organized in a way that supports reasoning about ...
, critical bug fixes (show stoppers), risks with high probability and critical impact. * High (2): the deliverable has an impact to quality of final product. Examples:
Test case In software engineering, a test case is a specification of the inputs, execution conditions, testing procedure, and expected results that define a single test to be executed to achieve a particular software testing objective, such as to exercise ...
s,
User interface In the industrial design field of human–computer interaction, a user interface (UI) is the space where interactions between humans and machines occur. The goal of this interaction is to allow effective operation and control of the machine f ...
requirements, major severity bug fixes, risks with high expose. * Medium (3): the artifact has a medium or indirect impact to quality of final product. Examples:
Project plan A project plan, according to the Project Management Body of Knowledge (PMBOK), is: "...a formal, approved document used to guide both ''project execution'' and ''project control''. The primary uses of the project plan are to document planning ass ...
, medium severity bug fixes, risks with medium expose. * Low (4): the artifact has insignificant impact to the final product quality. Example: employees’ tasks, cosmetic bugs, risks with low probability. Level of quality control is a measure that defines amount of verification and validation activities applied to artifact, and probability of miscommunication during artifact creation. * Low (1): No review is supposed for the artifact, miscommunication and information loss are high probable, information channel is distributed, language barrier exists etc. * Medium (2): No review is supposed for the artifact, information channel is not distributed (e.g. creator of artifact and information provider are members of one team) * Sufficient (3): Pair development or peer review is done, information channel is not distributed. * Excellent (4): Pair development, peer review and/or testing are done, automation or unit testing is done, or there are some tools for artifact development and validation.


Define responsible people

Success of RST session strongly depends on correct assignment of responsible people.


Perform Reverse Semantic Traceability of artifact

Reverse Semantic Traceability starts when decision that RST should be performed is made and resources for it are available. Project manager defines what documents will be an input for RST session. For example, it can be not only an artifact to restore but some background project information. It is recommended to give to reverse engineers number of words in original text so that they have an idea about amount of text they should get as a result: it can be one sentence or several pages of text. Though, the restored text may not contain the same number of words as original text nevertheless the values should be comparable. After that reverse engineers take the artifact and restore the original text from it. RST itself takes about 1 hour for one page text (750 words).


Value the level of quality and make a decision

To complete RST session, restored and original texts of artifact should be compared and quality of artifact should be assessed. Decision about artifacts rework and its amount is made based on this assessment. For assessment a group of experts is formed. Experts should be aware of project domain and be an experienced enough to assess quality level of compared artifacts. For example, business analysts will be experts for comparison of vision statement and restored vision statement from scenario. RST assessment criteria: # Restored and original texts have quite big differences in meaning and crucial information loss # Restored and original texts have some differences in meaning, important information loss # Restored and original texts have some differences in meaning, some insignificant information loss # Restored and original texts are very close, some insignificant information loss # Restored and original texts are very close, none information is lost Each of experts gives his assessment, and then the average value is calculated. Depending on this value Project Manager makes a decision should both artifacts be corrected or one of them or rework is not required. If the average RST quality level is in range from 1 to 2 the quality of artifact is poor and it is recommended not only rework of validated artifact to eliminate defects but corrections of original artifact to clear misunderstandings. In this case one more RST session after rework of artifacts is required. For artifacts that have more than 2 but less than 3 corrections of validated artifact to fix defects and eliminate information loss is required, however review of original artifact to find out if there any vague piece of information that cause misunderstandings is recommended. No additional RST sessions is needed. If the average mark is more than 3 but less than 4 then corrections of validated artifact to remove defects and insignificant information loss is supposed. If the mark is greater than 4 it means that artifact is of good quality and no special corrections or rework is required. Obviously the final decision about rework of artifacts is made by project manager and should be based on analysis of reasons of differences in texts.


See also

* P-Modeling Framework


References

* Vladimir Pavlov and Anton Yatsenko
The Babel Experiment: An Advanced Pantomime-based Training in OOA&OOD with UML
''36th 'ACM Technical Symposium on Computer Science Education (SIG CSE 2005)'', St Louis (Missouri, USA).


External links


Vladimir L. Pavlov website

P-Modeling Framework Whitepaper

P-Modeling Framework
Quality control Software testing Software quality