Picway Power Plant
   HOME

TheInfoList



OR:

Picway Power Plant was a 220 megawatt ( MW)
coal power plant A coal-fired power station or coal power plant is a thermal power station which burns coal to generate electricity. Worldwide there are about 2,500 coal-fired power stations, on average capable of generating a gigawatt each. They generate ...
located west of Lockbourne in
Pickaway County, Ohio Pickaway County is a County (United States), county in the U.S. state of Ohio. As of the 2020 United States census, 2020 census, the population was 58,539. Its county seat is Circleville, Ohio, Circleville. Its name derives from the Pekowi ban ...
. The plant generated electricity from 1926 until its closure in 2015. It was operated by
American Electric Power American Electric Power Company, Inc. (AEP), (railcar reporting mark: AEPX) is an American domestic electric utility company in the United States. It is one of the largest electric utility companies in the country, with more than five mi ...
(AEP).


History

Picway began operations with two units in September 1926. The plant was operated by the Columbus Railway Power and Light Company, a forerunner of AEP. The two units had a combined capacity of 60 MW. The facility originally used low-profile electric locomotives capable of both third rail and overhead power to move ash cars under the boilers, and move coal around the property; one of these locomotives still exists in operating condition at the Ohio Railway Museum. Construction of Unit 3 was temporarily halted in 1942 by the
War Production Board The War Production Board (WPB) was an agency of the United States government that supervised war production during World War II. President Franklin D. Roosevelt established it in January 1942, with Executive Order 9024. The WPB replaced the Su ...
(WPB) as the building of new non-essential electricity production was suspended for the war effort. Unit 3 officially came online in 1943 with capacity of 30 MW. Unit 4 began commercial operations in 1949 after more than two years of construction at a cost of $5 million. The unit generated 30 MW. The final unit, Unit 5, began commercial operations in 1955 after two years of construction at a cost of $15 million. The unit generated 100 MW and gave Picway a maximum nameplate capacity of 220 MW. Rail service to supply coal for Picway was provided by the Scioto Valley Railway and Power Company which was later renamed the Ohio-Midland Light and Power Company in 1932. The trackage to the plant was initially powered using
third rail A third rail, also known as a live rail, electric rail or conductor rail, is a method of providing electric power to a railway locomotive or train, through a semi-continuous rigid conductor placed alongside or between the rails of a track (r ...
, but became dieselized in 1955. It was the last railroad in Ohio to be powered by third rail. The conversion to diesel allowed coal to be interchanged by rail at Lockbourne, instead of Obetz or Groveport previously. Coal deliveries for Picway were switched from rail to truck beginning in 1972, but rail service resumed temporarily during the Blizzard of 1978 when truck deliveries could not get through the snow.


Environmental mitigation

Electrostatic precipitator An electrostatic precipitator (ESP) is a filterless device that removes fine particles, such as dust and smoke, from a flowing gas using the force of an induced electrostatic charge minimally impeding the flow of gases through the unit. In c ...
s, which are used to prevent
fly ash Coal combustion products (CCPs), also called coal combustion wastes (CCWs) or coal combustion residuals (CCRs), are byproducts of burning coal. They are categorized in four groups, each based on physical and chemical forms derived from coal combust ...
from being released into the atmosphere, were installed at Picway in 1974. A
LO-NOx burner A LO burner is a type of burner that is typically used in utility boilers to produce steam and electricity. Background The first discovery Around 1986 John Joyce (of Bowin Cars fame), an influential Australian inventor, first learned about o ...
was added to Picway in 1995 in order to reduce
nitrogen oxide Nitrogen oxide may refer to a binary compound of oxygen and nitrogen, or a mixture of such compounds: Charge-neutral *Nitric oxide (NO), nitrogen(II) oxide, or nitrogen monoxide * Nitrogen dioxide (), nitrogen(IV) oxide * Nitrogen trioxide (), o ...
() emissions. Picway began generating electricity with
biomass Biomass is a term used in several contexts: in the context of ecology it means living organisms, and in the context of bioenergy it means matter from recently living (but now dead) organisms. In the latter context, there are variations in how ...
and later
biodiesel Biodiesel is a renewable biofuel, a form of diesel fuel, derived from biological sources like vegetable oils, animal fats, or recycled greases, and consisting of long-chain fatty acid esters. It is typically made from fats. The roots of bi ...
in 2010 as a way to lower operating costs and produce renewable energy.


Retirement and closure

Units 1 and 2 were retired in 1972. Units 3 and 4 ceased operations in October 1980 in order for Columbus & Southern Ohio Electric to attain pollution reductions from the Ohio's State Implementation Plan (SIP). The
Ohio Environmental Council The Ohio Environmental Council is an environmental organization founded in 1969. Its work includes the environment, clean energy, and democracy. Environment OEC praised Columbus's Climate Action Plan. OEC jointly sought action against pollutio ...
had argued for an expedited shut down before October 1980, but this was rejected by the
Sixth Circuit Court of Appeals The United States Court of Appeals for the Sixth Circuit (in case citations, 6th Cir.) is a federal court with appellate jurisdiction over the district courts in the following districts: * Eastern District of Kentucky * Western District of K ...
. By 2010, Picway generated electricity only during the peak summer months as a cost-cutting measure. With changes in federal clean air rules by the Environmental Protect Agency (EPA) on the horizon, AEP announced in 2011 they would retire Picway. AEP cited the Cross-State Air Pollution Rule (CSAPR) and Mercury and Air Toxics Standards (MATS) for the retirement of Picway. The power plant closed in May 2015. The facility and land were sold to a real estate company specializing in
brownfield Brownfield is previously-developed land that has been abandoned or underused, and which may carry pollution, or a risk of pollution, from industrial use. The specific definition of brownfield land varies and is decided by policy makers and l ...
redevelopment in 2016.


Incidents

A worker died in 1948 from electrocution after accidentally touching a switch while replacing an oil circuit breaker.


See also

*
List of power stations in Ohio This is a list of electricity-generating power stations in the U.S. state of Ohio, sorted by type and name. In 2022, Ohio had a total summer capacity of 27,447 MW and a net generation of 135,810 GWh. In 2023, the electrical energy g ...


References

{{reflist, 30em Energy infrastructure completed in 1926 Energy infrastructure completed in 1943 Energy infrastructure completed in 1949 Energy infrastructure completed in 1955 Former coal-fired power stations in Ohio Buildings and structures in Pickaway County, Ohio 1926 establishments in Ohio 2015 disestablishments in Ohio American Electric Power