HOME

TheInfoList



OR:

The Red Line is a
rapid transit Rapid transit or mass rapid transit (MRT) or heavy rail, commonly referred to as metro, is a type of high-capacity public transport that is generally built in urban areas. A grade separation, grade separated rapid transit line below ground su ...
line operated by the
Massachusetts Bay Transportation Authority The Massachusetts Bay Transportation Authority (abbreviated MBTA and known colloquially as "the T") is the public agency responsible for operating most public transportation services in Greater Boston, Massachusetts. The MBTA transit network in ...
(MBTA) as part of the
MBTA subway The Massachusetts Bay Transportation Authority (MBTA) operates rapid transit (heavy rail), light rail, and bus rapid transit services in the Boston metropolitan area, collectively referred to as the rapid transit, subway, the T system, or simp ...
system. The line runs south and east underground from Alewife station in North Cambridge through Somerville and
Cambridge Cambridge ( ) is a List of cities in the United Kingdom, city and non-metropolitan district in the county of Cambridgeshire, England. It is the county town of Cambridgeshire and is located on the River Cam, north of London. As of the 2021 Unit ...
, surfacing to cross the Longfellow Bridge then returning to tunnels under
Downtown Boston Downtown Boston is the central business district of Boston, Massachusetts, United States. Boston was founded in 1630. The largest of the city's commercial districts, Downtown is the location of many corporate or regional headquarters; city, c ...
. It continues underground through
South Boston South Boston (colloquially known as Southie) is a densely populated neighborhood of Boston, Massachusetts, United States, located south and east of the Fort Point Channel and abutting Dorchester Bay (Boston Harbor), Dorchester Bay. It has under ...
, splitting into two branches on the surface at JFK/UMass station. The Ashmont branch runs southwest through Dorchester to
Ashmont station Ashmont station (signed as Ashmont/Peabody Sq.) is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station located at Peabody Square in the Dorchester neighborhood of Boston, Massachusetts. It is the southern terminus o ...
, where the connecting
light rail Light rail (or light rail transit, abbreviated to LRT) is a form of passenger urban rail transit that uses rolling stock derived from tram technology National Conference of the Transportation Research Board while also having some features from ...
Mattapan Line The Mattapan Line (alternatively the Mattapan Trolley and historically the Ashmont–Mattapan High-Speed Line) is a partially grade separation, grade-separated light rail line which forms part of the Massachusetts Bay Transportation Authority, ...
(shown as part of the Red Line on maps, but operated separately) continues to Mattapan station. The Braintree branch runs southeast through Quincy and Braintree to Braintree station. The Red Line operates during normal MBTA service hours (all times except late nights) with six-car trains. The 218-car active fleet consists of three orders of cars built in 1969–70, 1987–89, and 1993–94. A 252-car order from
CRRC CRRC Corporation Limited (known as CRRC) is a Chinese state-owned and publicly traded rolling stock manufacturer. It is the world's largest rolling stock manufacturer in terms of revenue, eclipsing its major competitors of Alstom and Siemens. ...
is being built from 2019 to 2024. The Red Line is fully
grade-separated In civil engineering (more specifically highway engineering), grade separation is a method of aligning a junction of two or more surface transport axes at different heights ( grades) so that they will not disrupt the traffic flow on other tr ...
; trains are driven by operators with
automatic train control Automatic train control (ATC) is a general class of train protection systems for railways that involves a speed control mechanism in response to external inputs. For example, a system could effect an emergency brake application if the driver do ...
for safety. Cabot Yard in South Boston is used for heavy maintenance and storage; yards at Alewife, Ashmont, and Braintree are also used for storage. All 22 Red Line stations are fully accessible. Averaging 119,000 weekday passengers in 2023, the Red Line has the highest ridership of the MBTA subway lines. The
Boston Elevated Railway The Boston Elevated Railway (BERy) was a Tram, streetcar and rapid transit railroad operated on, above, and below, the streets of Boston, Massachusetts and surrounding communities. Founded in 1894, it eventually acquired the West End Street R ...
opened its Cambridge tunnel between and in 1912. It was extended south as the Dorchester Tunnel to Washington (now ) in 1915, in 1916, in 1917, and in 1918. The Dorchester extension added three stops to in 1927 and two more stops to Ashmont in 1928. Charles (now ) was added as an
infill station An infill station (sometimes in-fill station) is a train station built on an existing passenger rail, rapid transit, or light rail line to address demand in a location between existing stations. Such stations take advantage of existing train ser ...
in 1932. The newly formed MBTA assigned colors to its subway lines in 1965, with the Cambridge–Dorchester line becoming the Red Line. The MBTA added the three-station South Shore Line to in 1971; it was extended to Braintree in 1980, with added as an infill in 1983. The Red Line Northwest Extension, originally planned to run to Arlington Heights or Route 128, opened to in 1984 and Alewife in 1985.


History


Cambridge tunnel

The Red Line was the last of the four original Boston subway lines (the others being the
Green Green is the color between cyan and yellow on the visible spectrum. It is evoked by light which has a dominant wavelength of roughly 495570 nm. In subtractive color systems, used in painting and color printing, it is created by a com ...
, Orange, and
Blue Blue is one of the three primary colours in the RYB color model, RYB colour model (traditional colour theory), as well as in the RGB color model, RGB (additive) colour model. It lies between Violet (color), violet and cyan on the optical spe ...
Lines, opened in 1897, 1901, and 1904, respectively) to be constructed. Construction of the Cambridge tunnel, connecting
Harvard Square Harvard Square is a triangular plaza at the intersection of Massachusetts Avenue (Boston), Massachusetts Avenue, Brattle Street (Cambridge, Massachusetts), Brattle Street and John F. Kennedy Street near the center of Cambridge, Massachusetts, C ...
to Boston, was delayed by a dispute over the number of intermediate stations to be built along the new line. Cambridge residents, led by Mayor Wardwell, wanted at least five stations built along the line, while suburbanites interested in faster through travel argued for only a single intermediate station, at Central Square. The contending groups finally compromised on two intermediate stations, at Central and Kendall Squares, allowing construction to start in 1909. The section from
Harvard Harvard University is a private Ivy League research university in Cambridge, Massachusetts, United States. Founded in 1636 and named for its first benefactor, the Puritan clergyman John Harvard, it is the oldest institution of higher lear ...
(and new maintenance facilities at Eliot Yard) to Park Street was opened by the
Boston Elevated Railway The Boston Elevated Railway (BERy) was a Tram, streetcar and rapid transit railroad operated on, above, and below, the streets of Boston, Massachusetts and surrounding communities. Founded in 1894, it eventually acquired the West End Street R ...
(BERy) on March 23, 1912. At Harvard, a prepayment station provided easy transfer to streetcars routed through what is now the Harvard bus tunnel. From Harvard, the Cambridge tunnel traveled beneath Massachusetts Avenue to Central Square station. It then continued under Mass. Ave until Main Street, which it followed to reach Kendall station. The underground line then rose onto the Longfellow Bridge, using a central right-of-way which had been reserved during the bridge's 1900–1906 construction. On the Boston side, the line briefly became an
elevated railway An elevated railway or elevated train (also known as an el train or el for short) is a railway with the Track (rail transport), tracks above street level on a viaduct or other elevated structure (usually constructed from steel, cast iron, concre ...
, as vehicle lanes descended beneath it to Charles Circle; the tracks then immediately entered a tunnel beneath Beacon Hill, leading to new lower-level platforms at Park Street Under. Charles Station (now Charles/MGH) was added above the traffic circle in 1932.


Dorchester Tunnel and extension

The Dorchester Tunnel to Washington Street and South Station Under opened on April 4, 1915 and December 3, 1916, with transfers to the Washington Street Tunnel and
Atlantic Avenue Elevated The Atlantic Avenue Elevated was an elevated railway around the east side of Downtown Boston, Massachusetts, providing a second route for the Boston Elevated Railway's Main Line Elevated (now the MBTA's Orange Line) around the Washington Stre ...
, respectively. Further extensions opened to Broadway on December 15, 1917 and
Andrew Andrew is the English form of the given name, common in many countries. The word is derived from the , ''Andreas'', itself related to ''aner/andros'', "man" (as opposed to "woman"), thus meaning "manly" and, as consequence, "brave", "strong", "c ...
on June 29, 1918, both prepayment stations for streetcar transfer. The Broadway station included an upper level with its own tunnel for streetcars, which was soon abandoned in 1919 due to most lines being truncated to Andrew. The upper level at Broadway was later incorporated into the
mezzanine A mezzanine (; or in Italian, a ''mezzanino'') is an intermediate floor in a building which is partly open to the double-height ceilinged floor below, or which does not extend over the whole floorspace of the building, a loft with non-sloped ...
. Next came the Dorchester extension (now the Ashmont branch), following a rail right-of-way created in 1870 by the Shawmut Branch Railroad. In 1872, the right-of-way was acquired by the Old Colony Railroad to connect their main line at Harrison Square with the Dorchester and Milton Branch Railroad, running from the Old Colony at Neponset, west to what is now Mattapan station. The
New York, New Haven and Hartford Railroad The New York, New Haven and Hartford Railroad , commonly known as The Consolidated, or simply as the New Haven, was a railroad that operated principally in the New England region of the United States from 1872 to 1968. Founded by the merger of ...
succeeded the Old Colony in operating the branch, but passenger service ceased on September 4, 1926, in anticipation of the construction of the BERy's Dorchester extension. The BERy opened the first phase of the Dorchester extension, to Fields Corner station, on November 5, 1927, south from
Andrew Andrew is the English form of the given name, common in many countries. The word is derived from the , ''Andreas'', itself related to ''aner/andros'', "man" (as opposed to "woman"), thus meaning "manly" and, as consequence, "brave", "strong", "c ...
, then southeast to the surface and along the west side of the Old Colony mainline in a depressed right-of-way. Columbia and Savin Hill stations were built on the surface at the sites of former Old Colony stations. The remainder of the extension opened to Ashmont and Codman Yard on September 1, 1928, and included Shawmut station, where there had been a surface Old Colony station, but where the new rapid transit station was placed underground. The first phase of the Ashmont–Mattapan High Speed Line opened on August 26, 1929, using the rest of the Shawmut Branch right-of-way, including Cedar Grove station, and part of the old Dorchester and Milton Branch. On January 13, 1961, the MTA began operating " modified express service" on the line during the morning rush hour, following the introduction of similar service on the Forest Hills–Everett line the month before. Every other train bypassed Shawmut, Savin Hill, Columbia, and Charles stations. This was discontinued in September 1961 to reduce wait times at the skipped stations, most of which were outdoors. Charles was renamed Charles/MGH in December 1973, and Kendall was renamed Kendall/MIT on August 7, 1978. In January 1981, the MBTA proposed to close the Ashmont branch on Sundays – and the Mattapan Line at all times – beginning that March due to severe budget issues. The closure was cancelled, though the lines were closed from June 20, 1981, to January 16, 1982, for track replacement and tunnel repairs.


MBTA era and branding

The line was sometimes referred to as the Cambridge–Dorchester line and the Cambridge–Dorchester subway. It was marked on maps as "Route 1". After taking over operations in August 1964, the MBTA began rebranding many elements of Boston's public transportation network. Colors were assigned to the rail lines on August 26, 1965 as part of a wider modernization developed by
Cambridge Seven Associates Cambridge Seven Associates, Inc., stylized as CambridgeSeven, and sometimes as C7A, is an American architecture firm based in Cambridge, Massachusetts. Buildings designed by the firm have included academic, museum, exhibit, hospitality, transpor ...
, with the Cambridge–Dorchester line becoming the Red Line. Peter Chermayeff claims to have assigned red to the line because of Harvard's association with
crimson Crimson is a rich, deep red color, inclining to purple. It originally meant the color of the kermes dye produced from a scale insect, '' Kermes vermilio'', but the name is now sometimes also used as a generic term for slightly bluish-red col ...
.


South Shore line

On July 28, 1965, the MBTA signed an agreement with the New Haven Railroad to purchase of the former Old Colony mainline from Fort Point Channel to South Braintree in order to construct a new rapid transit line along the corridor. The line was expected to be completed within two years. The agreement also provided for the MBTA to subsidize commuter service on the railroad's remaining commuter rail lines for $1.2 million annually. Original plans called for the South Shore line to be largely independent of the existing Red Line, with either a northern terminus at the surface level at South Station or a tunnel leading to a stub-end terminal between Post Office Square and State Street. However, it was later decided to have the line be a new southern branch of the Red Line. The first section of the South Shore line, under construction since 1966, opened on September 1, 1971, branching from the original Red Line at a
flying junction A flying junction or flyover is a railway junction at which one or more diverging or converging tracks in a multiple-track route cross other tracks on the route by bridge to avoid conflict with other train movements. A more technical term is "gr ...
north of Columbia (now JFK/UMass). It ran along the west side of the Old Colony rail right-of-way (which has since been reduced to one track), crossing to the east side north of Savin Hill. The northernmost station was North Quincy, with others at Wollaston and Quincy Center. Service began alternating between Ashmont and Quincy. Ashmont service operated with 1400-series cars, while the Quincy branch only had 1500- and 1600-series cars because they had cab signaling. In December 1969, the MBTA purchased
Penn Central The Penn Central Transportation Company, commonly abbreviated to Penn Central, was an American class I railroad that operated from 1968 to 1976. Penn Central combined three traditional corporate rivals, the Pennsylvania, New York Central and the ...
's Dover Street Yards for $7 million. Vi
Tremont Street Subway NHL documentation
The site was used for the South Bay Maintenance Center (later Cabot Yard), which included Red Line shops (to replace Eliot Yard) and an adjacent bus garage. A $7.8 million construction contract was awarded in 1972, with groundbreaking on September 16. The facility was dedicated on June 24, 1974; on December 28, Bartlett Street garage in Roxbury was closed. Three southbound trains collided inside the Beacon Hill tunnel on August 1, 1975, injuring 132 passengers.


Braintree extension

Beyond Quincy Center, the Braintree extension runs southward to Braintree, opened on March 22, 1980, via an intermediate stop at Quincy Adams which opened on September 10, 1983 due to delays. The extension was part of the massive 1965 extension plan, although it was delayed due to questions over station siting in Braintree. The Boston Transportation Planning Review, published in 1969, proposed North Braintree and South Braintree stations following the Quincy Center station. Several outlying sections of the MBTA subway system, including Quincy Adams and Braintree, originally charged a double fare to account for the additional costs of running service far from downtown. Passengers paid two fares to enter at the stations, and an
exit fare An exit fare is a method of collecting ridership fees, or fares, from a transportation system, where the fee (or part of the fee) is collected from passengers upon reaching their destination. Examples Exit fares were used on the subway lines ...
when leaving the station. Double fares on the Braintree extension, the last on the system, were discontinued in 2007 as part of a wider fare restructuring.


Northwest extension

By 1922, the BERy believed that Harvard would be the permanent terminus; the heavy ridership from the north was expected to be handled by extending rapid transit from Lechmere Square. The 1926 ''Report on Improved Transportation Facilities in the Boston Metropolitan District'' proposed an extension from Lechmere to North Cambridge via the Southern Division and the Fitchburg Cutoff, with a possible further extension along the
Lexington Branch Lexington or The Lexington may refer to: Places England *Laxton, Nottinghamshire, formerly Lexington Canada *Lexington, a district in Waterloo, Ontario United States *Lexington, Kentucky, the most populous city with this name *Lexington, Massac ...
. An extension of the Cambridge–Dorchester Line under Mount Auburn Street to Watertown, and thence along the Watertown Branch to Waltham, was also raised as a possibility. A northwards extension from Harvard to the North Cambridge/Arlington border was proposed by Cambridge mayor John D. Lynch in 1933 and by then-freshmen state representative
Tip O'Neill Thomas Phillip "Tip" O'Neill Jr. (December 9, 1912 – January 5, 1994) was an American Democratic Party politician from Massachusetts who served as the 47th speaker of the United States House of Representatives from 1977 to 1987, the third-l ...
in 1936, but was not pursued. The 1945 Coolidge Commission report – the first major transit planning initiative in the region since 1926 – recommended an extension from Harvard to Arlington Heights via East Watertown. The 1947 revision recommended an extension north to Porter Square instead, with branches along the Fitchburg Division to Waltham and the Lexington Branch to Lexington. The 1966 ''Program for Mass Transportation'' by the 1964-created
MBTA The Massachusetts Bay Transportation Authority (abbreviated MBTA and known colloquially as "the T") is the public agency responsible for operating most public transportation services in Greater Boston, Massachusetts. The MBTA transit network in ...
called for an immediate extension to Alewife Brook Parkway via Porter Square, with possible future extensions to Arlington or Waltham. Original plans called for a subway under Massachusetts Avenue to Porter Square, then a surface route along the Fitchburg Route to Alewife. In the late 1960s, the project was expanded to follow the Lexington Branch to a terminal at Route 128. In 1970, Cambridge began advocating for the project, and for the consideration of an all-subway route under Garden Street. That October, then-governor Francis Sargent suspended most highway construction inside Route 128 and created the Boston Transportation Planning Review, which focused on the implementation of new transit routes. In 1972, a new all-subway route via Porter Square and Davis Square was considered (and ultimately chosen). By the mid-1970s, the project was split into two phases: an all-subway extension to Arlington Heights via Alewife, with a later extension to Route 128. Arlington did not wish for Arlington Heights to be even a temporary terminal. In March 1977, Arlington voters rejected the project in a nonbinding referendum, citing fears of increased taxes and congestion. A May 1977 state bill prohibiting extension into Arlington was vetoed by then-governor
Michael Dukakis Michael Stanley Dukakis ( ; born November 3, 1933) is an American politician and lawyer who served as governor of Massachusetts from 1975 to 1979 and from 1983 to 1991. He is the longest-serving governor in Massachusetts history and only the s ...
. The
Environmental Impact Statement An environmental impact statement (EIS), under United States environmental law, is a document required by the 1969 National Environmental Policy Act (NEPA) for certain actions "significantly affecting the quality of the human environment". An E ...
, released in August 1977, primarily evaluated the Arlington Heights terminus but also provided for a shorter Alewife extension. By the time the northwest extension began construction in 1978, opposition in Arlington and reductions in federal funding had caused the MBTA to choose the shorter Alewife alternative. The Red Line was extended temporarily to Harvard–Brattle over former yard and storage tracks on March 24, 1979. This allowed for bus transfers to be provided. The Harvard bus tunnel was closed temporarily at the time. On January 31, 1981, the original
Harvard Harvard University is a private Ivy League research university in Cambridge, Massachusetts, United States. Founded in 1636 and named for its first benefactor, the Puritan clergyman John Harvard, it is the oldest institution of higher lear ...
station was permanently closed, as its demolition was required. To replace it, a temporary station at Harvard–Holyoke was built across the tracks. The two temporary stations were closed on September 2, 1983 in preparation for the opening of the new Harvard station. On September 6, 1983, the new station at Harvard opened, with trains changing direction at Davis Square without carrying passengers. Eliot Yard was demolished;
Harvard Kennedy School The John F. Kennedy School of Government, commonly referred to as Harvard Kennedy School (HKS), is the school of public policy of Harvard University, a private university in Cambridge, Massachusetts. Harvard Kennedy School offers master's de ...
now sits inside its retaining walls. The line was extended to Davis with a station at
Porter Porter may refer to: Companies * Porter Airlines, Canadian airline based in Toronto * Porter Chemical Company, a defunct U.S. toy manufacturer of chemistry sets * Porter Motor Company, defunct U.S. car manufacturer * H.K. Porter, Inc., a locom ...
on December 8, 1984. The line was extended to its current terminus at Alewife on March 30, 1985. At the time, all off-peak trains terminated there, but due to the incomplete construction of a yard at Alewife, only Ashmont trains ran to Alewife during rush hours. Davis was the terminal for rush hour Braintree trains. These trains were finally extended to Alewife during rush hours on December 26, 1985, with the completion of the yard at Alewife. During the expansion, the MBTA pioneered an investment in the "
Arts on the Line Arts on the Line was a program devised to bring art into the Massachusetts Bay Transportation Authority (MBTA) subway stations in the late 1970s and early 1980s. Arts on the Line was the first program of its kind in the United States and became th ...
"
public art Public art is art in any Media (arts), media whose form, function and meaning are created for the general public through a public process. It is a specific art genre with its own professional and critical discourse. Public art is visually and phy ...
program. Fill from the tunnel excavation was used to create Danehy Park on the former site of the Cambridge City Dump, and to restore Russell Field in Cambridge and Magnolia Park in Arlington.


Station renovations

A 1979 renovation of added two elevators, making it the first accessible station on the Red Line. In the early 1980s, the MBTA began extending platforms for six-car trains: and in 1981, in 1982, and and in the mid-1980s. (The Northwest and South Shore extensions had been built for longer trains, while had been modified in 1970.) In the mid-1980s, the MBTA spent $80 million to extend the platforms of seven underground Red Line stations (, , Park Street, Washington, , , and ) and three Orange Line stations. Six-car trains entered service on January 21, 1988. Central, Kendall/MIT, Park Street, and Downtown Crossing (renamed from Washington in 1987) were completed in 1988. A major reconstruction of JFK/UMass added a platform for the Braintree branch, which opened on December 14, 1988. Renovations to Broadway were completed in October 1989. and were accessible by 1989, if not from their original construction. South Station was completed around 1992, followed by Andrew in 1994. The 1990 passage of the
Americans with Disabilities Act The Americans with Disabilities Act of 1990 or ADA () is a civil rights law that prohibits discrimination based on disability. It affords similar protections against discrimination to Americans with disabilities as the Civil Rights Act of 1964, ...
spurred the renovation of additional stations. was modified in 1991, followed by in 1998. Charles/MGH was rebuilt from 2003 to 2007. The agency began design for the four Ashmont branch stations in 2001. Savin Hill was closed from May 2004 to July 31, 2005 for reconstruction. It was followed by the completion of the rebuilt Fields Corner station in 2008, the modified Shawmut in 2009, and the rebuilt Ashmont in 2011. The final Red Line station to be modified for accessibility was , which was closed from January 2018 to August 2019 for a complete reconstruction.


2010s and 2020s

A $255 million project, which started in Spring 2013, replaced structural elements of the Longfellow Bridge, which carries the line across the Charles River between the Charles/MGH and Kendall/MIT stations. The project required at least 25 weekend shutdowns, including temporary relocation of the tracks and a substitute bus shuttle service. All outbound roadway traffic was detoured from the bridge for the three years of construction. The bridge finished construction in May 2018. During the unusually frigid and snowy winter of 2014–15, almost the entire MBTA rail system was shut down on several occasions by heavy snowfalls. The aboveground sections of the Orange and Red lines were particularly vulnerable due to their exposed
third rail A third rail, also known as a live rail, electric rail or conductor rail, is a method of providing electric power to a railway locomotive or train, through a semi-continuous rigid conductor placed alongside or between the rails of a track (r ...
power feed, which iced over during storms. If a single train were stopped due to power loss, other trains behind it soon had to stop as well; without continually running trains pushing snow off the rails, the lines would become quickly blocked by heavy snowfalls. (Because the Blue Line was built with
overhead catenary An overhead line or overhead wire is an electrical cable that is used to transmit electrical energy to electric locomotives, Electric multiple unit, electric multiple units, trolleybuses or trams. The generic term used by the International Union ...
on its surface section due to its exposure to corrosive salt air, it was not as easily disabled by the icing conditions.) During 2015, the MBTA implemented its $83.7 million Winter Resiliency Program, much of which focused on preventing similar vulnerabilities with the Orange and Red lines. The section of the Braintree branch between JFK/UMass and Wollaston had old infrastructure and was largely built on an embankment, rendering it more vulnerable. New third rail with heaters and a different metal composition to reduce wear was installed, along with
snow fence A snow fence, similar to a sand fence, is a barrier that forces windblown, drifting snow to accumulate in a desired place. Snow fences are employed primarily to minimize the amount of snowdrift on roadways and railways. Farmers and ranchers u ...
s and switch heaters. The work required
bustitution A rail replacement bus service uses buses to replace a passenger train service on a temporary or permanent basis. The train service that is replaced may be of any type such as light rail, tram, streetcar, commuter rail, regional rail or heavy r ...
of the line from JFK/UMass to North Quincy on many weeknights. This program did not include work south of Wollaston. In July 2016, the MBTA Fiscal and Management Control Board approved a $18.5 million contract to complete work along the remainder of the southern branches. The project included all remaining third rail replacement, track work between Fields Corner and Savin Hill, signal system work between North Quincy and Braintree, and track replacement at Quincy Center, Quincy Adams, and Braintree. The work was completed in the second half of 2016. On December 10, 2015, a Red Line train in revenue service traveled from to without an operator in the cab before it was stopped by cutting power to the
third rail A third rail, also known as a live rail, electric rail or conductor rail, is a method of providing electric power to a railway locomotive or train, through a semi-continuous rigid conductor placed alongside or between the rails of a track (r ...
. The MBTA initially said that the train appeared to have been tampered with and the incident was not an accident, but later determined operator error to have been the cause. On February 21, 2018, a Red Line train motor failed on approach to Andrew station causing the train to derail. On June 11, 2019, a Red Line train derailed just north of JFK/UMass station, damaging three sheds of signal equipment that control the complex interlockings around the station. The Red Line was limited to 10 trains per hour (instead of the usual 13-14) for several months while repairs were made. The derailment was caused by a broken axle, which had been made brittle by sparks from a faulty grounding component on a motor. Full service resumed on September 25, 2019. Speed restrictions were placed on much of the MBTA subway system in March 2023 due to deteriorated track conditions. Portions of the line were shut down for several periods in 2023–2024 to allow for track work to remove the speed restrictions. A shutdown of the Braintree branch from September 6–29, 2024, was intended to "lay the groundwork" for a future speed increase as well as removing speed restrictions. The branch had been restricted to for several decades, but the MBTA intended to eventually increase some portions to . This would save up to 3 minutes per round trip. , the increase was expected to occur within several days.


Operations and signaling

, both branches were scheduled to operate on 12–13-minute headways during weekday peak hours (with a combined 6-minute headway between Alewife and JFK/UMass) and 12 to 16 minute headways at other times. Fleet utilization ranged from 16 trains (96 cars) on weekends to 20 trains (120 cars) at peak hours. However, rolling stock availability and longer trip times due to slow zones reduced service. By July 2023, headways were 18 minutes on each branch on weekdays and every 22 minutes on weekends. This was improved to 14–16 minute weekday headways and 20–22 minute weekend headways on August 27, 2023. The Ashmont and Harvard branches were both built with automatic block signaling and trip-stop train protection, while the Braintree and Alewife extensions of the 1980s were constructed with
Automatic Train Control Automatic train control (ATC) is a general class of train protection systems for railways that involves a speed control mechanism in response to external inputs. For example, a system could effect an emergency brake application if the driver do ...
(ATC) using audio frequency cab signaling. In 1985 the entire Red Line was converted to the new cab signal standard with any remaining interlocking towers being closed with a relay based centralized traffic control machine being installed in a dispatch office at 45 High Street. This in turn was replaced in the late 1990s with a software-controlled Automatic Train Supervision product by Union Switch & Signal, subcontracted to Syseca Inc. (now ARINC), in a new control room. Subsequent revisions to the system were made internally at the MBTA. Scheduled
headway Headway is the distance or duration between vehicles in a transit system. The ''minimum headway'' is the shortest such distance or time achievable by a system without a reduction in the speed of vehicles. The precise definition varies depending on ...
s were as low as 2 minutes after the 1928 extension to Ashmont. When Stadium station was in use for Harvard football games, headways as low as 1 minutes were used. Ridership peaked around 1947, when passenger counters logged over 850 people per four-car train during peak periods. After the conversion to ATC, throughput in the downtown corridor was 13 trains per hour or a little less than 5 minute headway which gives a maximum capacity of 20,280 passengers per hour. In October 2018, the MBTA awarded a $218 million improved signal contract for the Red and Orange Lines, which will allow 3-minute headways between JFK/UMass and Alewife beginning in 2022. The decreased headway will be achieved through increased vehicle performance, an upgrade of the existing ATC system to use higher performance digital components and a reduction in the length of signaling blocks to 500 feet. During snowstorms, the MBTA runs an empty train during non-service hours to keep the tracks and third rail clear. The Red Line experienced major service disruptions in the winter of 2014–15 due to frozen-over third rails, leaving unpowered trains stranded between stations with passengers on board.


Rolling stock

The Red Line is
standard gauge A standard-gauge railway is a railway with a track gauge of . The standard gauge is also called Stephenson gauge (after George Stephenson), international gauge, UIC gauge, uniform gauge, normal gauge in Europe, and SGR in East Africa. It is the ...
heavy rail Various terms are used for passenger railway lines and equipment; the usage of these terms differs substantially between areas: Rapid transit A rapid transit system is an electric railway characterized by high speed (~) and rapid acceleratio ...
. Trains consist of mated pairs of
electric multiple unit An electric multiple unit or EMU is a multiple-unit train consisting of self-propelled carriages using electricity as the motive power. An EMU requires no separate locomotive, as electric traction motors are incorporated within one or a number o ...
cars powered from a 600 V DC
third rail A third rail, also known as a live rail, electric rail or conductor rail, is a method of providing electric power to a railway locomotive or train, through a semi-continuous rigid conductor placed alongside or between the rails of a track (r ...
. All trains run in six-car sets. All cars are roughly long, wide, and have a platform height of above the top of rail. Rolling stock is maintained at the Cabot Yard in
South Boston South Boston (colloquially known as Southie) is a densely populated neighborhood of Boston, Massachusetts, United States, located south and east of the Fort Point Channel and abutting Dorchester Bay (Boston Harbor), Dorchester Bay. It has under ...
. Yard leads connect to the mainline at Columbia Junction, just north of JFK/UMass station. Trains are also stored at Braintree (Caddigan Yard), Ashmont (Codman Yard), and Alewife. Eliot Yard, on the surface near
Harvard Square Harvard Square is a triangular plaza at the intersection of Massachusetts Avenue (Boston), Massachusetts Avenue, Brattle Street (Cambridge, Massachusetts), Brattle Street and John F. Kennedy Street near the center of Cambridge, Massachusetts, C ...
, served
East Boston Tunnel The Blue Line is a rapid transit line in the Greater Boston metropolitan area, one of four rapid transit lines operated by the Massachusetts Bay Transportation Authority (MBTA). It runs from Bowdoin station in downtown Boston under Boston Har ...
cars for a short time and Red Line cars until it was demolished in the 1970s. (East Boston Tunnel cars accessed the yard through the now-closed Joy Street portal near Bowdoin station and a track connection on the Longfellow Bridge).


1912 Cambridge subway and 1928 Dorchester cars

The Cambridge subway began service in 1912 with 40 all-steel motor cars built by the Standard Steel Car Company, and 20 cars from the Laconia Car Company. They had a novel design as a result of studies about Boston's existing lines, with a then-extraordinary length of over buffers, and a large standee capacity, while weighing only . They had an all-new door arrangement: three single sliding doors per side evenly distributed along the car's length so that the maximum distance to a door was around . Upon their debut, the new subway cars were the largest in the world; they remained so until the Toronto M1 cars were built in 1962. A similar configuration was later adopted by the
BMT BMT or bmt may refer to: Medicine * Bone marrow transplantation, hematopoietic stem cell transplantation Science and technology * 5-hydroxyfuranocoumarin 5-O-methyltransferase, an enzyme * Bangladesh Meteorological Department, the national ...
's Standard cars in New York and the Broad Street Subway cars in Philadelphia. About of the Boston car was separated by a bulkhead for a
smoking Smoking is a practice in which a substance is combusted, and the resulting smoke is typically inhaled to be tasted and absorbed into the bloodstream of a person. Most commonly, the substance used is the dried leaves of the tobacco plant, whi ...
compartment. In contrast to the elevated lines, passenger flowthrough was not intended, and every door was used as both entrance and exit. Thirty-five cars of similar design were added in 1919 from the Pressed Steel Car Company, followed by 60 more in 1928 from the Bradley Car Company for the Cambridge–Dorchester subway.


1963 Pullman cars

The 1912–1928 Cambridge–Dorchester fleet remained in service until 1963, when it was replaced all at once by 92 married-pair cars from
Pullman-Standard The Pullman Company, founded by George Pullman, was a manufacturer of railroad cars in the mid-to-late 19th century through the first half of the 20th century, during the boom of railroads in the United States. Through rapid late-19th century d ...
numbered 01400–01491. These carbon-steel cars were originally delivered in a blue, white and gold paint scheme (the state colors of the
Commonwealth of Massachusetts Massachusetts ( ; ), officially the Commonwealth of Massachusetts, is a U.S. state, state in the New England region of the Northeastern United States. It borders the Atlantic Ocean and the Gulf of Maine to its east, Connecticut and Rhode ...
, which funded their purchase), and retained that color scheme into the early 1980s when most were finally repainted into Red Line colors for the opening of the Alewife Extension. The 01400s (or 1400s) were the last pre-MBTA transit cars and also the last ones built without
air conditioning Air conditioning, often abbreviated as A/C (US) or air con (UK), is the process of removing heat from an enclosed space to achieve a more comfortable interior temperature, and in some cases, also controlling the humidity of internal air. Air c ...
. With delivery of the 1800-series, all cars were retired from passenger service by 1994 due to mechanical and electrical equipment not being able to operate with six-car trains. Cars 01450 and 01455 were sent to the Seashore Trolley Museum in Kennebunkport, Maine for preservation. Four other cars - 01470/01471 and 01480/01481 - remained as Red Line work equipment, but were sidelined after some time and are awaiting disposal.


Aluminum-bodied cars

Three series of older
aluminum Aluminium (or aluminum in North American English) is a chemical element; it has chemical symbol, symbol Al and atomic number 13. It has a density lower than that of other common metals, about one-third that of steel. Aluminium has ...
-bodied cars were built: the 1500 and 1600 series by
Pullman-Standard The Pullman Company, founded by George Pullman, was a manufacturer of railroad cars in the mid-to-late 19th century through the first half of the 20th century, during the boom of railroads in the United States. Through rapid late-19th century d ...
1969–1970 (known as the "No. 1" fleet), and 1700–57 by UTDC in 1988 ("No. 2" fleet). These cars seat 62 to 64 each and approximately 132 cars are in active service , including some of the oldest cars still in regular revenue service on the MBTA system. All cars are painted white with red trim, with manually operated exterior roll signs. Before their overhauls, the 1500 and 1600 series had a brushed aluminum livery with a thin red stripe and were usually called "Silverbird" cars from their natural metal finish. All these cars use traditional DC
traction motor A traction motor is an electric motor used for propulsion of a vehicle, such as locomotives, electric vehicle, electric or hydrogen vehicles, or electric multiple unit trains. Traction (engineering), Traction motors are used in electrically powe ...
s with
electromechanical Electromechanics combine processes and procedures drawn from electrical engineering and mechanical engineering. Electromechanics focus on the interaction of electrical and mechanical systems as a whole and how the two systems interact with each ...
controls manufactured by Westinghouse and can interoperate. The 1500 and 1700 series cars could operate as singles, but in practice are always operated as married pairs. The 1600 series could only operate as married pairs. Originally, the 1500s were double-ended and had two cabs, but were converted to single ended during their midlife overhaul. Headlights are still present on the non-cab ends on the 1500s. The 1700s also have headlights on their non-cab end, but they were built with only one cab.


Stainless steel–bodied cars

The 1800–85 series of
stainless steel Stainless steel, also known as inox, corrosion-resistant steel (CRES), or rustless steel, is an iron-based alloy that contains chromium, making it resistant to rust and corrosion. Stainless steel's resistance to corrosion comes from its chromi ...
–bodied cars was built in 1993–94 by Bombardier from components manufactured in
Canada Canada is a country in North America. Its Provinces and territories of Canada, ten provinces and three territories extend from the Atlantic Ocean to the Pacific Ocean and northward into the Arctic Ocean, making it the world's List of coun ...
and assembled in Barre, Vermont. (This is known as the "No. 3" fleet.) These cars seat 50, and all 86 cars are in active service. An automated stop announcement system provides station announcements synchronized with visual announcements in red
LED A light-emitting diode (LED) is a semiconductor device that emits light when current flows through it. Electrons in the semiconductor recombine with electron holes, releasing energy in the form of photons. The color of the light (corresp ...
signs ceiling-mounted in each car. These cars are stainless steel with red trim, and use yellow
LCD A liquid-crystal display (LCD) is a flat-panel display or other electronically modulated optical device that uses the light-modulating properties of liquid crystals combined with polarizers to display information. Liquid crystals do not em ...
exterior signs. These cars originally had red cloth seats (in contrast to the black leather seats of other cars), but in the early 21st century the cloth seats were replaced with black leather seats. More recently the black leather seats were replaced with vandalism-proof reinforced carpet type seats containing multi-colored patterns, as with the other Red Line stock. They have modern AC traction motors with solid state controls manufactured by
General Electric General Electric Company (GE) was an American Multinational corporation, multinational Conglomerate (company), conglomerate founded in 1892, incorporated in the New York (state), state of New York and headquartered in Boston. Over the year ...
, very similar to the Breda A650 for the
Los Angeles Metro Rail The Los Angeles Metro Rail is an urban rail transit system serving Los Angeles County, California, United States, consisting of six lines: four light rail lines (the A, C, E and K lines) and two rapid transit lines (the B and D lines), ...
, the Bombardier R110B prototype for the
New York City Subway The New York City Subway is a rapid transit system in New York City serving the New York City boroughs, boroughs of Manhattan, Brooklyn, Queens, and the Bronx. It is owned by the government of New York City and leased to the New York City Tr ...
, and the
Washington Metro The Washington Metro, often abbreviated as the Metro and formally the Metrorail, is a rapid transit system serving the Washington metropolitan area of the United States. It is administered by the Washington Metropolitan Area Transit Authority ...
1000 series. They can operate only as mated pairs and can partially interoperate with older cars in emergencies or non-revenue equipment moves, but not in revenue service. In December 2008, the MBTA began running a pair of modified 1800 series cars without seats, in order to increase train capacity. The MBTA became the first transit operator in the United States with heavy rail operations to run cars modified for this purpose. These cars, set 1802–1803, have been designated as "Big Red" cars, denoted by large stickers adjacent to the doors. Automated service announcements at stations alert passengers to the arrival of these high-capacity trains. As of 2018, both Big Red cars have been retrofitted with seats, about half as many as the standard 01800 series cars. Cars 01816 and 01817, out of service since 2004, were donated to the US Coast Guard in November 2021. They were relocated to Otis Air Force Base for training use.


CRRC cars and upgraded signal system

In October 2013, MassDOT announced plans for a $1.3 billion subway car order for the Orange and Red Lines, which would provide 74 new cars to replace the 1500/1600-series cars, with an option to increase the number to 132 to replace the 1700-series cars. On October 22, 2014, the MassDOT Board awarded a $567 million contract to build 132 replacement railcars for the Red Line, as well as additional cars for the Orange Line to a
China China, officially the People's Republic of China (PRC), is a country in East Asia. With population of China, a population exceeding 1.4 billion, it is the list of countries by population (United Nations), second-most populous country after ...
based manufacturer CNR (which became part of
CRRC CRRC Corporation Limited (known as CRRC) is a Chinese state-owned and publicly traded rolling stock manufacturer. It is the world's largest rolling stock manufacturer in terms of revenue, eclipsing its major competitors of Alstom and Siemens. ...
the following year). CRRC will build the new cars at a new manufacturing plant in Springfield at the site of the former New England Westinghouse Company, with initial deliveries of Red Line cars expected in 2020 (Orange Line deliveries began a year earlier) and all cars required to be in service by 2023. The Board forwent federal funding to allow the contract to specify the cars be built in Massachusetts, to create a local railcar manufacturing industry. In conjunction with the new rolling stock, the remainder of the $1.3 billion allocated for the project will pay for testing, signal improvements and expanded maintenance facilities, as well as other related expenses. Sixty percent of the car's components are sourced from the United States. The new cars will hold 15 additional passengers, will have four wheelchair parking areas per car, and will be equipped with on-board
video surveillance Closed-circuit television (CCTV), also known as video surveillance, is the use of closed-circuit television cameras to transmit a signal to a specific place on a limited set of monitors. It differs from broadcast television in that the signal ...
. The cars will have wider doors to allow faster boarding at busy stations, and can allow wheelchair access even if one of a pair of door panels fails to open. The MBTA rebuilt Track 61 to serve as a test track for the new Red Line cars. In December 2016, the MBTA opted to purchase additional identical cars from CRRC, allowing replacement rather than costly refurbishment of the 01800 series cars. The second order is for 120 cars costing $277 million, with an option for 14 additional cars. Combined, the 2014 and 2016 orders will provide a single common fleet for the entire Red Line, with enough cars to eventually run 3-minute headways at peak. Replacement of the signal system is expected to be complete by 2021 on the Red Line; the total cost is $218 million for both the Red and Orange Lines. The first trainset of new cars entered revenue service on December 30, 2020. The cars were taken out of service on March 16, 2021 after a CRRC car on the Orange Line derailed. After investigations were completed, they returned to service in January 2022, at which point an increased number of deliveries was expected during 2022. The cars were pulled from service again in June 2022 after a battery failure; they returned in July 2022. Production delays became apparent in 2019, and then factory shutdowns and staffing limitations caused by the
COVID-19 pandemic The COVID-19 pandemic (also known as the coronavirus pandemic and COVID pandemic), caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2), began with an disease outbreak, outbreak of COVID-19 in Wuhan, China, in December ...
delayed projected final delivery to 2024, with subsequent issues with staffing, supply chain, and delaying expected completion to summer 2025.More new T cars? Not so fast. New Red, Orange Line trains face more delays.
/ref> The CRRC contract specifies a penalty of $500 per car per day of delay after September 2023; as of February 14th 2025, 36 of the red line cars have been delivered with 24 of them in service.


Art and architecture

The MBTA pioneered a "percentage for art"
public art Public art is art in any Media (arts), media whose form, function and meaning are created for the general public through a public process. It is a specific art genre with its own professional and critical discourse. Public art is visually and phy ...
program called
Arts on the Line Arts on the Line was a program devised to bring art into the Massachusetts Bay Transportation Authority (MBTA) subway stations in the late 1970s and early 1980s. Arts on the Line was the first program of its kind in the United States and became th ...
during its Northwest Extension of the Red Line in the late 1970s and early 1980s. Arts on the Line was the first program of its kind in the United States and became the model for similar programs for art across the country. The Kendall/MIT station features an interactive public art installation by Paul Matisse called the ''
Kendall Band The ''Kendall Band'' is a three-part musical sculpture created between 1986 and 1988 by Paul Matisse, who is the grandson of French artist Henri Matisse and stepson of surrealist artist Marcel Duchamp.Christopher Reed"Pure Fabrication". ''Harvard ...
'', which allows the public to activate three sound-producing machines utilizing levers on the wall of the station. Above the tracks at Alewife hangs a series of red neon tubes called '' The End of the Red Line'', by the Boston artists Alejandro and Moira Sina. Many stations built or renovated in the past three decades now feature public art. The MBTA maintains an online catalog of the over 90 artworks installed along its six major transit lines. Each downloadable guide is illustrated with full-color photographs, titles, artists, locations, and descriptions of individual artworks. Newer aboveground stations (particularly Alewife, Braintree, and Quincy Adams, which all have large
parking garage A multistorey car park (Commonwealth English) or parking garage (American English), also called a multistorey, parking building, parking structure, parkade (Canadian), parking ramp, parking deck, or indoor parking, is a building designed fo ...
s) are excellent examples of
brutalist architecture Brutalist architecture is an architectural style that emerged during the 1950s in the United Kingdom, among the reconstruction projects of the post-war era. Brutalist buildings are characterised by Minimalism (art), minimalist constructions th ...
.


Station listing


See also

* Charles Ufford, father of the Dorchester Tunnel plan


References


Further reading

* Cheney, Frank. (2002
''Boston's Red Line: Bridging the Charles from Alewife to Braintree''
Arcadia Publishing.


External links


MBTA – Red Linenycsubway.org – MBTA Red Line
{{DEFAULTSORT:Red Line (Mbta) Standard-gauge railways in the United States 600 V DC railway electrification