The Ohio Department of Transportation (ODOT; ) is the administrative department of the
Ohio state government responsible for developing and maintaining all state and U.S.
road
A road is a thoroughfare used primarily for movement of traffic. Roads differ from streets, whose primary use is local access. They also differ from stroads, which combine the features of streets and roads. Most modern roads are paved.
Th ...
ways outside of municipalities and all
Interstates except the
Ohio Turnpike. In addition to
highway
A highway is any public or private road or other public way on land. It includes not just major roads, but also other public roads and rights of way. In the United States, it is also used as an equivalent term to controlled-access highway, or ...
s, the department also helps develop
public transport
Public transport (also known as public transit, mass transit, or simply transit) are forms of transport available to the general public. It typically uses a fixed schedule, route and charges a fixed fare. There is no rigid definition of whic ...
ation and public aviation programs. ODOT is headquartered in
Columbus, Ohio. Formerly, under the direction of Michael Massa, ODOT initiated a series of interstate-based
Travel Information Centers, which were later transferred to local partners. The Director of Transportation is part of the
Governor's Cabinet.
ODOT has divided the state into 12 regional districts to facilitate development. Each district is responsible for the planning, design, construction, and maintenance of the state and
federal highways in its region.
The department employs nearly 5,000 people and has an annual budget approaching $3 billion.
It celebrated its 100th anniversary in 2005 and its 35th as the Ohio Department of Transportation in 2007.
History
Origins
The "Ohio Department of Highways" began operations on February 15, 1905. The original office consisted of four employees and an annual budget of $10,000. Its mission was to study the state roads and the science of road construction. The Department of Highways created the first
Ohio State Highway Patrol
The Ohio State Highway Patrol is a division of the Ohio Department of Public Safety and has the primary responsibility of traffic enforcement in the U.S. state of Ohio.
Divisions
Operationally, the Patrol is divided into units whose varying task ...
in an attempt to reduce the number of
automobile-related fatalities in 1933. By the end of the year, the first patrolmen were on duty.
Interstate highway era
On June 29, 1956, President
Dwight D. Eisenhower
Dwight David "Ike" Eisenhower (born David Dwight Eisenhower; October 14, 1890 – March 28, 1969) was the 34th president of the United States, serving from 1953 to 1961. During World War II, he was Supreme Commander of the Allied Expeditionar ...
signed the
Federal Aid Highway Act of 1956
The Federal-Aid Highway Act of 1956, also known as the National Interstate and Defense Highways Act, was enacted on June 29, 1956, when President Dwight D. Eisenhower signed the bill into law. With an original authorization of $25 billion (e ...
into law, designating highways for each state to build with
federal assistance to create the modern
interstate highway system
The Dwight D. Eisenhower National System of Interstate and Defense Highways, commonly known as the Interstate Highway System, or the Eisenhower Interstate System, is a network of controlled-access highways that forms part of the National Hi ...
. One year later, in 1957, Ohio's Department of Highways officially began construction on the of the interstate system designated for Ohio in the Federal-Aid Highway Act. After one year of interstate construction, Ohio was spending more on roadway construction than New York or
California
California () is a U.S. state, state in the Western United States that lies on the West Coast of the United States, Pacific Coast. It borders Oregon to the north, Nevada and Arizona to the east, and shares Mexico–United States border, an ...
, and by 1962 had of interstates open. By the end of the decade, Ohio hit a milestone, with over completed.
In 1965 the federal government began to allow new federal funds to be spent on highway beautification projects. The Ohio Department of Highways took a leading role in this national initiative, creating a new Design Services Division to oversee
rest area
A rest area is a public facility located next to a large thoroughfare such as a motorway, Limited-access road, expressway, or highway, at which drivers and passengers can rest, eat, or refuel without exiting onto secondary roads. Other names ...
s and landscaping along thousands of miles of state and interstate roadways in Ohio. To consolidate multiple modes of transportation under one agency, the Ohio Department of Highways officially became the Ohio Department of Transportation in September 1972. In 1984, the Department instituted its first network of tourist information centers at interstate entry points throughout Ohio. Two more milestones were reached during this period, with the full outer belt (
Interstate 270) being completed around Columbus in 1975, as well as
Interstate 70
Interstate 70 (I-70) is a major east–west Interstate Highway in the United States that runs from Interstate 15, I-15 near Cove Fort, Utah, to Interstate 695 (Maryland), I-695 and Maryland Route 570 (MD 570) in Woodlawn, Baltimo ...
traveling east to west through the heart of Ohio in 1976.
Downsizing
In 1995 ODOT began efforts to become more efficient as well as be more customer-friendly. At the time, ODOT employed 7,800 employees. By 2000 the total number of employees had been reduced to 6,031, a 22.6% decrease in 5 years, and further reduced to 5,000 by 2023. This move reduced the increase in payroll expenditures to 0.78% per year. In addition, non-payroll budgets were limited to a 2% annual increase since 1995. Since the Ohio Department of Transportation is managed by separate districts, district budgets were redesigned to allow any operational efficiencies to remain within the district. This allowed each district to reinvest into their roads and bridges, provided they can spend less than their budget. A comprehensive set of measures and objectives have been adopted to oversee each district's performance.
Since downsizing, ODOT has become more efficient in most areas of operation. Between 1997 and 2004, deficiencies were reduced significantly. Bridge structural deficiencies were reduced by 74%,
pavement deficiencies were reduced by 79%, and
guardrail deficiencies were reduced by 70%. In addition, snow and ice removal efforts were improved.
Jobs and Progress plan
On August 5, 2003, Governor
Bob Taft
Robert Alphonso Taft III (born January 8, 1942) is an American politician and attorney who served as the 67th governor of Ohio from 1999 to 2007. A member of the Taft family, Taft political dynasty and Republican Party (United States), Republic ...
unveiled his 10‑year, $5 billion "Jobs and Progress plan", developed to supply $500 million annually to ODOT for new construction and revitalization projects designed to ease freeway congestion, improve road safety, and connect rural Ohio. The plan is also estimated to create over 4,000 highway construction jobs.
One month later, ODOT completed
Interstate 670 in Columbus, marking the completion of the original interstate highway plan in Ohio.
Studies and projects
Ohio's interstate highway system is approaching 50 years old, and many highways are reaching the end of their
designed lives. Commercial truck traffic alone had grown 90% in the last quarter-century and is estimated to grow another 60% by 2020. This forced ODOT to create a statewide plan to address congestion issues as well as the repair of aging interstate highways.
ODOT currently manages 17 major studies or projects, ranging from bridge construction to
intersection
In mathematics, the intersection of two or more objects is another object consisting of everything that is contained in all of the objects simultaneously. For example, in Euclidean geometry, when two lines in a plane are not parallel, their ...
redesign. Major projects generally involve creating greater allowances for traffic flow and easing congestion.
Cleveland Urban Core projects
In August 2000, ODOT began the ''Cleveland
Innerbelt Study'' to develop a comprehensive strategy to rebuild portions of
Interstate 71,
Interstate 77, and
Interstate 90
Interstate 90 (I-90) is an east–west transcontinental freeway and the longest Interstate Highway in the United States at . It begins in Seattle, Washington, Seattle, Washington, and travels through the Pacific Northwest, Mountain states, Mou ...
into downtown
Cleveland
Cleveland is a city in the U.S. state of Ohio and the county seat of Cuyahoga County. Located along the southern shore of Lake Erie, it is situated across the Canada–U.S. maritime border and approximately west of the Ohio-Pennsylvania st ...
. The focus of the project is reducing inner-city congestion, replacing or repairing older sections of the freeway system, and improving the safety of the system. Of particular interest to ODOT is the safety of the Cleveland Innerbelt and
Dead Man's Curve, both of which experience an accident rate higher than the national average. In addition, ODOT plans to construct a new single-tower
cable-stayed bridge
A cable-stayed bridge has one or more ''towers'' (or ''pylons''), from which wire rope, cables support the bridge deck. A distinctive feature are the cables or wikt:stay#Etymology 3, stays, which run directly from the tower to the deck, norm ...
north of the current bridge for westbound traffic on Interstate 90 over the
Cuyahoga River
The Cuyahoga River (see ) is a river located in Northeast Ohio that bisects the City of Cleveland and feeds into Lake Erie.
As Cleveland emerged as a major manufacturing center, the river became heavily affected by industrial pollution, so mu ...
Valley.
Construction was originally planned for 2009, though resistance from some citizens in the community has put the entire project in question. Complaints have been raised over the plan to build the new bridge north of the current span over the Cuyahoga River, mostly due to the effect the construction would have on day-to-day life and the loss of historical buildings and landmarks. In addition, complaints have been raised about the cost of the project, which has been raised from the original $800 million to $1.5 billion. While the cost of the plan is mostly the construction of two new bridges over fifteen years, many in the community feel the rehabilitation of the existing bridges would be more cost-effective. An unofficial estimate for bridge rehabilitation puts the cost at $268 million, or $366 million for the entire
innerbelt project.
Dayton area projects
Interstate 75 through Downtown
Dayton
Dayton () is a city in Montgomery County, Ohio, United States, and its county seat. It is the List of cities in Ohio, sixth-most populous city in Ohio, with a population of 137,644 at the 2020 United States census, 2020 census. The Dayton metro ...
was upgraded and modernized over ten years. Construction included widening Interstate 75 from Neva Drive through
U.S. 35 in Dayton to three through lanes as well as added lanes for exiting. Also, a new interchange at
Route 4 and Interstate 75 was constructed as part of the project. As part of another phase in the project, ODOT modified the U.S. 35 interchange to provide three continuous lanes in each direction on I‑75. All of the phases of this construction will be done at an estimated cost of $533 million. Construction of the last phase was completed in 2016.
On February 26, 2009, the state of Ohio awarded a contract for $22 million to construct an interchange at Austin Boulevard and Interstate 75 in
Springboro, Ohio, in southern Montgomery County. Construction on the interchange began in April 2009 and was completed in July 2010. As part of the project, ODOT reconstructed the intersection of
SR 741 and Miamisburg-Springboro Pike by widening lanes and adding a two-leg Displaced Left Turn (DLT)
continuous flow intersection.
Columbus Crossroads Project
Another large-scale project ODOT is spearheading is the I‑70/I‑71 South Innerbelt Corridor Project, a multifaceted plan to reduce congestion in downtown Columbus along with the convergence of
Interstate 70 and Interstate 71. Commonly known as "the downtown split", the region regularly experiences heavy traffic and is the site of 27% of all traffic accidents along I‑70 and I‑71 in Franklin County. To reduce traffic and accidents, as well as remove the confusion of getting on or off the freeway, the downtown split project will add lanes to the freeway in both directions, widen Mound and Fulton streets, and convert them to one-way,
collector/distributor streets, and move the current on/off-ramps to facilitate better
traffic flow
In transportation engineering, traffic flow is the study of interactions between travellers (including pedestrians, cyclists, drivers, and their vehicles) and infrastructure (including highways, signage, and traffic control devices), with the ai ...
. The project cost around $800 million and began in 2011.
Freeway caps
In addition to freeway construction, ODOT, along with the
Mid-Ohio Regional Planning Commission (MORPC), and the city of Columbus are discussing the possibility of several
freeway caps over portions of I-70 and I-71. These caps, similar to the one built on High Street over I-670, would be widened overpasses, creating a seamless transition between neighborhoods by adding businesses or parks to either side of the current overpass. While this will add considerable cost to the project, it is hoped that the freeway caps will link neighborhoods that were divided when the interstate highway system was put in. Twelve overpasses were originally looked at for freeway caps, though the list has been narrowed to six due to budget constraints. Each cap would cost anywhere between $2 million and $12 million depending on the complexity, and a total of $53 million to $62 million could be added to the project if all six are built. The Ohio Department of Transportation has pledged $10 million toward caps, $37 million for streetscape improvements in total, and the MORPC has pledged another $12 million for the caps. With the caps and other streetscape improvements added to the project, the total project cost is expected to reach $1 billion.
Veterans' Glass City Skyway
In March 2002, ODOT began the largest single project in its history. Needing a replacement for the outdated Craig Memorial Bridge in
Toledo, the department initiated the
Veterans' Glass City Skyway project, with an estimated price tag of $234 million. The six-lane, single-tower
cable-stayed bridge
A cable-stayed bridge has one or more ''towers'' (or ''pylons''), from which wire rope, cables support the bridge deck. A distinctive feature are the cables or wikt:stay#Etymology 3, stays, which run directly from the tower to the deck, norm ...
design includes glass panels along with all four faces of the tower and
LED
A light-emitting diode (LED) is a semiconductor device that emits light when current flows through it. Electrons in the semiconductor recombine with electron holes, releasing energy in the form of photons. The color of the light (corresp ...
s installed within, allowing for customizable lighting effects on the bridge. The original completion date was for May 2006, but the project was struck with a sixteen-month-long delay after an accident killed four workers on February 16, 2004. This delayed the initial opening of the skyway until June 24, 2007.
Northeast Expressway Transformation
The ''Northeast Expressway Transformation (NExT)'' project, which began on June 14, 2004, marked another significant undertaking by ODOT as the largest single highway project ever in central Ohio. It included rebuilding the
State Route 161 interchanges at Interstate 270 and Sunbury Road, including 17 bridges, 18 ramps, and five miles (8 km) of the highway. The original intersections at I-270 and Sunbury Road were designed to handle 58,000 and 21,000 vehicles per day, respectively, but daily loads had surpassed 135,000 at I-270 and 90,000 at Sunbury Road. By 2020 loads are estimated to be approaching 200,000 vehicles per day at both interchanges. To meet and exceed current traffic needs, the project replaced three of the four
cloverleaf ramps at I-270 with two flyover ramps and one "fly under" tunnel, reconfigured the Sunbury Road exit into a modified
single-point urban interchange
A single-point urban interchange (SPUI, or ), also called a single-point interchange (SPI) or single-point diamond interchange (SPDI), is a type of highway interchange. The design was created in order to help move large volumes of traffic th ...
(SPUI), and add through lanes for both I-270 and SR-161. The project was completed in the fall of 2008.
Other studies/projects
Other studies include the ''
Toledo I-75
Interstate 75 (I-75) is a major north–south Interstate Highway System, Interstate Highway in the Great Lakes region, Great Lakes and Southeastern United States, Southeastern regions of the United States. As with most Interstates that end ...
/
I-475 Interchange Study'', the ''North Central Outerbelt Study'' (
I-270), the
Akron
Akron () is a city in Summit County, Ohio, United States, and its county seat. It is the fifth-most populous city in Ohio, with a population of 190,469 at the 2020 census. The Akron metropolitan area, covering Summit and Portage counties, had ...
''Central Interchange Project'' (
I-76). and the ''
U.S. 35 Corridor Major Investment Study (MIS)''.
Department management
The Ohio Department of Transportation currently operates the seventh-largest highway system in the United States and the sixth-largest interstate system measured by total lane-miles. These highways support the fifth-greatest traffic volume by total vehicle miles, the third-greatest value of commercial freight, and contain the second-largest inventory of bridges in the nation as well.
ODOT maintains approximately 49,000
lane-miles of highway system statewide. Included with these highways are over 15,000 bridges and
culvert
A culvert is a structure that channels water past an obstacle or to a subterranean waterway. Typically embedded so as to be surrounded by soil, a culvert may be made from a pipe (fluid conveyance), pipe, reinforced concrete or other materia ...
s, 6,200 on/off ramps, 5,000
stop sign
A stop sign is a traffic sign designed to notify drivers that they must come to a complete stop and make sure the intersection (road), intersection (or level crossing, railroad crossing) is safely clear of vehicles and pedestrians before contin ...
s, 3,400 intersections, and of guardrail.
''(For a complete list of all roads maintained by ODOT, see
List of numbered highways in Ohio.)''
Budget
The 2006/2007 operating budget for the department is forecast at $2.898 billion, with $753 million going towards general operating expenditures and $724 million for new programs funded by the Jobs and Progress Plan. Total revenue is expected to be $1.089 billion from the state and $1.247 billion from the federal government, equaling $2.336 billion. The remainder of the funds is to come from state and federal bonds.
Though ODOT currently plans on a 1% yearly growth in overall revenue through 2015, total expenditures are expected to see no growth through the same period. This is due in large part because the funding from the Jobs and Progress plan will even out to $500 million after 2009.
Bridge inspection
The department runs an annual bridge inspection program as mandated by state law. Statewide, Ohio has 10,348 bridges owned by the state. To maintain all of its bridges, ODOT dedicates a significant portion of its budget to bridge construction and maintenance. For 2008, the department has allocated $239 million toward bridges, with an additional $91 million going towards assisting the bridge projects of counties and cities.
The Ohio Department of Transportation is also responsible for twelve
under-deck truss bridges, the same construction type as the bridge that collapsed in
Minnesota
Minnesota ( ) is a U.S. state, state in the Upper Midwestern region of the United States. It is bordered by the Canadian provinces of Manitoba and Ontario to the north and east and by the U.S. states of Wisconsin to the east, Iowa to the so ...
on August 1, 2007. Of these, six are on the interstate highway system, and four of those are in some stage of replacement.
District management

All 12 districts of the Ohio Department of Transportation are divided into four departments that manage the many facets of state transportation. The planning and programs department is responsible for monitoring the district work program, monitoring department adherence to environmental regulations, ensuring community involvement in transportation decisions, and using budget allocations to select improvement projects. In addition, the department schedules the time frame for improvements and secures the funding needed to design and construct improvements. The production department manages
surveying
Surveying or land surveying is the technique, profession, art, and science of determining the land, terrestrial Plane (mathematics), two-dimensional or Three-dimensional space#In Euclidean geometry, three-dimensional positions of Point (geom ...
, project and bridge design, and traffic. The department also oversees contracting consultants and coordinating
right-of-way and utilities for projects. The principal responsibilities of the highway management department are road maintenance and snow and
ice
Ice is water that is frozen into a solid state, typically forming at or below temperatures of 0 ° C, 32 ° F, or 273.15 K. It occurs naturally on Earth, on other planets, in Oort cloud objects, and as interstellar ice. As a naturally oc ...
removal. Besides these, the department also manages
traffic signal
Traffic lights, traffic signals, or stoplights – also known as robots in South Africa, Zambia, and Namibia – are signaling devices positioned at intersection (road), road intersections, pedestrian crossings, and other locations in order t ...
s, materials testing, bridge inspection, construction contracts,
road sign
Traffic signs or road signs are signs erected at the side of or above roads to give instructions or provide information to road users. The earliest signs were simple wooden or stone milestones. Later, signs with directional arms were introduc ...
s, and highway striping. The final department making up each district of the Ohio Department of Transportation is business and human services. This department is responsible for worker safety programs, labor contract management, personnel administration, accounting, information technology, budget and purchasing management, the operation and maintenance of district-wide facilities.
Highway safety
ODOT measures the traffic volumes on its roadways via automated traffic recorders (ATRs), time-lapse videos, and
piezometric tube counters and then generates a ''Traffic Survey Report''. The majority of sensors exist within the major cities, though more are planned for installation throughout the state.
The department also partners with the Ohio Department of Public Safety to monitor traffic-related crashes. Traffic crash reports are entered into a database that is shared by both departments. This ''Base Transportation Reporting System'' (BTRS) allows ODOT to review the number, frequency, and severity of accidents that occur on its system.
Traffic engineering is then used to establish safety threshold numbers and signal areas of concern for traffic safety.
Statewide Traffic Management Center
The Ohio Department of Transportation currently operates a statewide traffic management center to monitor the highways in the State from a centralized location in Columbus. Dedicated operators monitor each of the major metro areas 24/7 using cameras and speed sensors. The operators post any incidents to OHGO.com as well as the message boards located on the highways. The Traffic Management Center is also responsible for operating the I-90 Variable Speed Corridor in Lake County, as well as the I-670 SmartLane in Columbus.
Snow and ice safety
The Ohio Department of Transportation currently has access to 1,536
snowplow
A snowplow (also snow plow, snowplough or snow plough) is a device intended for mounting on a vehicle, used for removing snow and ice from outdoor surfaces, typically those serving transportation purposes. Although this term is often used to ref ...
s to help maintain good road conditions during winter months and has approximately 2,500 employees available each season for snow and ice removal. In addition to trucks, the department also has 650,000 tons of salt stored at 220 locations statewide. While ODOT spends an average of $24 million per year for winter operations, though most years can use anywhere from 300,000 to 900,000 tons of salt per year.
ODOT now manages a decentralized snow and ice program, giving districts, counties, and snowplow operators a set of guidelines to follow, which can be modified to best assist the area. In prior years, the department issued twelve pages of directives that mandated when and where plows are to be used. This system proved to be inefficient, which helped to bring the new system about.
In 2000 ODOT began installing pavement
sensors
A sensor is often defined as a device that receives and responds to a signal or stimulus. The stimulus is the quantity, property, or condition that is sensed and converted into electrical signal.
In the broadest definition, a sensor is a devi ...
and
Global Positioning System
The Global Positioning System (GPS) is a satellite-based hyperbolic navigation system owned by the United States Space Force and operated by Mission Delta 31. It is one of the global navigation satellite systems (GNSS) that provide ge ...
(GPS) tracking devices, as well as generating computer-modeled snowplow routes to enhance its snow and ice removal program. The
pavement sensors relay valuable information such as pavement and air temperature,
precipitation
In meteorology, precipitation is any product of the condensation of atmospheric water vapor that falls from clouds due to gravitational pull. The main forms of precipitation include drizzle, rain, rain and snow mixed ("sleet" in Commonwe ...
accumulation, and wind speed. By identifying and reporting weather conditions on the highway, the sensors help ODOT prioritize its response and more efficiently clear the roads.
Several pavement sensors currently exist on highways around the state. Data from these sensors is transferred to ODOT's district offices and entered into th
Road and Weather Information System(
RWIS) on the ODOT website. Motorists can track winter weather conditions by accessing
RWIS on the internet.
RWIS also lists winter weather advisories, snow warnings, and highway closures. The information is kept current and is available 24 hours per day.
Computer modeling software is also used to plan plow routes for each county. Data on equipment capabilities, personnel resources, facility locations, and highway types are entered into the system. Highway layouts and the locations of available plows and salt stores are then examined to determine the most effective routes for snowplows and salt spreading equipment.
Global Positioning System (GPS) devices were also installed on ODOT vehicles to help monitor the locations of ODOT equipment. This allows the department to track the exact location of
snow removal
Snow removal or snow clearing is the job of removing snow after a snowfall to make travel easier and safer. This is done both by individual households and by governments institutions, and commercial businesses.
De-icing and anti-icing
De-icin ...
equipment and determine which routes have already been serviced.
See also
*
DriveOhio
* ''
Ohio Manual of Uniform Traffic Control Devices''
References
External links
Ohio Department of Transportation– official ODOT website
OHGO.com– ODOT traffic and roadway information
{{authority control
Transportation in Ohio
State departments of transportation of the United States
Transportation
Transport (in British English) or transportation (in American English) is the intentional Motion, movement of humans, animals, and cargo, goods from one location to another. Mode of transport, Modes of transport include aviation, air, land tr ...
1905 establishments in Ohio