Panki Thermal Power Station
   HOME

TheInfoList



OR:

Panki Thermal Power Station is located at Panki in
Kanpur Kanpur (Hindustani language, Hindustani: ), originally named Kanhapur and formerly anglicized as Cawnpore, is the second largest city of the Indian States and union territories of India, state of Uttar Pradesh after Lucknow. It was the primary ...
,
Uttar Pradesh Uttar Pradesh ( ; UP) is a States and union territories of India, state in North India, northern India. With over 241 million inhabitants, it is the List of states and union territories of India by population, most populated state in In ...
. Its first stage was commissioned in 1967 by the then
Prime Minister A prime minister or chief of cabinet is the head of the cabinet and the leader of the ministers in the executive branch of government, often in a parliamentary or semi-presidential system. A prime minister is not the head of state, but r ...
,
Indira Gandhi Indira Priyadarshini Gandhi (Given name, ''née'' Nehru; 19 November 1917 – 31 October 1984) was an Indian politician and stateswoman who served as the Prime Minister of India, prime minister of India from 1966 to 1977 and again from 1980 un ...
. It has an installed capacity of 660 Mega Watts. The power plant is owned and operated by
Uttar Pradesh Rajya Vidyut Utpadan Nigam Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) is wholly owned state thermal power utility with present generating capacity of 8114 MW, operating 6 Thermal Power Stations within Uttar Pradesh. UPRVUNL was constituted on dated 25.08. ...
. It has a 275 Metres high chimney which is one of the tallest structures in India


Operations

The plant has been set up in three stages. The stage had two units of 32 megawatts each and it began operation in 1967 both the units ceased operations in 1998. The second stage had two units of 110 megawatts each and began operation in 1977. The machinery for the second stage was from
Bharat Heavy Electricals Limited Bharat Heavy Electricals Limited (BHEL) is an Indian Public Sector Undertakings in India, central public sector undertaking and the largest government-owned electrical/ industrial technology company. It is owned by the Government of Indi ...
. The second stage ceased operations in 2018 and a third stage was planned. The Third Stage is under construction, it will have 1 unit of 660 Mega Watts, its foundation stone was laid by Prime Minister
Narendra Modi Narendra Damodardas Modi (born 17 September 1950) is an Indian politician who has served as the Prime Minister of India, prime minister of India since 2014. Modi was the chief minister of Gujarat from 2001 to 2014 and is the Member of Par ...
in 2019, and it will begin operation by December 2022. The coal to all these units is fed from coal mines of
Bharat Coking Coal Limited Bharat Coking Coal Limited (BCCL) is a subsidiary of Coal India Limited which is inturn under the ownership of Ministry of Coal, Government of India, Its headquarters is located at Dhanbad and Kolkata, India. It was incorporated in January, 197 ...
,
Eastern Coalfields Limited Eastern Coalfields Limited (ECL) is a coal producer based in India. The company was founded in 1975 after nationalisation of coal mines in India. It operates coal mines in Jharkhand and West Bengal states of India. It inherited all the priv ...
by means of
Railways Rail transport (also known as train transport) is a means of transport using wheeled vehicles running in tracks, which usually consist of two parallel steel rails. Rail transport is one of the two primary means of land transport, next to roa ...
.


Future expansion

The state government decided in July 2014 to build a unit of 660 Mega Watts to the power plant. A contract was issued by UPRVUNL to
BHEL Bharat Heavy Electricals Limited (BHEL) is an Indian central public sector undertaking and the largest government-owned electrical/ industrial technology company. It is owned by the Government of India, with administrative control under ...
on EPC basis for construction of 1x660 MW units at Panki on 31 March 2018, with scheduled project completion in December 2022.


See also

* Anpara Thermal Power Station * Obra Thermal Power Station *
Parichha Thermal Power Station Parichha Thermal Power Station is located at Parichha in Jhansi district in the Indian state of Uttar Pradesh, about 25 km from Jhansi on the bank of Betwa river. The power plant is owned and operated by Uttar Pradesh Rajya Vidyut Utpadan ...
*
Harduaganj Thermal Power Station Harduaganj Thermal Power Station is located at Qasimpur Power House Colony which is 1 km distance from Harduaganj railway station at Harduaganj in Aligarh district in the Indian state of Uttar Pradesh, about 18 km from Aligarh and 105 ...


References


JULY 18- DEC – 2018 – EC REPORT PANKI (uprvunl.org)
Kanpur Nagar district Economy of Kanpur Coal-fired power stations in Uttar Pradesh Energy infrastructure completed in 1977 1977 establishments in Uttar Pradesh 20th-century architecture in India {{India-powerstation-stub