The Polavaram Project is an under-construction multi-purpose
irrigation
Irrigation (also referred to as watering of plants) is the practice of applying controlled amounts of water to land to help grow crops, landscape plants, and lawns. Irrigation has been a key aspect of agriculture for over 5,000 years and has bee ...
project on the
Godavari River
The Godavari (, Help:IPA/Sanskrit, �od̪aːʋəɾiː is India's second longest river after the Ganges River, Ganga River and drains the third largest Drainage basin, basin in India, covering about 10% of India's total geographical area. It ...
in the
Eluru District
Eluru district is a district in coastal Andhra Region in the Indian state of Andhra Pradesh. With Eluru as its administrative headquarters, it was proposed on 26 January 2022 to become one of the resultant List of districts of Andhra Pradesh, t ...
and
East Godavari District
East Godavari is a district in the Coastal Andhra region of Andhra Pradesh, India. Its district headquarters is at Rajamahendravaram.
Geography
This district is surrounded by:
* North East: Alluri Sitharama Raju district
* North West: Eluru ...
in
Andhra Pradesh
Andhra Pradesh (ISO 15919, ISO: , , AP) is a States and union territories of India, state on the East Coast of India, east coast of southern India. It is the List of states and union territories of India by area, seventh-largest state and th ...
,
India
India, officially the Republic of India, is a country in South Asia. It is the List of countries and dependencies by area, seventh-largest country by area; the List of countries by population (United Nations), most populous country since ...
Central Government of India
The Government of India (ISO: Bhārata Sarakāra, legally the Union Government or Union of India or the Central Government) is the national authority of the Republic of India, located in South Asia, consisting of 36 states and union territor ...
. Its reservoir back water spreads up to the Dummugudem Anicut (i.e. approx back from Polavaram dam on main river side) and approx on the Sabari River side. Thus, back water spreads into parts of
Chhattisgarh
Chhattisgarh (; ) is a landlocked States and union territories of India, state in Central India. It is the List of states and union territories of India by area, ninth largest state by area, and with a population of roughly 30 million, the List ...
and
Odisha
Odisha (), formerly Orissa (List of renamed places in India, the official name until 2011), is a States and union territories of India, state located in East India, Eastern India. It is the List of states and union territories of India by ar ...
Rajamahendravaram
Rajahmundry ( ), officially Rajamahendravaram, is a city in the Indian state of Andhra Pradesh and district headquarters of East Godavari district. It is the fifth most populated city in the state. During British rule, the district of Rajahmu ...
City and from
Rajahmundry Airport
Rajahmundry Airport is a domestic airport serving the city of Rajamahendravaram, Andhra Pradesh, India. It is located at Madhurapudi, north from the city centre, on National Highway 516E (NH-516E). Before modernisation, it was used by Va ...
.
History
In July 1941, the first conceptual proposal for the project was mooted by the
Madras Presidency
The Madras Presidency or Madras Province, officially called the Presidency of Fort St. George until 1937, was an administrative subdivision (province) of British India and later the Dominion of India. At its greatest extent, the presidency i ...
. Diwan Bahadur L. Venkatakrishna Iyer, then Chief Engineer in the Presidency's irrigation department, made the first survey of the project site and made a definitive proposal for a reservoir at Polavaram. Sri Iyer not only envisaged cultivation of over two crop seasons through this project, but also planned for a 40 MW hydroelectric plant within the project. The project, when it was conceived in 1946–47, was estimated to cost Rs 129 crore.
In 1980, Chief Minister of Andhra Pradesh Tanguturi Anjaiah laid the foundation stone for the Polavaram irrigation project. In the year 2004, Y. S. Rajasekhara Reddy performed bhoomi pooja with the estimation cost of 8,261 cr, and the administrative sanction was accorded for construction of right and left canals at a cost of Rs 1,320 crore and Rs 1,353 crore.
Y. S. Rajasekhara Reddy Congress government completed 33% of project before 2014. The Polavaram Project Authority was constituted by the
Union Cabinet
The Union Council of Ministers is the Cabinet (government), principal executive organ of the Government of India, which serves to aid and advise the President of India in execution of their functions.Article 74 of the ''Constitution of India' ...
in May 2014 and the construction of project head works were taken up. The Naidu government acquired the necessary lands for the right canal by solving court petition issues of farmers who lost their agricultural lands from both districts of West Godavari and Krishna; the Pattiseema Lift Irrigation Project has been launched in order to pump the Godavari river water and sent it to the Krishna river. In June, the state was bifurcated under the Andhra Pradesh Reorganisation Act. In December 2017, it was reported that the project contractor, Transstroy, was seeking a deadline extension and a budget escalation. Transstroy was reported to have its ₹4,300 crore loan turn NPA in July 2015. In January 2018, the state government signed a new contract for the project spillway, spill channel, and stilling basin concrete work with Navayuga Engineering. By June 2018, of the required had been acquired. On June 11, 2018, the Polavaram diaphragm wall was completed, marking a significant milestone in the project construction. On January 7, 2019, the Polavaram project entered the
Guinness Book of World Records
''Guinness World Records'', known from its inception in 1955 until 1999 as ''The Guinness Book of Records'' and in previous United States editions as ''The Guinness Book of World Records'', is a British reference book published annually, listi ...
by pouring 32,100 cubic meters of concrete in 24 hours by Navayuga Engineering. The project beat the existing record of 21,580 cubic meters, which was achieved by Abdul Wahid Bin Shabib, RALS Contracting LLC and Alfa Eng. Consultant (all UAE), in Dubai between May 18 and 20 in 2017. The Chief minister of Andhra Pradesh N. Chandrababu Naidu unveiled the first crest gate on 24 December 2018.
Progress
Purpose
The National River-Linking Project, which works under the aegis of the Indian Ministry of Water Resources, was designed to overcome the deficit in water in the country. As a part of this plan, surplus water from the Himalayan rivers is to be transferred to the
peninsular
A peninsula is a landform that extends from a mainland and is only connected to land on one side. Peninsulas exist on each continent. The largest peninsula in the world is the Arabian Peninsula.
Etymology
The word ''peninsula'' derives , . ...
rivers of India. This exercise, with a combined network of 30 river-links and a total length of at an estimated cost of US$120 billion (in 1999), would be the largest infrastructure project in the world. In this project's case, the
Godavari River
The Godavari (, Help:IPA/Sanskrit, �od̪aːʋəɾiː is India's second longest river after the Ganges River, Ganga River and drains the third largest Drainage basin, basin in India, covering about 10% of India's total geographical area. It ...
basin is considered as a surplus one, while the
Krishna River
The Krishna River in the Deccan Plateau, Deccan plateau is the third-longest in India, after the Ganga, Ganga and Godavari. It is also the fourth-largest in terms of water inflows and river basin area in India, after the Ganga, Indus and Godav ...
basin is considered to be a deficit one. As of 2008, 644
tmcft
Tmcft, (Tmc ft), (TMC), (tmc) is the abbreviation of thousand million cubic feet (1,000,000,000 = 109 = 1 billion), commonly used in India in reference to volume of water in a reservoir
or river
A river is a natural stream of fresh wa ...
of underused water from Godavari River flowed into the
Bay of Bengal
The Bay of Bengal is the northeastern part of the Indian Ocean. Geographically it is positioned between the Indian subcontinent and the Mainland Southeast Asia, Indochinese peninsula, located below the Bengal region.
Many South Asian and Southe ...
. But as of 2017, over 3000
tmcft
Tmcft, (Tmc ft), (TMC), (tmc) is the abbreviation of thousand million cubic feet (1,000,000,000 = 109 = 1 billion), commonly used in India in reference to volume of water in a reservoir
or river
A river is a natural stream of fresh wa ...
are drained unused into the Bay of Bengal. Based on the estimated water requirements in 2025, the Study recommended that sizable surplus water was to be transferred from the Godavari River basin to the Krishna River basin.
The capacity of the right and left canals are 17,500
cusec
The cubic foot (symbol ft3 or cu ft) , . is an Dowleswaram Barrage, Godavari Delta water requirements, can be diverted into these canals. Thus the total annual water use capacity of the Polavaram project is 550 tmcft. The water storage available in Sileru river basin is used as usual for the full water requirements of the Godavari Delta.
The
hydropower
Hydropower (from Ancient Greek -, "water"), also known as water power or water energy, is the use of falling or fast-running water to Electricity generation, produce electricity or to power machines. This is achieved by energy transformation, ...
plant (960 MW) will generate 2.29 billion kWh of renewable electricity annually. Polavaram Reservoir will also create the potential to install nearly 158,000 MW of pumped-storage hydroelectric plants in the future.
Alternate site
The dam could not be taken up for construction during the last century on techno-economical grounds. The proposed dam site at Polavaram is located where the river emerges from the last range of the
Eastern Ghats
The Eastern Ghats is a mountain range that stretches along the East Coast of India, eastern coast of the Indian peninsula. Covering an area of , it traverses the states and union territories of India, states of Odisha, Telangana, Andhra Prade ...
into plains covered with deep alluvial sandy strata. At Polavaram, the river width is about . Due to the depth (more than 30 m) of the bedrock at this dam site, the dam project was not found economical to take up. However, a lucrative alternate site is located upstream of the Polavaram site where the river passes through deep gorges of Papi hill range. The width of river is about in the rocky gorge stretch. Thirty years back, this alternative was found to be technologically challenging due to the need to connect the reservoir with the irrigation canals via tunnels across the ghat area. Also, it would need a costly underground hydroelectric station, compared to the riverbed-based hydroelectric station. When the project was actually taken up in the year 2004, the old finalised designs at Polavaram site were adopted without re-examining the latest cost of the upstream alternate site in view of state-of-the-art construction technology of tunnels and underground hydroelectric stations. The progress up to the year 2012 in construction of dam structures and the hydroelectric station is almost nil. The alternate site located in the gorge stretch still merits re-examination to reduce the ever-increasing cost of Polavaram dam.
The spillway and non-overflow dam are founded on Khondalite bedrock in the Polavaram Project. Khondalites, which are feldspar-rich, often contain soft graphite, hard garnet, etc. in addition to other minerals. Khondalites are highly weathered and hence unsuitable at dam sites.
Technical details
The project reservoir has a live storage of 75.2 tmcft at the canal's full supply level of MSL and a gross storage of 194 tmcft, thereby enabling irrigation of (including stabilisation of existing irrigated lands) in
Krishna
Krishna (; Sanskrit language, Sanskrit: कृष्ण, ) is a major deity in Hinduism. He is worshipped as the eighth avatar of Vishnu and also as the Supreme God (Hinduism), Supreme God in his own right. He is the god of protection, c ...
Eluru district
Eluru district is a district in coastal Andhra Region in the Indian state of Andhra Pradesh. With Eluru as its administrative headquarters, it was proposed on 26 January 2022 to become one of the resultant List of districts of Andhra Pradesh, t ...
Visakhapatnam
Visakhapatnam (; List of renamed places in India, formerly known as Vizagapatam, and also referred to as Vizag, Visakha, and Waltair) is the largest and most populous metropolitan city in the States and union territories of India, Indian stat ...
,
Vizianagaram
Vizianagaram, also known as Vijayanagaram, is a city and the headquarters of the Vizianagaram district in the Indian state of Andhra Pradesh. It is located in the Eastern Ghats, about west of the Bay of Bengal and north-northeast of Visakhapa ...
, and
Srikakulam
Srikakulam is a city and the headquarters of Srikakulam district in the Indian state of Andhra Pradesh. census, it has a population of 165,735. There are many other places of Buddhist Tourism such as Salihundam, Kalinga Patnam, Dabbaka Vaan ...
districts of Andhra Pradesh. The silt-free dead storage water of nearly 100 tmcft above the spillway crest level, MSL, can also be used in downstream lift irrigation projects ( Pattiseema lift, Tadipudi lift, Chintalapudi lift, Thorrigedda lift, Pushkara lift, Purushothapatnam lift, Venkatanagaram lift, Chagalnadu lift, etc.) and Dowleswaram Barrage during the summer months. Chintalapudi lift / Jalleru project will supply water to irrigate most of the highlands in
Eluru district
Eluru district is a district in coastal Andhra Region in the Indian state of Andhra Pradesh. With Eluru as its administrative headquarters, it was proposed on 26 January 2022 to become one of the resultant List of districts of Andhra Pradesh, t ...
and NTR districts, including the existing command area under Nagarjunasagar left canal in AP, facilitating 40 tmcft of saved Krishna river water for diversion to
Rayalaseema
Rayalaseema (IAST: ''Rāyalasīma'') is a geographic region in the Indian state of Andhra Pradesh. It comprises four southern districts of the State, from prior to the districts reorganisation in 2022, namely Kurnool, Anantapur, Kadapa, and ...
cusec
The cubic foot (symbol ft3 or cu ft) , . is an Yeleswaram, Yeleru reservoir for feeding Yeleru canal, which is supplying water to Vizag city. Uttarandhra Sujala Sravanthi lift irrigation scheme will also use the Godavari water and a sanction of ₹2,114 crores was made in 2017 for its first phase. All the irrigated lands under these lift schemes can be supplied from Polavaram right and left canals by gravity flow when Polavaram reservoir level is above the canal's full supply level of 41.15 m MSL. However, these lift stations are to be operated every year during the dry season to draw water from the substantial dead storage available behind the floodgates of the Polavaram dam. So these lift schemes will be inoperable for a few years until the Polavaram dam is constructed, but will operate regularly for at least four months in every year. Nearly 80 tmcft of live storage capacity available to Andhra Pradesh in Sileru river basin can also augment the water availability to the Polavaram project during the dry season.
The dam construction involves the building of a 1.5-m-thick concrete
diaphragm wall
A slurry wall is a civil engineering technique used to build reinforced concrete walls in areas of soft earth close to open water, or with a high groundwater table.
This technique is typically used to build diaphragm (water-blocking) walls surro ...
up to depths from 40 to 120 m below the river bed under the earth dam, which is the first of its kind in India. The purpose of diaphragm wall is to stabilize the riverbed to withstanding the water pressure across the dam. The project would constitute an earth-and-rock-fill dam long, a spillway long with 48 vents to enable discharge of of water. The spillway is located on the right bank of the river, for which an approach and spill channels nearly 5.5 km long and 1.0 km wide is envisaged involving nearly 70 million cubic meters of excavation which, is nearly 2/3 of the project's total earthwork. The maximum flood level at Polavaram is MSL and lowest water level is MSL. Two
cofferdam
A cofferdam is an enclosure built within a body of water to allow the enclosed area to be pumped out or drained. This pumping creates a dry working environment so that the work can be carried out safely. Cofferdams are commonly used for constru ...
s are planned, one up to MSL, to facilitate a faster pace of work on the dam to complete the first phase of the project by June 2018. With the cofferdams' inclusion and the bed level of the approach and discharge canals of the spillway increased to MSL, the spillway-related rock excavation is reduced by 70%, leading to substantial cost reduction in the project's headworks cost. Ultimately, the material of cofferdams would be excavated and reused for the peripheral portions of the main earth-and-rock-fill dam. On the left side of the river, 12 water turbines, each having an 80 Megawatt capacity, were to be installed. Without removing the upper and lower coffer dams after the construction of the ECRF dam, the 960 MW hydropower plant cannot be commissioned, as they are blocking the water passages of the powerhouse. The right canal connecting to Krishna River upstream of
Prakasam Barrage
The Prakasam Barrage stretches 1223.5 m across the Krishna River connecting Vijayawada and Guntur district, Guntur districts in Andhra Pradesh, India. The Barrage (dam), barrage serves also as a road bridge and spans over a lake. The three canal ...
( long) discharges at the headworks, and the left canal ( long) discharges of water.Indira Dummugudem lift irrigation scheme starting at is under construction to supply irrigation water for 200,000 acres in Khammam, Krishna,
Eluru
Eluru ( ) is a city and the district headquarters of Eluru district in the States and union territories of India, Indian state of Andhra Pradesh. It is one of the List of municipal corporations in India#Andhra Pradesh, 14 municipal corporations ...
, and West Godavari districts, drawing Godavari River water from the backwaters of Polavaram reservoir. This is a joint project between Andhra Pradesh and
Telangana
Telangana is a States and union territories of India, state in India situated in the Southern India, south-central part of the Indian subcontinent on the high Deccan Plateau. It is the List of states and union territories of India by area, ele ...
states. This project was shelved and merged with another project by the Telangana state.
Financing
The revised cost of the total project including the 960 MW power station is 47,726 crores at 2017-18 prices.
In December 2016,
NABARD
The National Bank for Agriculture and Rural Development (NABARD) is an All India Development Financial Institution (DFI) and an apex Supervisory Body for overall supervision of Regional Rural Banks, State Cooperative Banks and District Central ...
handed over ₹1,981 crores, as part of its loan from the Long Term Irrigation Fund (LTIF) under the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY). NABARD provided a loan of ₹2,981.54 crores during 2016-17 and ₹979.36 crores during 2017-18 under the LTIF to the National Water Development Authority (NWDA) for the project.
In its 2018 budget, Andhra Pradesh allocated ₹9000 crores to the project. In June 2018, the Central Government approved ₹1,400 crores which had been sanctioned in January, but not released, through Extra Budgetary Resources raised by NABARD. These funds were from outside the LTIF.
In January 2018, it was reported that the project cost had escalated to ₹58,319 crore. In June 2018, the Water Ministry sanctioned ₹417.44 crore as grant-in-aid under the Accelerated Irrigation Benefit Programme under the Pradhan Mantri Krishi Sinchayi Yojana (PMKSY) towards the project. By June 2018, ₹13,000 crore had been spent on the project.
An expenditure of ₹16,035.88 crores has been incurred on the project from April 2014 to December 2022. A sum of ₹13,226.04 crores has been released by the centre for the execution of the project since April 2014. Bills amounting to ₹2,390.27 crores were rejected for reimbursement by the Polavaram Project Authority (PPA). Bills amounting to ₹548 crores have been received by the PPA for examination.
Interstate water sharing
As per the inter state agreements dated 4 August 1978 (page 89) and 29 January 1979 (page 101) with Andhra Pradesh, the states of
Karnataka
Karnataka ( ) is a States and union territories of India, state in the southwestern region of India. It was Unification of Karnataka, formed as Mysore State on 1 November 1956, with the passage of the States Reorganisation Act, 1956, States Re ...
and
Maharashtra
Maharashtra () is a state in the western peninsular region of India occupying a substantial portion of the Deccan Plateau. It is bordered by the Arabian Sea to the west, the Indian states of Karnataka and Goa to the south, Telangana to th ...
are entitled to use 21 tmcft and 14 tmcft respectively out of the unallocated waters of Krishna river when Godavari water transferred in a year by Polavaram right bank canal from Polavaram reservoir to Prakasam barrage across Krishna river does not exceed 80 tmcft at 75% dependability. When additional Godavari water exceeding 80 tmcft is transferred from Polavaram reservoir, Karnataka and Maharashtra are entitled to additional water from the unallocated Krishna river waters in the same proportion (i.e. 21:14:45), provided all the following conditions are satisfied.
* The additional Godavari water from Polavaram project should be transferred to the Krishna river upstream of Prakasam barrage. Such additional Godavari water to be shared is decided based on 75% dependability.
* The transferred water shall also displace the water discharges from
Nagarjuna Sagar Dam
Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Nalgonda district in Telangana and Palnadu district in Andhra Pradesh. The dam provides irrigation water to the districts of Kr ...
for the Krishna delta requirements. Krishna delta is the area located down stream of Prakasam barrage which is part of Krishna basin. It does not include adjacent coastal river basins, which are being irrigated by the Krishna waters from the Prakasam barrage.
Thus Andhra Pradesh is entitled to transfer Godavari water in excess of 80 tmcft in three out of four years (below 75% dependability) reducing the water releases from Nagarjunasagar dam for Krishna delta requirements and need not share water with other states beyond 80 tmcft.
The above interstate water sharing agreement does not cover the Godavari water transferred to Krishna river which is not displacing the water releases from the Nagarjunasagar dam for the requirements of Krishna delta. Thus Andhra Pradesh need not share with other states the water transferred via Krishna river or any reservoir located on Krishna river for the water needs of any of its area (including Krishna basin) other than Krishna delta.
Future potential uses
Godavari Penna River linking
To stabilize the existing irrigated ayacut area under Nagarjuna sagar right canal, a new lift project construction with greenfield alignment was started in the first phase of Godavari Penna River linking project by having five step ladder pumping stages and a gravity canals to transfer 7,000 cusecs of Godavari water from Prakasam Barrage back waters into the Nagarjuna sagar right canal near Nekarikallu by utilizing 73 tmcft of Godavari water. With FRL 25M newly created Vykuntapuram Barrage pond will have back waters beyond Pokkunuru up to the toe of Pulichinthala Project. It is more economical to construct first stage pump house of this lift project to lift water from
Prakasam Barrage
The Prakasam Barrage stretches 1223.5 m across the Krishna River connecting Vijayawada and Guntur district, Guntur districts in Andhra Pradesh, India. The Barrage (dam), barrage serves also as a road bridge and spans over a lake. The three canal ...
back waters into newly created Vykuntapuram Barrage pond and the second lift stage from Vykuntapuram Barrage pond to existing K.L Rao sagar / Pulichintala Project and later lift stages from K.L Rao Sagar to
Nagarjuna sagar
Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Nalgonda district in Telangana and Palnadu district in Andhra Pradesh. The dam provides irrigation water to the districts of Kri ...
right canal.It will shorten the length of this lift project canal, Pressure Main and fewer lift stages and also enables the lifting of water up to Srisailam Project via Existing Reversible Reverse turbine pump houses in
Nagarjuna Sagar Dam
Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Nalgonda district in Telangana and Palnadu district in Andhra Pradesh. The dam provides irrigation water to the districts of Kr ...
and Srisailam project. It is even more economical, if we construct a new gravity canal from Ibrahimpatnam to Vykuntapuram Barrage pond to deliver the Polavaram right main canal/ Budameru diversion canal waters directly into the Vykuntapuram barrage pond since canal level is 33 m MSL at Ambapuram hill near
Vijayawada
Vijayawada ( ), formerly known by its colonial name Bezawada, is the second largest city and a major commercial hub in the Andhra Pradesh state of India. The city forms an integral part of the Andhra Pradesh Capital Region and is situated on th ...
. As water supply from Nagarjuna Sagar Left Bank Canal is highly erratic, Muktyala Lift Irrigation scheme is proposed by drawing water from the back waters of Vykuntapuram barrage on left bank of Krishna river.
There is a proposal to link
Nagarjuna Sagar Dam
Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Nalgonda district in Telangana and Palnadu district in Andhra Pradesh. The dam provides irrigation water to the districts of Kr ...
across the
Krishna River
The Krishna River in the Deccan Plateau, Deccan plateau is the third-longest in India, after the Ganga, Ganga and Godavari. It is also the fourth-largest in terms of water inflows and river basin area in India, after the Ganga, Indus and Godav ...
and Somasila Dam across Penna River with 400 km canal as part of national river linking program. With help from the Indian Government, AP Govt can construct a new canal up to Somasila Dam as per DPR of Indian Rivers Inter-link program specifications. Thus the Godavari River water will travel up to Somasila Dam and then Swarnamukhi in Chittoor district via existing Somasila Swarnamukhi link canal. GoAP can also provide water to Tamil Nadu with this Godavari water and retained water in Krishna River (15 TMC allocation of Krishna water to Telugu Ganga) will be used for other projects in
Rayalaseema
Rayalaseema (IAST: ''Rāyalasīma'') is a geographic region in the Indian state of Andhra Pradesh. It comprises four southern districts of the State, from prior to the districts reorganisation in 2022, namely Kurnool, Anantapur, Kadapa, and ...
region.
In future a new massive dam named Palnadu Sagar across hill range near Bollapalle with 700 TMC capacity reservoir is possible using of flood water of Krishna River and Godavari River diverted with this lift project. It will submerge nearly 300Sq KM of land at FRL 260m MSL.Palnadu Sagar spillway with
Francis Turbine
The Francis turbine is a type of water turbine. It is an inward-flow reaction turbine that combines radial and axial flow concepts. Francis turbines are the most common water turbine in use today, and can achieve over 95% efficiency.
The pro ...
will take and release water into Nagarjuna Sagar right canal along with
Hydroelectricity
Hydroelectricity, or hydroelectric power, is Electricity generation, electricity generated from hydropower (water power). Hydropower supplies 15% of the world's electricity, almost 4,210 TWh in 2023, which is more than all other Renewable energ ...
power generation. Flood water of Krishna River will be pumped to Palnadu Sagar. The water stored in Palnadu Sagar will be used for irrigation and drinking in drought years.
Godavari Krishna River linking
Vykuntapuram barrage would be constructed on Krishna river located near in the upstream of Prakasam barrage with FRL at 25m MSL to receive Godavari water diverted from Polavaram dam.
A low level lift canal from the Krishna river located near at 20 m MSL in the downstream of Pulichintala dam will be executed to feed Godavari water diverted from Polavaram Dam to some of the existing command area (situated below 60 m MSL) under Nagarjuna Sagar right bank canal to facilitate extension of Nagarjuna Sagar right bank canal connecting to Kandaleru feeder canal / Somasila reservoir for serving irrigation needs in Prakasam, Potti Sriramulu Nellore and Chittur districts including Chennai drinking water supply. A branch from this lift canal is also extended up to Pulichinthala dam (FRL 53.34 m MSL) to store Godavari water in Pulichintala reservoir during drought years and to irrigate low lands along Krishna river up to Pulichintala dam.
Another high level lift canal from above Krishna river location up to 90 m MSL would be constructed to join
Nagarjuna Sagar tail pond
Nagarjuna Sagar tail pond is a multipurpose reservoir located 21 km downstream from the Nagarjuna Sagar Dam across the Krishna River near Satrasala in Nalgonda district, India. Its gross water storage capacity is 6 Tmcft. The reservoir wat ...
(FRL 75 m MSL) irrigating lands en route along Krishna river in Guntur district. During drought years, the water transferred by this canal to Nagarjuna Sagar tail pond is further lifted to Nagarjuna Sagar and Srisailam reservoirs with the existing pumped storage hydro units for use in all the projects receiving water from these reservoirs. This high level lift canal is an alternative to Dummugudem to Sagar lift canal planned in
Telangana
Telangana is a States and union territories of India, state in India situated in the Southern India, south-central part of the Indian subcontinent on the high Deccan Plateau. It is the List of states and union territories of India by area, ele ...
region which would transfer Godavari river water from Dummugudem to Nagarjuna Sagar tail pond. Ultimately the Polavaram right bank canal would be remodelled to enhance its capacity to 50,000
cusec
The cubic foot (symbol ft3 or cu ft) , . is an Budameru river and Eluru canal to Prakasam barrage pond. The last portion of the Polavaram right bank canal is nothing but Budameru/ Velagaleru flood diversion canal which has flow limitation of 10,000 cusecs. Thus water flow from Polavaram right bank canal to Krishna River can be enhanced by constructing a 25 MW power plant.
Fresh water coastal reservoir
A fresh water
coastal reservoir
A Coastal reservoir is a type of reservoir to store fresh water in a dammed area of a coastal sea near a river delta. Saemangeum Seawall, Saemanguem in South Korea, Marina Barrage in Singapore, Qingcaosha in China, Plover Cove Reservoir, Plover C ...
Tamil Nadu
Tamil Nadu (; , TN) is the southernmost States and union territories of India, state of India. The List of states and union territories of India by area, tenth largest Indian state by area and the List of states and union territories of Indi ...
under interstate rivers linking project This project is similar to Kalpasar Project to store
Narmada River
The Narmada River, previously also known as ''Narbada'' or anglicised as ''Nerbudda'', is the 5th longest river in India and overall the longest west-flowing river in the country. It is also the largest flowing river in the state of Madhya Prade ...
water in
Gulf of Khambhat
The Gulf of Khambhat, also known as the Gulf of Cambay, is a bay on the Arabian Sea coast of India, bordering the state of Gujarat just north of Mumbai and Diu Island. The Gulf of Khambhat is about long, about wide in the north and up to wi ...
sea.
Fresh water
Fresh water or freshwater is any naturally occurring liquid or frozen water containing low concentrations of dissolved salt (chemistry), salts and other total dissolved solids. The term excludes seawater and brackish water, but it does include ...
coastal reservoirs can be established in the shallow sea area by constructing sea dikes / bunds/
causeway
A causeway is a track, road or railway on the upper point of an embankment across "a low, or wet place, or piece of water". It can be constructed of earth, masonry, wood, or concrete. One of the earliest known wooden causeways is the Sweet T ...
up to the depth of 20 meters from the coast line. Water can be pumped from this artificial freshwater lagoon throughout the year for meeting agriculture, etc. needs. Also top surface of the dike can be used as coastal road & rail rout. The proposed dikes would be similar to the
land reclamation
Land reclamation, often known as reclamation, and also known as land fill (not to be confused with a waste landfill), is the process of creating new Terrestrial ecoregion, land from oceans, list of seas, seas, Stream bed, riverbeds or lake ...
of
North Sea
The North Sea lies between Great Britain, Denmark, Norway, Germany, the Netherlands, Belgium, and France. A sea on the European continental shelf, it connects to the Atlantic Ocean through the English Channel in the south and the Norwegian Se ...
area called
Delta Works
The Delta Works () is a series of construction projects in the southwest of the Netherlands to protect a large area of land around the Rhine–Meuse–Scheldt delta from the sea. Constructed between 1954 and 1997, the works consist of dams, slu ...
in
Netherlands
, Terminology of the Low Countries, informally Holland, is a country in Northwestern Europe, with Caribbean Netherlands, overseas territories in the Caribbean. It is the largest of the four constituent countries of the Kingdom of the Nether ...
South Korea
South Korea, officially the Republic of Korea (ROK), is a country in East Asia. It constitutes the southern half of the Korea, Korean Peninsula and borders North Korea along the Korean Demilitarized Zone, with the Yellow Sea to the west and t ...
. The earth bunds / dikes located on sea bed at 20 meters below the sea level, is lesser challenging technically when compared to Saemangeum Seawall project which is having 36 meters average water depth.
The sea area up to 20 meters depth adjacent to
coast
A coast (coastline, shoreline, seashore) is the land next to the sea or the line that forms the boundary between the land and the ocean or a lake. Coasts are influenced by the topography of the surrounding landscape and by aquatic erosion, su ...
line between the locations (near ) where Vashista Godavari, the right side branch of the Godavari river, is joining the sea and the mouth of the Gundlakamma River (near ), is highly suitable for creating the freshwater coastal reservoir. The average width of the sea up to 20 m depth is nearly 16 km wide and the length of the sea dikes is nearly 200 km. The area of the coastal reservoir would be nearly 2900 km2. A barrage would be constructed across the Vashista Godavari river (near ) near Antervedi Pallipalem town. A flood canal (1.5 km long) from this barrage would feed Godavari river water to the coastal reservoir. With 70 tmcft live storage above the full supply level of its canals and another 100 tmcft above the spillway sill level, Polavaram reservoir will assist in moderating the Godavari flood water to make adequate water flow to the coastal reservoir.
The offshore earth dam extending up to 8 m msl high, is in the form of two parallel dikes separated by 1000 meters gap. The main purpose of the twin dikes is to prevent any sea water seepage into the coastal reservoir as its water level is below the sea water level. The water level between the dikes is always maintained at a minimum of 2 m above sea level by pumping fresh water from the coastal reservoir to the 1000 m gap between the dikes. The higher level water barrier between the two dikes eliminates any seawater seepage into the coastal reservoir by establishing freshwater seepage to the sea. The rainwater falling on the coastal reservoir area and runoff water from its catchment area is adequate to cater to the seepage and evaporation losses from the coastal reservoir. The 180 km long, 1000 m gap between the two dikes is also used as deep water mega harbor for shipping, ship breaking, ship building, etc. For shipping purpose, the breakwater outer dike facing the sea is envisaged with few locks fitted with twin gates for access to the open sea. The top surface of the inner dike would serve as access to the mainland from the mega
harbor
A harbor (American English), or harbour (Commonwealth English; see spelling differences), is a sheltered body of water where ships, boats, and barges can be moored. The term ''harbor'' is often used interchangeably with ''port'', which is ...
with rail and road links. The coastal reservoir whose full reservoir water level (FRL) is at 0.0 m msl, would also reduce drastically the cyclone damage and flooding in coastal areas of West Godavari,
Krishna
Krishna (; Sanskrit language, Sanskrit: कृष्ण, ) is a major deity in Hinduism. He is worshipped as the eighth avatar of Vishnu and also as the Supreme God (Hinduism), Supreme God in his own right. He is the god of protection, c ...
,
Guntur
Guntur (), natively spelt as Gunturu, is a city in the States and union territories of India, Indian state of Andhra Pradesh and the administrative headquarters of Guntur district. The city is part of the Andhra Pradesh Capital Region and is lo ...
and Prakasam districts. It would also greatly improve the irrigated coastal land drainage in these districts. The coastal reservoir area can also be used for locating floating solar power plants to generate the needed water pumping power. The dikes are built by
dredging
Dredging is the excavation of material from a water environment. Possible reasons for dredging include improving existing water features; reshaping land and water features to alter drainage, navigability, and commercial use; constructing d ...
sand and clay from the nearby shallow sea bed to reduce the construction cost. Nearly 1850 tmcft of water of Godavari and Krishna flood waters can be utilized for irrigation, etc. requirements with this freshwater coastal reservoir.
Vast lands in the districts of Prakasam,
Nellore
Nellore, also spelt as Nelluru, is a city located on the banks of Penna River, in Nellore district of Andhra Pradesh, India.pumped to the uplands up to 600 m msl across the Seshachalam mountains to irrigate vast area in Chittoor, Cudapah and Ananthapur districts. This gravity canal would also be extended further to transfer 350 tmcft water up to the Kavery river in Tamil Nadu state during South-west monsoon period. The total cost to Andhra Pradesh state would be less than ₹1,00,000 crores which is nearly ₹1,00,000 per acre of newly irrigated lands.
Controversies
The proposed project would displace 276 villages and 44,574 families spread across Andhra Pradesh state mainly. Tribals constitute 50% of such a displaced population. Human rights activists came out against the project because of these reasons. In addition, one activist pointed out that this interlinking of the rivers will harm the interests of the region in the state. Environmental activist Medha Patkar said that the project not only will displace several thousands of families, it will also submerge several
archaeological
Archaeology or archeology is the study of human activity through the recovery and analysis of material culture. The archaeological record consists of Artifact (archaeology), artifacts, architecture, biofact (archaeology), biofacts or ecofacts, ...
sites, coal deposits, a
wildlife sanctuary
A nature reserve (also known as a wildlife refuge, wildlife sanctuary, biosphere reserve or bioreserve, natural or nature preserve, or nature conservation area) is a protected area of importance for flora, fauna, funga, or features of geolog ...
Megalithic
A megalith is a large Rock (geology), stone that has been used to construct a prehistoric structure or monument, either alone or together with other stones. More than 35,000 megalithic structures have been identified across Europe, ranging ...
period burial sites unearthered by AP state archeology officials in 2016 and 12th century temples would also be submerged.
Sixty-four years after the initial conception of the project, the
Government of Andhra Pradesh
The Government of Andhra Pradesh, abbreviated as GoAP, is the Administrative division, state government and the administrative body responsible for the governance of the States of India, Indian state of Andhra Pradesh. Amaravati is the capital ...
secured the environmental clearance from the central agency in 2005. This clearance was obtained after the state government prepared a 4,500 crore forest management plan and rehabilitation and resettlement proposal covering 59,756 hectares that were being lost under the project. In addition, 40,000 was to be allotted for each dwelling to be constructed for the displaced as against 25,000 provided by other states. Despite this clearance, the project faced political roadblocks. The Communist Party of India (M) and
Bharat Rashtra Samithi
The Bharat Rashtra Samithi (; BRS), formerly known as Telangana Rashtra Samithi ( TRS), is an Indian political party which is predominantly active in the state of Telangana and currently the primary opposition party in the state. It was founde ...
were troubled with the issue of submerging agricultural lands by the project.
Meanwhile, work on the project began in April 2006 and was expected to be completed by February 2007. After 30% work of excavation work on the canals and 15% of the spillway works had been completed, the work was halted in May 2006 to seek clearance from the Ministry of Forests and Environment.
The neighbouring state of
Odisha
Odisha (), formerly Orissa (List of renamed places in India, the official name until 2011), is a States and union territories of India, state located in East India, Eastern India. It is the List of states and union territories of India by ar ...
also expressed its concern on the submerging of its land and decided to study this together with the officials from Andhra Pradesh. In response,
Chief Minister of Andhra Pradesh
The chief minister of Andhra Pradesh is the chief executive of the Indian state of Andhra Pradesh. In accordance with the Constitution of India, the governor is a state's ''de jure'' head, but '' de facto'' executive authority rests with the ch ...
Chhattisgarh
Chhattisgarh (; ) is a landlocked States and union territories of India, state in Central India. It is the List of states and union territories of India by area, ninth largest state by area, and with a population of roughly 30 million, the List ...
would be affected by the construction. The problem continued until 2010, when Chief Minister of Odisha
Naveen Patnaik
Naveen Patnaik (; born 16 October 1946) is an Indian politician and writer, who served as the 14th List of Chief Ministers of Odisha, Chief Minister of Odisha from 5 March 2000 to 12 June 2024. His 24-year reign is the List of longest-serving I ...
remained steadfast in his demand for compensation and rehabilitation of tribals of his state who would be displaced due to the submerging of their land.
Odisha and Chhattisgarh have filed a petition in the Supreme Court against the Project which has probability of temporarily submerging large areas of its state and allege that union government are going ahead with the project without the necessary permissions from Environment Ministry. Under section 90 of the Andhra Pradesh Reorganisation Act, 2014, union government has taken the responsibility of taking all clearances and approvals for the project execution and also declared the project as national project. The states also allege that public hearing in the effected areas are not held. Under section 90 (3) of the Andhra Pradesh Reorganisation Act, 2014, Telangana state has already given the approval in all respects to the Polavaram project.
In June 2018, it was reported that Naveen Patnaik, Chief Minister of Odisha had written to the Central Government to halt the Polavaram Project.
Interstate river water disputes
Odisha, Chhattisgarh and Andhra Pradesh entered into an agreement (clause vi of final order, page 80 of original GWDT) which was made part of Godavari Water Disputes Tribunal (GWDT) award. The agreement allows Andhra Pradesh to construct the Polavaram reservoir with full reservoir level (FRL) at 150 feet above the mean sea level (MSL). Odisha approached Supreme Court against the design discharge capacity of the Polavaram dam spillway stating that it should be designed for five million cusecs (cubic feet per second) which is the estimated probable maximum flood (PMF) once in 1000 years duration. Odisha argues that otherwise there would be additional submergence above 150 ft MSL in its territory during peak floods. The recorded maximum flood is 3.0 million cusecs in the year 1986 during the last 115 years.
The projected back water level build-up at Konta due to PMF in Godavari river after construction of the Polavaram project with the designed maximum water level (measured at dam point) shall be cross-checked with the level that can occur at Konta in Sabari basin from the PMF generated in the upstream of Konta when the downstream main Godavari is not under spate. Then only enhanced submergence during the PMF of the Godavari river in Odisha and Chhattisgarh states can be assessed due to the Polavaram dam construction.
The location of Polavaram dam is in the plain area at approximately 10 km downstream from the 50 km long narrow gorge in the Papi Hills. It is also to be ascertained whether the higher backwater level during the PMF in Godavari river is solely due to the presence of long narrow gorge which is acting as a natural dam/barrier or further enhanced by the presence of the downstream Polavaram barrage.
It is purely an academic interest showing concern for the few thousand hectares of farm/forest land submerged by the backwater level build-up once in five hundred or thousand years (against the permitted norm of once in 25 years) without showing concern for the thousands of square kilometers land submerged in the area downstream of the dam with a river flood of magnitude five million cusecs.
Thirty-two years have passed after the GWDT award in 1980, Maharashtra, Odisha and Chhattisgarh have not made serious efforts to harness the major Godavari tributaries such as Sabari River, Indravati River and Pranahita River to utilize the allocated share of Godavari waters. This underutilization of water is the main reason for the very high flood flows at the Polavaram dam site. The vast area in excess of 10,000 square km up to sea are frequently flooded (at least once in a decade) by Godavari floods in Andhra Pradesh by the flood waters originating in Madhya Pradesh, Maharashtra, Odisha and Chhattisgarh states. The land submergence due to the Polavaram dam in Odisha and Chhattisgarh states is a fraction of the Andhra Pradesh area which is affected by the floods in the Godavari River. During the years from 1953 to 2011, Andhra Pradesh suffered nearly 55,800 crore which is 26% of total flood damage in India. It is justified to raise the FRL of Polavaram dam further on this ground alone. One single criterion shall be applied by the tribunals/courts for all the submerged lands whether they are related to reservoir projects construction or due to river floods (i.e. non-utilization of river water). Upstream states shall not take granted that downstream state areas are permitted to be flooded /inundated by the river flood water without offering agreeable relief/comforts.
Odisha and Chhattisgarh entered into an agreement (clause 3e, Annexure F, Page 159 of original GWDT) to construct a Hydro electricity project at Konta / Motu just upstream of the confluence point of Sileru tributary with Sabari River (tri-junction point of Andhra Pradesh, Odisha and Chhattisgarh borders). When this project is constructed, the land submergence would be more than that of Polavaram backwaters. It would be better for Odisha and Chhattisgarh to enter into an agreement with Andhra Pradesh to shift the location of this Hydro electricity project further downstream in Andhra Pradesh territory to harness Sileru river water also for hydroelectricity generation. This joint project of the three states would eliminate the backwaters issue of the Polavaram dam.
The 200 km long stretch of the Sabari river forming boundary between Chhattisgarh and Odisha drops by 2.25 meters per km length on average. This stretch of the river has substantial hydroelectricity generation potential by building medium head (< 20 m) barrages in series to minimize land submergence. The surplus water of Indravati River in Odisha can also be diverted to Sabari river via Jouranala through which Indravati River flood waters naturally overflow into Sabari basin for power generation.
Dispute with Odisha and Telangana
In July 2018, a two-member bench of the Supreme Court asked
Andhra Pradesh
Andhra Pradesh (ISO 15919, ISO: , , AP) is a States and union territories of India, state on the East Coast of India, east coast of southern India. It is the List of states and union territories of India by area, seventh-largest state and th ...
,
Telangana
Telangana is a States and union territories of India, state in India situated in the Southern India, south-central part of the Indian subcontinent on the high Deccan Plateau. It is the List of states and union territories of India by area, ele ...
,
Odisha
Odisha (), formerly Orissa (List of renamed places in India, the official name until 2011), is a States and union territories of India, state located in East India, Eastern India. It is the List of states and union territories of India by ar ...
and
Chhattisgarh
Chhattisgarh (; ) is a landlocked States and union territories of India, state in Central India. It is the List of states and union territories of India by area, ninth largest state by area, and with a population of roughly 30 million, the List ...
governments to frame the issues for arguments.
Telangana said to the court it is in-principle agree for the project but the center should take up study by neutral central institute like CWPRS, Pune to study the impact of Backwater due to increase of 36 lakh cusecs to 50 lakh cusecs of spillway design discharge, it is to ascertain the safety of important temple town like Bhadrachalam, Mining areas and heavy water Plant. Odisha also insisted on backwater studies. The matter is before Supreme court. Proceedings are going on. Supreme Court identified 13 issues to settle the dispute.
Polavaram, Eluru district
Polavaram or Prolavaram is a village in Eluru district of the Indian state of Andhra Pradesh. It is located in Polavaram mandal of Jangareddygudem revenue division at about 35 km away from the banks of Godavari River. The Papi Hills an ...
Water security
The aim of water security is to maximize the benefits of water for humans and ecosystems. The second aim is to limit the risks of destructive impacts of water to an acceptable level. These risks include too much water (flood), too little water (d ...
Sriram Sagar Project
The Sriram Sagar Project is also known as the Pochampadu Project is an Indian flood-flow project on the Godavari. The Project is located in Nizamabad district, 3 km away from National Highway 44. It has been described by The Hindu as a "lif ...
Jalaput Dam
The Jalaput Dam is a hydroelectric dam built on the upper reaches of the Sileru River, which is known locally as Machkund River. The Sileru River is a tributary of the Sabari River, which itself is a tributary of the Godavari River, Godavari. in ...
Nagavali River
The River Nagavali also known as Langulya is one of the main rivers of Southern Odisha and Andhra States in India, between Rushikulya and Godavari River, Godavari basins.
Origin and course
Nagavali River originates from a hill near Lakhbaha ...