The Freight Route Utilisation Strategy is a
Route Utilisation Strategy in the United Kingdom, published by
Network Rail in March 2007. It is one of only two (the
Network RUS is the other) which have the perspective of the network as whole. It was included in a map published by the
Office of Rail Regulation (ORR) as
established in May 2007. As with other RUSs, the Freight RUS took into account a number of responses to a Draft for Consultation, including those from the ORR.
To quote the foreword:
The study recommended a number of approaches and enhancements to the network. Like other strategies in this series, recommendations are divided into short-term (
Control Period 3, CP3, to March 2009), medium-term (CP4, to March 2014), and long-term (CP5, thereafter).
A notable recommendation is the enhancement of the
loading gauge
A loading gauge is a diagram or physical structure that defines the maximum height and width dimensions in railway vehicles and their loads. Their purpose is to ensure that rail vehicles can pass safely through tunnels and under bridges, and ke ...
from Southampton and the East Anglia coast ports to the West Coast Main Line (WCML), as most growth was expected in the carriage of deep-sea containers and coal for the electricity-generating industry, mainly for the Trent valley and
Aire valley power stations
Aire valley power station may refer to one or all of three power stations on the River Aire in Yorkshire, England:
* Ferrybridge C power station (1966–2016)
* Eggborough power station (1967–2018)
* Drax power station (1974–present)
By t ...
. Much coal is imported via the east coast ports.
A key issue is the loading gauge of routes for freight in sea-going (9' 6" in height, 2500 mm in width) containers. Such loads are accommodated on routes cleared to W10 on standard wagons. W12 is only slightly wider than W10, and the Freight RUS recommended that where structures are renewed the starting assumption should be that they are cleared to W12.
Unlike passenger services, which over the course of a day tend to have comparable flows in both directions, freight movements are unidirectional. Even though rolling stock usually needs to return to the original departure point, this may be via a different route, and constraints arising from fully loaded trains and steep gradients may disappear for returning empty trains.
Recommendations by route
West Coast Main Line (WCML)
Short term: Freight operators' requirements to be included in the December 2008 recasting of the WCML timetable; some services to be rerouted away from
Stafford
Stafford () is a market town and the county town of Staffordshire, in the West Midlands region of England. It lies about north of Wolverhampton, south of Stoke-on-Trent and northwest of Birmingham. The town had a population of 70,145 in t ...
, via
Macclesfield
Macclesfield is a market town and civil parish in the unitary authority of Cheshire East in Cheshire, England. It is located on the River Bollin in the east of the county, on the edge of the Cheshire Plain, with Macclesfield Forest to its east ...
; new loop at
Hartford, Cheshire.
Medium term: Electric haulage of some new freight traffic between
Crewe
Crewe () is a railway town and civil parish in the unitary authority of Cheshire East in Cheshire, England. The Crewe built-up area had a total population of 75,556 in 2011, which also covers parts of the adjacent civil parishes of Willaston ...
/
Warrington and
Carlisle
Carlisle ( , ; from xcb, Caer Luel) is a city that lies within the Northern England, Northern English county of Cumbria, south of the Anglo-Scottish border, Scottish border at the confluence of the rivers River Eden, Cumbria, Eden, River C ...
/
Glasgow; diversion of some services via the
Settle and Carlisle
Settle or SETTLE may refer to:
Places
* Settle, Kentucky, United States
* Settle, North Yorkshire, a town in England
** Settle Rural District, a historical administrative district
Music
* Settle (band), an indie rock band from Pennsylvania
* ' ...
route; W10 and extra capacity between
Peterborough and
Nuneaton
Nuneaton ( ) is a market town in the borough of Nuneaton and Bedworth in northern Warwickshire, England, close to the county border with Leicestershire and West Midlands County.OS Explorer Map 232 : Nuneaton & Tamworth: (1:25 000) : Nuneaton's ...
to provide five additional paths from
Felixstowe to Nuneaton, avoiding the southern part of the WCML.
Long term: Infrastructure to allow the lengthening of container trains serving the Haven ports (see below) from 24 to 30 waggons; major enhancements in the Stafford area and to the Felixstowe to Nuneaton route (the latter to allow more capacity, to avoid the southern WCML).
Anglo-Scottish coal route
This route is from the
Ayrshire
Ayrshire ( gd, Siorrachd Inbhir Àir, ) is a historic county and registration county in south-west Scotland, located on the shores of the Firth of Clyde. Its principal towns include Ayr, Kilmarnock and Irvine and it borders the counties of Re ...
coast and open-cast mines to the Aire and Trent valley power stations. Recommendations are mainly short term, involving redoubling of the Annan-Gretna route and speeding up the junction with the WCML, and signalling enhancements to the Settle and Carlisle route.
Haven ports to the WCML
The Haven ports are Felistowe, Ipswich (F2N), and Harwich.
Short term: Capacity upgrades paid for by
Hutchison Ports UK in return for planning permission for port expansion, including W10 clearance between Ipswich and Doncaster via Peterborough; growth in demand to be accommodated via the
North London Line
The North London line (NLL) is a railway line which passes through the inner suburbs of west, north-west, north, and east London, England between Richmond in the south-west and Stratford in the east, avoiding central London. Its route is a rou ...
(NLL).
Medium term: W10 clearance west of the
East Coast Main Line
The East Coast Main Line (ECML) is a electrified railway between London and Edinburgh via Peterborough, Doncaster, York, Darlington, Durham and Newcastle. The line is a key transport artery on the eastern side of Great Britain running broa ...
(ECML) to Leicester and Nuneaton, together with other capacity enhancements to avoid the southern part of the WCML; also W10 clearance of the
Barking to Gospel Oak line to allow trains from North Thameside to avoid the NLL, leaving more paths for Haven ports trains.
Long term: Infrastructure to allow the lengthening of container trains from 24 to 30 waggons.
East Coast ports to the Aire and Trent Valley power stations
For this purpose the East Coast ports are
Blyth,
Tyneside,
Teesport (Redcar),
Hull
Hull may refer to:
Structures
* Chassis, of an armored fighting vehicle
* Fuselage, of an aircraft
* Hull (botany), the outer covering of seeds
* Hull (watercraft), the body or frame of a ship
* Submarine hull
Mathematics
* Affine hull, in affi ...
and
Immingham
Immingham is a town, civil parish and ward in the North East Lincolnshire unitary authority of England. It is situated on the south-west bank of the Humber Estuary, and is north-west from Grimsby.
The region was relatively unpopulated and un ...
.
Short term: Timetable changes and train lengthening to/from Immingham (already implemented by the time of the RUS publication);
Brigg line and Wrawby junction enhancements; Hull Docks branch partial doubling; restoring of Boldon East curve to provide access to Durham Coast line avoiding congested parts of ECML.
Medium term: A loop on the Killingholme branch line (former
Barton and Immingham Light Railway track) near Immingham; a chord from the Brigg line to
Cottam power station, providing direct access from Immingham; signalling enhancement at
Selby and a loop at nearby
Barlby
Barlby is a linear village in North Yorkshire, England. It is situated to the north-east of the market town of Selby, and is bordered to the west by the River Ouse and to the east by the A19 Barlby bypass. Across the bypass is Barlby's small ...
, allowing lengthening of trains to/from Hull.
Long term: Protection of the route of the mothballed
Leamside line near Tyneside.
Southampton to WCML
Short term: Signalling enhancements on the route from
Leamington to the WCML via Birmingham (this route provides an alternative to the most direct route via
Coventry and Nuneaton).
Medium term: W10 clearance of
* the core route via Eastleigh, Reading West Jct, Leamington and Nuneaton
* the alternative Leamington-WCML route via Birmingham (
Sutton Park line)
* possibly southern diversionary routes via
Melksham and/or Laverstock/
Andover.
Long term: Possible grade separation at Reading West Jct.
Subsequent developments
Projects at various stages
Completed: Annan-Gretna redoubling, Brigg line and Wrawby junction enhancements, partial doubling of the Hull Docks branch.
Funded and authorised to completion: W10 clearance through Ipswich and Peterborough to
Doncaster and Yorkshire terminals (
Doncaster International Railport, Selby Potter Group,
Wakefield Europort
Wakefield Europort is a rail-connected warehousing and industrial estate located to the northeast of Wakefield at junction 31 of the M62 motorway in West Yorkshire, England. It opened in 1996 in anticipation of increased international railfreigh ...
and Leeds Stourton); Settle and Carlisle enhancements, including extra intermediate block signalling; Gospel Oak to Barking W9 and W10 clearance; Hampstead Tunnel W10 clearance.
Authorised to
GRIP
Grip(s) or The Grip may refer to:
Common uses
* Grip (job), a job in the film industry
* Grip strength, a measure of hand strength
Music
* Grip (percussion), a method for holding a drum stick or mallet
* ''The Grip'', a 1977 album by Arthur Bl ...
stage 3, 4 or 5, for implementation in CP4: Peterborough to Nuneaton gauge improvements; Southampton – West Coast Main Line gauge enhancements. Enhancements to North London Line (east of
Camden Road), including signalling enhancements, four-tracking and additional freight loops, are scheduled for implementation also in CP4, probably funded by
Transport for London.
Boldon East curve being pursued for CP4.
DfT's 2007 HLOS
The UK Government's Department for Transport (DfT) published in July 2007 a White Paper 'Delivering a Sustainable Railway',
intended to provide strategic direction for the rail industry. This contained the
High Level Output Specification (HLOS) of funds available, covering the period 1 April 2009 to 31 March 2014, in accordance with a statutory duty set by the Railways Act 2005 to state quinquennially the quantum of public expenditure to be devoted to rail. It specifies what the Government requires the railway to deliver, especially in relation to safety, reliability and capacity.
The White Paper also takes a 30-year view on strategy for the national railway network, emphasising partnership between the Government and the rail industry, and identifying three long-term themes: increasing the capacity of the network, providing a quality and reliable service for passengers, and enhancing rail's environmental potential. It also endorses the Freight RUS, and in Chapter 9, which deals explicitly with freight, moots the development of a Strategic Freight Network going beyond the RUS, but without specific detail.