Perla gas field is a giant offshore gas field in the
Gulf of Venezuela The Gulf of Venezuela is a gulf of the Caribbean Sea bounded by the Venezuelan states of Zulia and Falcón and by La Guajira Department, Colombia. The western side is formed by the Guajira Peninsula. A strait connects it with Maracaibo Lake to ...
. It is located south of Gela field, about offshore at the Cardon IV block in water depths about . It covers area about . The field was discovered in 1976. Exploration activities were carried out in 2009. The Pearl-1 well, drilled by the jack-up rig ''Ensco 68'', encountered a hydrocarbon column with a production capacity of about of gas and of gas condensate. Perla-2 produced of gas and of condensate, Perla-3produced of gas and of condensate, and Perla-4 produced of gas and of condensate. In total, it is expected to hold more than of natural gas. At the phase I light offshore platforms will be installed to utilise the wells already drilled. A pipeline will be installed to a central processing facility located onshore. The phase I is expected to cost of US$1.4 billion. The field will be developed by consortium of
Repsol YPF Repsol S.A.
El Nuevo Herald, 2012-05-31
Originally an init ...
(50%) and
Eni Eni is an Italian oil and gas corporation. Eni or ENI may refer to: Businesses and organisations * Escuela Nacional de Inteligencia, the Argentine intelligence academy * Groupe des écoles nationales d’ingénieurs (Groupe ENI), a French engi ...
(50%) . The
front-end loading Front-end loading (FEL), also referred to as Front-End Engineering Design (FEED), Front End Planning (FEP), pre-project planning (PPP), and early project planning, is the process for conceptual development of projects in processing industries such ...
will be carried out by
Foster Wheeler Foster Wheeler AG (formerly Foster Wheeler Inc.) was a Swiss global engineering conglomerate with its principal executive offices in Reading, UK and its registered office in Baar, Canton of Zug, Switzerland. Foster Wheeler was added to the NASD ...
. The field is expected to come onstream by the first half of 2013. The development contract will be in force until 2036.