Project overview
The project was carried out by Turnkey contractor, Lingkaran Luar Butterworth (Penang) Sdn. Bhd. The main sub-contractors to the Turnkey contractor are Ballast Needam International (left halfway through the project), IJM Construction Sdn. Bhd. in joint venture with Zublin International (Malaysia) Sdn. Bhd. and consists of the following works: * Approach viaducts consisting of twenty-two long precast concrete, post-tensioned, glued segmental spans constructed by the use of an overhead launching gantry. * Two high, reinforced concrete (grade 80 N/mm2) cable stay pylons, with each pylon accommodating 14 pairs of stay cables. * A glued segmental, cable stayed main span constructed by cantilever erection method. * Three precast segmental exit/entry ramps constructed both by the use of an overhead launching gantry and, for some spans, a heavy duty falsework support system. * The dual three lane approaches on either side of the main bridge are wide, the width of the main bridge deck is and the ramp structures are wide. * Other items in the IJM-Zublin JV contract are the supply and erection of parapets, application of anti-carbonation paint and superstructure electrical works.See also
* Penang Second Bridge * Penang BridgeReferences
External links