Mumbai Metro Line 3
   HOME

TheInfoList



OR:

Aqua Line (Line 3) is a
rapid transit Rapid transit or mass rapid transit (MRT) or heavy rail, commonly referred to as metro, is a type of high-capacity public transport that is generally built in urban areas. A grade separation, grade separated rapid transit line below ground su ...
metro line of the
Mumbai Metro The Mumbai Metro is a rapid transit system serving the city of Mumbai and the wider Mumbai Metropolitan Region in Maharashtra, India. While the Maharashtra Metro Rail Corporation Limited is responsible for all metro rail projects being develope ...
in the city of
Mumbai Mumbai ( ; ), also known as Bombay ( ; its official name until 1995), is the capital city of the Indian state of Maharashtra. Mumbai is the financial capital and the most populous city proper of India with an estimated population of 12 ...
,
Maharashtra Maharashtra () is a state in the western peninsular region of India occupying a substantial portion of the Deccan Plateau. It is bordered by the Arabian Sea to the west, the Indian states of Karnataka and Goa to the south, Telangana to th ...
,
India India, officially the Republic of India, is a country in South Asia. It is the List of countries and dependencies by area, seventh-largest country by area; the List of countries by population (United Nations), most populous country since ...
. The route is Mumbai Metro's first underground line with 27 stations, 26 of which are underground stations and one is at-grade. The line will run from Navy Nagar in the far-south of Mumbai to Aarey Depot in the north-centre, and will include connections to other metro lines,
monorail A monorail is a Rail transport, railway in which the track consists of a single rail or beam. Colloquially, the term "monorail" is often used to describe any form of elevated rail or people mover. More accurately, the term refers to the style ...
,
suburban rail Commuter rail or suburban rail is a Passenger train, passenger rail service that primarily operates within a metropolitan area, connecting Commuting, commuters to a Central business district, central city from adjacent suburbs or commuter town ...
,
inter-city rail Inter-city rail services are Express train, express trains that run services that connect cities over longer distances than Commuter rail, commuter or Regional rail, regional trains. They include rail services that are neither short-distance co ...
, and Mumbai's International Airport. Aqua Line is expected to reduce road congestion as well as the load on the Western Line between
Bandra Bandra ( æːɳɖɾa is a coastal suburb located in Mumbai, the largest city of the Konkan division in Maharashtra, India. The area is located to the immediate north of the River Mithi, which separates Bandra from the Mumbai City district. It ...
and
Churchgate Churchgate (Marathi pronunciation: ͡ʃəɾt͡ʃɡeːʈ is an area in the southern part of Mumbai, close to the Arabian Sea. The area is known for its unique architecture consisting of art deco style residential buildings, access to sportin ...
. The project is being implemented, and will be operated, by the Mumbai Metro Rail Corporation Limited (MMRCL). The total cost of this line is estimated at . The project is being funded by five major groups: MMRCL, Padeco,
MMRDA The Mumbai Metropolitan Region Development Authority (MMRDA) is a body of the Government of Maharashtra that is responsible for preparation oRegional Plan for MMRand the infrastructure development of the Mumbai Metropolitan Region. The MMRDA w ...
, CREC, and
JICA The Japan International Cooperation Agency (), also known as JICA'','' is a governmental agency that delivers the bulk of Official Development Assistance (ODA) for the government of Japan. It is chartered with assisting economic and social gro ...
; the last of which provided a
soft loan A soft loan is a loan with a below-market rate of interest. This is also known as ''soft financing''. Sometimes, soft loans provide other concessions to borrowers, such as long repayment periods or interest holidays. Soft loans are usually provi ...
of . The section of the line between
Bandra Kurla Complex The Bandra Kurla Complex is the central business district of the city of Mumbai, the financial capital of India. It is a prominent upscale hub and is considered to be one of the most expensive neighbourhoods in the world. According t ...
and Dharavi stations includes a long twin-tunnel passing under the
Mithi river The Mithi River (Pronunciation: iʈʰiː is a river on Salsette Island, the island of the city of Mumbai, India. It is a confluence of tail-water discharges of the Powai and Vihar lakes. The river is seasonal and rises during the monsoons ...
. One of the tunnels was completed in March 2020. This is the second under-river metro rail tunnel in India after the tunnel underneath the
Hooghly river The Hooghly River (, also spelled ''Hoogli'' or ''Hugli'') is the westernmost distributary of the Ganges, situated in West Bengal, India. It is known in its upper reaches as the Bhagirathi. The Bhagirathi splits off from the main branch of the G ...
on
Kolkata Metro Green Line Green Line, also known as East–West Metro, is a rapid transit metro line of the Kolkata Metro in Kolkata, West Bengal, India. It currently consists of two distinctly operational sections from Salt Lake Sector-V metro station, Salt Lake Sect ...
. The first phase of the project was inaugurated on 5 October 2024 by Prime Minister
Narendra Modi Narendra Damodardas Modi (born 17 September 1950) is an Indian politician who has served as the Prime Minister of India, prime minister of India since 2014. Modi was the chief minister of Gujarat from 2001 to 2014 and is the Member of Par ...
. The ₹14,120 crore BKC to Aarey Jogeshwari-Vikhroli Link Road section of the line. The underground metro line is long, but only a part of it, a stretch, has been completed. It is also called the Colaba-Bandra-Seepz line. The corridor consists of 10 stations. In a major push to boost urban mobility in the region, Prime Minister Modi flagged off a metro service scheduled to run from BKC to Aarey JVLR in the western part of Mumbai. He also took a ride on the metro between BKC and Santacruz stations. Phase 2A of the line stretching from BKC to Acharya Atre Chowk, covering an additional five stations, was inaugurated on 9 May 2025, under the hands of CM
Devendra Fadnavis Devendra Gangadharrao Fadnavis (born 22 July 1970) is an Indian politician who is currently serving as the Chief Minister of Maharashtra since 5 December 2024 with Eknath Shinde and Ajit Pawar as his deputies, and previously held this positi ...
and other officials present. The construction of this metro route faced hurdles from environmentalists and activists lodging numerous
PILs Pils may refer to * Pilsner Pilsner (also pilsener or simply pils) is a type of pale lager. It takes its name from the Bohemian city of Plzeň (), where the world's first pale lager (now known as Pilsner Urquell) was produced in 1842 by Pilsn ...
over cutting of trees in various region accompanied with a larger protest in Aarey over the carshed construction. PILs were either dismissed or did not succeed, as both the
Supreme Court In most legal jurisdictions, a supreme court, also known as a court of last resort, apex court, high (or final) court of appeal, and court of final appeal, is the highest court within the hierarchy of courts. Broadly speaking, the decisions of ...
and the
Bombay High Court The High Court of Bombay is the High courts of India, high court of the States and union territories of India, states of Maharashtra and Goa in India, and the union territory of Dadra and Nagar Haveli and Daman and Diu. It is seated primarily ...
cited the importance of the metro project.


Background

A metro line from Colaba to Bandra was announced in January 2004, as part of a master plan unveiled by the
Mumbai Metropolitan Region Development Authority The Mumbai Metropolitan Region Development Authority (MMRDA) is a body of the Government of Maharashtra that is responsible for preparation oRegional Plan for MMRand the infrastructure development of the Mumbai Metropolitan Region. The MMRDA w ...
(MMRDA). The plan encompassed a total of of track, of which was proposed to be
underground Underground most commonly refers to: * Subterranea (geography), the regions beneath the surface of the Earth Underground may also refer to: Places * Buenos Aires Underground, a rapid transit system * London Underground, a rapid transit system * ...
. The MMRDA unveiled plans for an extended Colaba-Bandra-
SEEPZ Santacruz Electronics Export Processing Zone (SEEPZ) is a Special Economic Zone in Mumbai, India. Situated in the Andheri East area, it is subjected to liberal economic laws as compared to the rest of India to promote rapid economic growth usin ...
metro line in 2011. According to its earlier plans, a metro line from Colaba to Bandra was to be constructed, running underground for from Colaba to
Mahalaxmi Lakshmi (; , , sometimes spelled Laxmi, ), also known as Shri (, , ), is one of the principal goddesses in Hinduism, revered as the Devi, goddess of wealth, fortune, prosperity, beauty, fertility, sovereignty, and abundance. She along with ...
, and then on an elevated track from Mahalaxmi to Bandra. The MMRDA decided to extend the line to the
Chhatrapati Shivaji Maharaj International Airport Chhatrapati Shivaji Maharaj International Airport is the international airport serving Mumbai, the capital of the Indian state of Maharashtra. It is the second-busiest airport in India in terms of total and international passenger traffic a ...
to increase ridership. The Colaba-Bandra-SEEPZ line was estimated to cost , have 27 stations, and would be the city's first fully underground metro line. at
Nariman Point Nariman Point is a prominent downtown area of Mumbai in Maharashtra, India. Located on the southern tip of the Mumbai peninsula, at the end of the Mumbai's Marine Drive, Nariman Point houses some of India's prestigious business headquarters. B ...
, BKC,
MIDC Maharashtra Industrial Development Corporation (MIDC) is a project of the government of Maharashtra state in India and is the leading corporation of Maharashtra. It provides businesses with infrastructure such as land (open plot or built-up spa ...
, SEEPZ, and elsewhere. According to the MMRDA, an underground metro will minimise land acquisition and disturbance to traffic during construction compared to an elevated metro. The Mumbai Metro Rail Corporation Ltd (MMRC), registered under provisions of ''Company Act, 1956'', was constituted as a fully owned company of the MMRDA on 30 April 2008, as per state government directives. On 27 February 2012, the
Central Government A central government is the government that is a controlling power over a unitary state. Another distinct but sovereign political entity is a federal government, which may have distinct powers at various levels of government, authorized or deleg ...
gave in-principle approval to the plan for Aqua Line. In April 2012, the MMRDA announced plans to grant the MMRC increased management autonomy, in an effort to enhance the project's operational efficiency.


Funding

In early 2012, the MMRDA conducted talks with officials at
Chhatrapati Shivaji International Airport Chhatrapati Shivaji Maharaj International Airport is the international airport serving Mumbai, the capital of the Indian state of Maharashtra. It is the second-busiest airport in India in terms of total and international passenger traffic a ...
(CSIA) to finance or construct the line's three stations at the airport and GVK SkyCity, a proposed nearby commercial development."Development body in talks with CSIA"
''The Indian Express''. 14 January 2012. Retrieved 16 January 2012.
Mumbai International Airport Chhatrapati Shivaji Maharaj International Airport is the international airport serving Mumbai, the capital of the Indian state of Maharashtra. It is the second-busiest airport in India in terms of total and international passenger traffic a ...
Limited (MIAL) agreed to bear the cost of constructing the three stations, which was expected to total 777 crore. MIAL was willing to contribute to the metro's construction because of the potential increase in passenger convenience. In 2014, MIAL estimated the cost of developing the metro lines in the airport as 518 crore. MIAL inserted a 'metro component' in the User Development Fee charged at Mumbai Airport from 2016 to February 2023 to raise this amount. The charges of Rs 20 and Rs 120 per domestic and international departure respectively, were levied until the target sum was raised. In August 2012, the Urban Development Ministry rejected the Planning Commission's proposal to implement Aqua Line in a public-private partnership (PPP) mode, having found the mode unsatisfactory for the
Delhi Airport Metro Express The Airport Express Line or Orange Line is a Delhi Metro line from New Delhi to Yashobhoomi Dwarka Sector - 25, linking Indira Gandhi International Airport. The total length of the line is , of which is underground and , from Buddha Jayanti P ...
. The ministry instead proposed a funding pattern with a ratio of 20:80 between the Centre and the State. Of the State equity, 45% was proposed to be through a loan from the
Japan International Cooperation Agency The Japan International Cooperation Agency (), also known as JICA'','' is a governmental agency that delivers the bulk of Official Development Assistance (ODA) for the government of Japan. It is chartered with assisting economic and social gr ...
(JICA). In 2016, JICA commenced providing financial assistance for the project in the form of a soft loan through the MOUD (Ministry of urban development) as a "pass through assistance" at an annual rate of interest of 1.4% (interest free for monies given to consultants). This amounts to for the project. JICA will fund 57.2% of the equity. The soft loan has an interest rate of 1.44%. The other finance will come from the central and state equity of 10.4% each, sub-debt by the central government (4.4%), sub-debt by the state (7%), property development and impact fee (4.3%), stakeholder contribution from the Mumbai International Airport Ltd. (3.4%) and MMRDA grant/aside funding (2.9%). In March 2019, the MMRC managing director Ashwini Bhide stated that the actual completion cost of the project was .


Planning

The Union Cabinet granted clearance to Aqua Line on 27 June 2013. The cabinet also decided to convert Mumbai Metro Rail Corporation (MMRC), the existing state-level special purpose vehicle formed to implement metro projects, into a joint venture company of the state and central governments with equity participation. The MMRC's board consists of five members each from state and central governments. The MMRDA presented their metro line plan to the Brihanmumbai Municipal Corporation on 13 February 2014. Aqua Line was approved by the state cabinet on 26 February 2014. Aqua Line is being implemented through the engineering, procurement and construction (EPC) model. The foundation stone for the project was laid by Chief Minister Prithviraj Chavan in a ''bhoomi pujan'' ceremony at Andheri on 26 August 2014, in the presence of Union Urban Development minister Venkaiah Naidu. The move was described by the media as a cosmetic gesture, as the developers of the project had not yet been decided and actual construction was expected to begin only by December 2014. The date of the ceremony was a few days before the code of conduct for the 2014 State Assembly elections would come into force, which would prohibit the ruling Congress-NCP government from politicising the ceremony. Some citizens protested against the State government at the ground breaking site. They protested the slow implementation and cost escalation of the Mumbai Metro project. Tendering for the project was delayed by the re-organization of the MMRC from a wholly owned entity of the State Government, to a joint venture between the Union and State Governments. Although the State Government received the file for reconstituting the company in October 2013, it gave approval only in July 2014. In December 2014, the MMRC appointed a consortium led by Hong Kong-based
AECOM AECOM (, ; formerly AECOM Technology Corporation; stylised A''Ξ''COM) is an American multinational infrastructure consulting firm headquartered in Dallas, Texas. The company's official name from 1990–2015 was AECOM Technology Corporation, ...
Asia, in a joint venture with Padeco, Japan, LBG Inc. USA and Egis Rail, France as the general consultants for the implementation of the Aqua Line project. The agreement between the two parties was signed on 26 May 2015. On 6 July 2015, the MMRC unveiled a new logo, designed by Design Orb, for the Aqua Line. UPS Madan, Director, MMRC and Metropolitan Commissioner, MMRDA, explained, "The earlier logo was designed with an elevated Metro-3 corridor in mind as was planned originally. The new logo presents the organisation more appropriately as its more relevant, fresh and robust". He also noted that the earlier logo had been designed while the MMRC was owned by the State Government, while it was now a joint venture between the State and the Centre. The MMRC will have to rehabilitate 2,807 families for the project. Most of the families were relocated to
Kurla Kurla (Pronunciation: Help:IPA/Marathi, uɾlaː is a suburb of East Mumbai, India. It is the headquarters of the Kurla taluka of Mumbai Suburban district. The neighbourhood is named after the eponymous Bombay East Indians, East Indian vill ...
and
Chakala Chakala is a locality in the suburb of Andheri in Mumbai. It had a station on the Salsette–Trombay Railway, which was dismantled after the rail line closed down in 1934. It is served by the Western Express Highway and Chakala stations on L ...
. The MMRC also provided free hotel accommodation to people residing in old, dilapidated buildings along the metro corridor that were in danger of collapsing during tunneling work. The majority of such buildings were located in the Girgaum-Kalbadevi belt in South Mumbai. In March 2022, the Government of Maharashtra announced plans to extend Aqua Line southbound from Cuffe Parade, adding one new station – Navy Nagar. The extension would be long, and would cost an additional . In August 2022, the MMRCL invited bids for Detailed Project Reports (DPRs) for the extension.


Bidding

The MMRC called for pre-qualification bids in September 2013. Bidders for the work on tunnels and stations were to submit their bids by 30 October 2013. On 31 January 2014, the bid document was modified and the annual turnover requirement was reduced to "average annual construction turnover of not less than USD 175 million defined as billing for civil infrastructure work completed or in progress over the last five years ending on March 2013". Sanjay Sethi, managing director of MMRC, stated, "The annual turnover requirement must have been set with the idea of attracting specific companies to the project. However, the Japan International Cooperation Agency (JICA) felt that consortia or joint ventures are a combination of management contractors and construction contractors. In all Metro projects, the annual turnover is the starting point for bidding based on which we should not restrict applications. The issue was also raised by several potential bidders." The last date for the submission of pre-qualification bids was extended to 10 March 2014. Fourteen pre-qualification bids were received for the design and construction of underground stations and tunnels for Aqua Line. The 14 bidders were: Afcon-KMB, CEC-ITD Cementation India-TPL, CTCEC-Pan India Infrastructures Pvt Ltd, Dogus-Soma Constructions, IL&FS-CR256 (China Railway), JKumar-CRTG, Larsen & Toubro-STEC, Mosmetrostory-Hindustan Construction Company, OHL-SK Engineering & Construction, Pratibha-GDYT Consortium, Sacyr-CMC-Essar, Salin Impreglio-Gammon, Strabag-AG-Patel Engineering and Unity Infrastructure-IVRCL-CTG. Tenders to construct the car depot at Aarey colony were floated by the MMRC in July 2014. Of the 14 consortia that submitted pre-qualification bids, nine were shortlisted in September 2014. According to Sanjay Sethi, managing director of MMRC, "We have finalised the list of companies eligible for bidding after getting an approval from the Japan International Cooperation Agency (JICA), which is providing more than 50 per cent of funds for the project. The companies that were declared ineligible mostly fell short in technical experience. The tender for construction of Aqua Line received was split into seven packages, each consisting of a long twin tunnel. The tender floated by the MMRC received 31 bids from nine consortiums. The first four packages received 4 bids each, while the next three packages received five, seven and three bids respectively. The nine consortia were AFCONS Infrastructure Ltd. - Kyivmetrobud, Continental Engineering Corporation - ITD Cementation India Ltd -
Tata Projects Tata Projects is an Indian Engineering, procurement, and construction, engineering, procurement and construction company. It is a part of Tata Group. History The company was founded by J. R. D. Tata to create a complete consortium that would tak ...
Ltd, DOGUS - SOMA, IL&FS Engineering and Construction Company Ltd - China Railway 25th Bureau Group Co.Ltd, J.Kumar Infraprojects Ltd - China Railway No.3 Engineering Group Co. Ltd, Larsen & Toubro Ltd/Shanghai Tunnel Engineering Co. Ltd, OSJC Moscow Metrostroy - Hindustan Construction Co.Ltd, Pratibha Industries Ltd - Guandong Yuantian Engineering Co., and Unity Infraprojects Ltd - IVRCL Ltd - China Railway Tunnel Group Co. Ltd. Contracts for all seven packages were awarded by August 2016. Each package costs about and includes around twin tunnels and 5 stations. In January 2017, the MMRC floated tenders worth 328 crore for the construction of the depot, a metro station, work workshop buildings at Aarey Colony and a vehicular underpass along the Marol Maroshi Road, with other allied works. The contract was awarded to New Delhi-based Sam (India) Builtwell Pvt. Ltd. in June 2017. The contract also includes the construction of about of storm water drains, a rain water harvesting system and the diversion of a diameter MCGM water pipeline. Construction is expected to be completed by mid-2020.


Environmental damage and safety issues


Green cover loss and harm to biodiversity

The project will affect 5,012 trees, of which 1,331 will be cut and the remaining 3,681 will re-planted in other parts of the city. Per the terms of the contracts awarded to various consortia, they are in-charge of transplanting affected trees and planting new trees to make up for those cut down. The contract requires consortia to plant three times the number of trees cut down for the project, and maintain them for a period of at least three years. The consortium of
Tata Projects Tata Projects is an Indian Engineering, procurement, and construction, engineering, procurement and construction company. It is a part of Tata Group. History The company was founded by J. R. D. Tata to create a complete consortium that would tak ...
, ITD Cementation and CEC Taiwan, which won the contract to construct package 4, pledged to construct four times more trees than it was required to plant under the contract. The work on package 4, the section between Siddhivinayak Temple and Mahim, required the felling of 150 trees. The consortium pledged that it would plant 2,000 trees instead of the required 450. On 28 February 2017, the MMRC announced that it would donate 25,000 saplings to housing societies, hospitals, and schools located along the metro line. The MMRC stated that the donation was in addition to compulsory tree plantation required by MCGM regulations. In January 2017, the MMRC hired arborist Simon Leong from Singapore to serve as a tree consultant on the project. Leong will provide his services for a six-month period at a rate of $33,000 per month. The MMRC donated 16,000 saplings at 25 different locations under its Project Neighbourhood initiative on 11 April 2017. MMRC Director Ashwini Bhide criticized the controversy over the tree felling required for the project saying that infrastructure could not be built without cutting down trees. Bhide stated that the metro had been designed to minimize the loss of trees, and that 3 times more trees would be planted to make up for the loss. Bhide further explained that the 5,000 trees proposed to be cut for Metro 3 would reduce carbon dioxide by 6,100 kg, while reduction in vehicle usage as a result of Metro 3 would reduce carbon emissions by an estimated 9.9 million kg. Bhide also stated that the MMRC had considered building the depot at Kalina and Kanjurmarg but decided against it due to lack of availability of land and potential legal disputes involving land in the area. On 4 October 2019 after Bombay High Court dismissed the petitions rejecting application for stay on tree cutting at Aarey in the morning.


Threat of flooding

A technical expert committee appointed by the state had reported in May 2015 that if the car shed is built and the land in Aarey is concretised, the excess water during rains will run off into Mithi and flood the Airport and Chakala area since Aarey acts as a catchment area for the Mithi river. The experts, Dr Rakesh Kumar, director, National Environmental Engineering Institute (NEERI) and Dr. Shyam Asolekar, Professor at IIT-Bombay prepared a note on the same and submitted it to the Tree Authority before their meeting to take decision to give permission for felling of trees in September 2019. On 26 May 2025, just days after the line's opening, the Acharya Atre Chowk station platform was flooded due to heavy rains.


Safety issues due to construction

In September 2019, one man died and one injured in an accident in the tunnel shaft. This occurred between the SEEPZ station and the ramp near Aarey Forest (Prajapurpada & Sariput Nagar area). In November 2019, a building (Laxmi Niwas) near the Sitladevi station, sank at least 6mm due to piling and soil excavation work. 25 families had to be evacuated and shifted to temporary shelters in hotels. Residents have suffered and have complained about the cracks that developed due to the construction work. Within one week of this incident, another building, Meher Manzil on LJ road in Mahim, also sank. Sea water has entered the foundation and corroded the pillars. Cracks had developed long before but the sinking of the foundation itself scared the residents and they moved out due to fear. The 120 year old, grade-I heritage structure that serves as the Western Railway Headquarter was reported to be under threat in December 2019 from the regular underground blasts at the Oval Maidan site of the metro. The employees have complained that the frequency of the blasts have increased and the building shakes like a mini earthquake. Architects expressed concern over safety measures and precautions taken by MMRCL.


Legal Issues


Tree conservation

On 9 February 2017, the Bombay High Court issued an interim order prohibiting the MMRDA from cutting trees for the project. The Court was hearing two PILs filed by Mina Verma and Pravin Jehangir. Verma's PIL concerned tree felling in Churchgate, Colaba and Cuffe Parade, and Jehangir challenged the use of public lands for construction of the line. On 10 March 2017, the Court ordered the MMRC to furnish documents proving that it had received necessary clearance from the MoEF to construct the proposed stations of Hutatma Chowk, Churchgate and Cuffe Parade, or documents to prove that no clearances were required. The order was in response to the petitioner's claim that the MoEF had rejected the MMRC's request to construct the three stations. The MMRC responded that no clearance was required to construct the stations. On 16 March, the Court issued a notice to the MoEF asking it to clarify whether it had granted clearance to the MMRC to construct nine stations. The petitioner had pointed out that all nine stations fell under the Coastal Regulatory Zones II and III. On 12 April, the MMRDA filed its reply to petition declaring that the State Environment Impact Assessment Authority (SIEAA) had granted it permission to construct stations in Coastal Regulation Zone (CRZ) areas. The court directed the MMRDA and MMRC to submit all relevant supporting documents by 24 April. On 3 May, the Bombay High Court declared that the metro was crucial to ease traffic congestion in Mumbai. However, the court reserved its stay on tree felling stating that it would consider "what is more important - life of a human being or the life of tree". On 5 May, the High Court vacated its stay on tree felling for Metro 3. The Court declared that Metro 3 would help improve the environment and the socio-economic conditions of the city. It also observed that a balance had to be found between environmental protection and development, and that taking a "harsh stand, which the petitioners want" would make it "impossible to conduct development work". On 8 May, the petitioners filed a special leave petition (SLP) in the Supreme Court challenging the High Court ruling. On 15 May 2017, the Supreme Court issued a stay on tree felling for the project until 18 May.


Aarey land issue

In 2015, the state government announced plans to construct the metro depot, where metro coaches will be parked, on an 81-acre plot of land in Aarey Colony. Authorities also intended to construct a labour camp for construction workers and a centralised operation control centre for the entire Mumbai Metro network at Aarey Colony. The construction would require the felling of more than 2,000 trees in the area. Environmental groups Vanashakti and Aarey Conservation Group (ACG) filed a petition with the National Green Tribunal (NGT) in January 2015 requesting that the Aarey Colony be protected as a no-development zone. On 5 December 2016, the Union Environment Ministry issued a notification declaring the area up to 4 km from the boundary of the Sanjay Gandhi National Park to be an eco-sensitive zone. The notification excluded 165 hectares of land in Aarey, in order to permit the construction of Aqua Line. However, the notification declared that the exclusion was sub-ordinate to any orders from the judiciary or the NGT. The NGT's Pune bench passed an order temporarily staying all construction activities in Aarey on 19 December 2016. On 5 January 2017, the NGT granted an exemption permitting the MMRC to construct a casting yard on a 3-hectare plot of land owned by the State Government in Aarey. A tribunal bench ordered the forest department to provide a detailed map of Aarey Colony, and to declare whether any portion of the region had been identified as forests. In 1997, as part of a Supreme Court directive, State Governments had prepared a detailed map of
urban forest Urban means "related to a city". In that sense, the term may refer to: * Urban area, geographical area distinct from rural areas * Urban culture, the culture of towns and cities Urban may also refer to: General * Urban (name), a list of peop ...
cover. The forest department failed to provide the details at the next hearing, and on 17 February 2017, the NGT extended its stay on all construction activities up to 17 March 2017. On 29 March, the state forest department informed the NGT that 1,279.74 ha of land at Aarey had been used for non-forest activities since 1949, and therefore "cannot be declared a forest land because it is not a forest". The department clarified that although 1,114.74 ha of land had been declared as an eco-sensitive zone (ESZ) by the Union environment ministry on 5 December 2016, the notification excluded the land given to the MMRC and certain other areas. The department also stated that it would submit a list of survey numbers identifying Aarey as a non-forest area at the NGT's next hearing on 10 April. At the hearing on 10 April, the forest department stated that it was unable to locate its report on Aarey that would help prove that it was not "forest land", and requested an extension. The request was denied by the NGT. On 24 April, the Tribunal ordered the additional solicitor general to appear before it on 3 May and clarify the MoEF's position on approval for Metro 3. Due to the issues surrounding the land at Aarey, Larsen & Toubro and Shanghai Tunnel Engineering Co., the consortium that was awarded the seventh package to carry out construction on the MIDC-Aarey Depot section of the line, exited the contract. The MMRC stated that the appointment of a new contractor would escalate the project cost by an addition . The Court stated that it would determine if the cutting of nearly 5,000 trees for the project was necessary. On 18 February 2017, Fadnavis directed the MMRDA to consider constructing the depot at Kanjurmarg or Kalina. A few weeks later, MMRC officials stated that the proposed depot could not be built at Mumbai University land in Kalina because the available area was too small. The MMRC insisted that the depot should be built at Aarey, but proposed a new design which would allow the depot to be construct on 25 hectares of land as compared to the 33 hectares required by the old design. The new design will reduce the number of trees to be cut by 1,000. In March 2017,
E. Sreedharan Elattuvalapil Sreedharan (born 12 June 1932) is an Indian engineer and politician from the Indian state of Kerala. He is credited with changing the face of public transport in India with his leadership in building the Konkan Railway and the De ...
wrote to Chief Minister Fadnavis requesting him to ensure clearance for proposed metro depot at Aarey. Sreedharan wrote, "Metro projects are environmentally most friendly and setting up a carshed in Aarey is not going to be a threat either to the government or to the eco system. The main objection would be against cutting of trees, for which
compensatory afforestation Compensatory Afforestation (CA) is defined as the process of afforestation, and associated regeneration activities are done to compensate for destroyed forest land that has been diverted to non-forest activities. In this context, non-forest acti ...
on a liberal scale can be insisted upon." According reports in the media, the MMRC brought machinery to conduct soil testing work for constructing ramps in Aarey on 23 March. However, local business owners protested the work, alleging that the NGT had stayed all construction activities in Aarey. The MMRC stated that the stay only applied to construction of the car depot, and not the ramps. Due to the protests, contractors removed all machinery from the site on 25 March 2017. MMRC began soil testing at Aarey on 30 March 2017, under police protection. The work area was cordoned off and surrounded by 50 Mumbai Police personnel. On 16 April 2019, the Supreme Court rejected a petition filed the Aarey Conservation Group, a non-government organisation, seeking an alternative site to construct the depot. The Court observed that the MMRC had already considered alternate options and deemed them unviable. A separate petition filed by the same NGO, which had been dismissed by the Bombay High Court in October 2018, is still pending before the Supreme Court. On 4 October 2019, Bombay High Court dismissed the petitions rejecting application for stay on tree cutting at Aarey in the morning. On 7 October 2019, the Supreme Court stayed the tree cutting and ordered to maintain status quo until further notice. On 29 November 2019 a day after
Uddhav Thackeray Uddhav Bal Thackeray (Marathi pronunciation: d̪ʱːəʋ ʈʰaːkɾeː born 27 July 1960) is an Indian politician who served as the 19th Chief Minister of Maharashtra from 2019 to 2022 and the Leader of the House, Maharashtra Legislative Ass ...
became Chief Minister of Maharashtra, he put a stay on car shed work. Uddhav Thackeray then on 11 December 2019 appointed a committee to explore an alternative location for the shed. On 29 January 2020, the committee after studying suggested to lift the stay as they found no viable alternatives for car shed saying that MMRCL's arguments were valid. In July 2022, when the new government came under the leadership of
Eknath Shinde Eknath Sambhaji Shinde (born 9 February 1964) is an Indian politician who has served as the List of deputy chief ministers of Maharashtra, Deputy Chief Minister of Maharashtra since December 2024, alongside Ajit Pawar under Devendra Fadnavis. ...
-
Devendra Fadnavis Devendra Gangadharrao Fadnavis (born 22 July 1970) is an Indian politician who is currently serving as the Chief Minister of Maharashtra since 5 December 2024 with Eknath Shinde and Ajit Pawar as his deputies, and previously held this positi ...
the carshed was shifted back to Aarey as 25% work was already completed and Kanjurmarg was found not viable as it was very far from the metro line which could have led to higher cost and energy and also the ownership of the Kanjurmarg plot also led to disputes. Finally, on 21 July the stay order for the construction was retracted by the government and the construction resumed. This delay and other issues like the
COVID-19 pandemic The COVID-19 pandemic (also known as the coronavirus pandemic and COVID pandemic), caused by severe acute respiratory syndrome coronavirus 2 (SARS-CoV-2), began with an disease outbreak, outbreak of COVID-19 in Wuhan, China, in December ...
resulted in high cost overruns in thousands of crores in rupees and also delayed the opening of the line by at least 2 years.


Construction


Agencies involved

Construction of the Colaba-Bandra-Seepz metro involves a number of large national and supra national entities and subcontractors. These subcontractors, mostly involved in the tunneling works and mostly joint ventures include L&T-STEC (a joint venture between Larsen & Toubro India and STEC a large
Chinese Chinese may refer to: * Something related to China * Chinese people, people identified with China, through nationality, citizenship, and/or ethnicity **Han Chinese, East Asian ethnic group native to China. **'' Zhonghua minzu'', the supra-ethnic ...
infrastructure company based in
Shanghai Shanghai, Shanghainese: , Standard Chinese pronunciation: is a direct-administered municipality and the most populous urban area in China. The city is located on the Chinese shoreline on the southern estuary of the Yangtze River, with the ...
), CEC-ITD CEM-TPL, Dogus-Soma, HCC-MMS and J.Kumar-CRTG. More than 100 subcontractors and third parties have been used for various construction and relocation works including tunneling, boring, diversion of pipelines, realty consultancy and land acquisition.


Tunnels

Two 5.85 metre diameter twin tunnels of 33.5 km each were dug at a depth of 20–25 metres. Seventeen
tunnel boring machine A tunnel boring machine (TBM), also known as a "mole" or a "worm", is a machine used to excavate tunnels. TBMs are an alternative to drilling and blasting methods and "hand mining", allowing more rapid excavation through hard rock, wet or dry so ...
s (TBMs), each weighing around 1400 tonnes and costing , were used to dig tunnels and record 41 breakthroughs. The TBMs were lowered through shafts or pits using a specialized crane. Pre-cast segments were put on the tunnels' diameter to prevent cave ins, after the TBMs bore 1.2 metres. Tunnels would have to be dug through a mix of soil and basalt rock, and was expected to be difficult. After TBMs bore through a section, the metro tunnel will be lined with pre-cast concrete rings to strengthen the tunnels. Boring and placing rings occurs sequentially. For the entire Metro 3 corridor, around 40,000 concrete rings were cast in 65 moulds. Casting of the rings took place at six casting yards - four in Wadala, one each at Darga, and on the Jogeshwari-Vikhroli Link Road (JVLR). The first concrete ring was fabricated at a Wadala casting yard on 7 March 2017. Underground construction was carried out at an average depth of 15 to 25 meters. The Hutatma Chowk, Kalbadevi, Girgaum, Grant Road, Shitladevi, Santacruz and Marol Naka stations were constructed by the
New Austrian Tunnelling method The new Austrian tunneling method (NATM), also known as the sequential excavation method (SEM) or sprayed concrete lining method (SCL), is a method of modern tunnel design and construction employing sophisticated monitoring to optimize various wa ...
, while the other 20 stations were constructed by the
cut-and-cover A tunnel is an underground or undersea passageway. It is dug through surrounding soil, earth or rock, or laid under water, and is usually completely enclosed except for the two Portal (architecture), portals common at each end, though ther ...
method. In the latter method, the ground is dug, the entire station constructed, and finally the top is covered. Underground utilities were shifted to construct the line, as it is completely underground. The section of the line between Bandra Kurla Complex and Dharavi stations includes a 170 metre long tunnel passing under the Mithi river. The underwater tunnel is located at a depth of 15–20 metres beneath the river bed. A stabling line, at a depth of 12–13 meters below the river bed was also constructed. The stabling line extends up to BKC station, and will be used for stabling and reversing of trains. Construction work on the project began on 21 October 2016. The work faced delays due to several legal disputes. In March 2017, MMRC officials stated that they were unable to proceed with full scale construction activities due to legal issues, and that contractors were currently carrying out other activities such as shifting utilities, geo-technical surveys, and fabricating pre-cast segments. Officials further added that if construction did not begin within one month, the project cost would escalate at the rate per day and would result in higher passenger fares. Authorities began full scale construction activities on 18 May 2017. The alignment of Metro 3 at Chira Bazar in Marine Lines runs parallel to a Parsi fire temple. The trust that manages the temple forbids the entry of non-Parsis into the temple. As a result, contractors were unable to the enter the temple premises to map the location and conduct a building condition survey before beginning construction of the line. The trust instead requested the MMRC to hire a Parsi engineer to carry out the necessary work in the temple premises. The MMRC officials accepted the request and stated that it would work with temple authorities to avoid offending any religious beliefs and sentiments. However, with only about 57,000 Parsis residing in Mumbai, the agency faced difficulty completing the task. Tunneling work on the corridor was expected to begin by October 2017. An estimated 6 million cubic metres of rubble was to be excavated during tunneling, which would be sent to quarries on the outskirts of Mumbai. The rubble included basalt rock of good quality that could be re-used in construction. Initial plans called for the rubble to be used for the foundation of the
Shiv Smarak The Chhatrapati Shivaji Maharaj Smarak or Chhatrapati Shivaji Maharaj Memorial is a proposed monument Shivaji, the founder of the Maratha Empire. The statue will be located in Mumbai's Back Bay. As of February 2025, construction of the mon ...
monument, and the proposed Mumbai coastal road project, but delays associated with the monument made this unlikely. On 10 July 2018, the MMRDA announced that it had completed 5,100 metres of tunneling for the corridor within the first year since the project was initiated. Around 10 km of tunneling was completed by September 2018, and 20 km by February 2019. The MMRCL reported that 23.9 km of the 52 km tunnelling work had been completed by the end of March 2019, or about 45% of total tunnelling work. As of 17 December 2020, 91% of total tunneling work is complete. On 19 March 2020, MMRCL announced that it has achieved its 27th breakthrough out of the planned 41 breakthroughs. The section between BKC and Dharavi also marked the First underwater tunnel across the
Mithi River The Mithi River (Pronunciation: iʈʰiː is a river on Salsette Island, the island of the city of Mumbai, India. It is a confluence of tail-water discharges of the Powai and Vihar lakes. The river is seasonal and rises during the monsoons ...
. Pending tunneling across the Mithi river between Dharavi and BKC was completed on 19 August 2020, marking 29th such breakthrough. On 16 August 2019, Chief Minister Fadnavis revealed the model for the rolling stock for Aqua Line and announced that the line would be called the Aqua Line as the exterior and interior of the train feature an aqua colour scheme. The first trial run of the metro line was flagged off Maharashtra Chief Minister Eknath Shinde and Deputy Chief Minister Devendra Fadnavis on the 3 km stretch between Sariput Nagar in Aarey Colony and Marol Naka stations on 30 August 2022.


Stations and interchange connections

There will be 26 stations on the Aqua Line. Only the northern terminus, Aarey Depot, will be at grade. All the other 25 stations will be underground. Stations will be equipped with
platform screen doors Platform screen doors (PSDs), also known as platform edge doors (PEDs), are used at some train, rapid transit and people mover stations to separate the platform from train tracks, as well as on some bus rapid transit, tram and light rail ...
. Under the original plan, there was to be no direct connectivity between the airport and the metro. Commuters would have been required to exit the underground stations, return to ground level and cross a road to reach the airport. Upon reviewing the plan, Chief Minister Fadnavis directed the MMRC to redesign the stations to provide direct access between the underground and the airport as well as the Mumbai Central railway station.


Interchanges

Passenger interchange facilities, connecting to other railway lines, will be provided at the following stations: *
Churchgate Churchgate (Marathi pronunciation: ͡ʃəɾt͡ʃɡeːʈ is an area in the southern part of Mumbai, close to the Arabian Sea. The area is known for its unique architecture consisting of art deco style residential buildings, access to sportin ...
(connects to the Western suburban line towards
Virar Virar (Pronunciation: iɾaːɾ is a coastal city in Palghar district, Maharashtra. The northern third of the city of Vasai-Virar, it is administered by Vasai-Virar Municipal Corporation. It lies to the south of Palghar district, and to t ...
and beyond) *
Grant Road Grant or Grants may refer to: People * Grant (given name), including a list of people and fictional characters * Grant (surname), including a list of people and fictional characters ** Ulysses S. Grant (1822–1885), the 18th president of the U ...
(connects to Western suburban line towards
Virar Virar (Pronunciation: iɾaːɾ is a coastal city in Palghar district, Maharashtra. The northern third of the city of Vasai-Virar, it is administered by Vasai-Virar Municipal Corporation. It lies to the south of Palghar district, and to t ...
and beyond) *
Mumbai Central Mumbai Central (formerly Bombay Central, station code: MMCT) is a major railway station on the Western line, situated in Mumbai, Maharashtra in an area known by the same name. It serves as a major stop for both local and intercity trains with ...
(connects to two lines: the Western suburban line towards
Virar Virar (Pronunciation: iɾaːɾ is a coastal city in Palghar district, Maharashtra. The northern third of the city of Vasai-Virar, it is administered by Vasai-Virar Municipal Corporation. It lies to the south of Palghar district, and to t ...
and beyond; also to the National Rail Network for travel to cities across India) *
Mahalaxmi Lakshmi (; , , sometimes spelled Laxmi, ), also known as Shri (, , ), is one of the principal goddesses in Hinduism, revered as the Devi, goddess of wealth, fortune, prosperity, beauty, fertility, sovereignty, and abundance. She along with ...
(connects to two lines: the Western suburban line and the
Mumbai Monorail The MMRDA Mumbai Monorail is a monorail line in the city of Mumbai, Maharashtra, India, built as part of a major expansion of public transport in Mumbai, public transport in the city. The project is operated by the Mumbai Metropolitan Region De ...
) * Mumbai CSMT (connects to three lines: the Central suburban line towards
Thane Thane (; previously known as Thana, List of renamed Indian cities and states#Maharashtra, the official name until 1996) is a metropolitan city located on the northwestern side of the list of Indian states, state of Maharashtra in India and on ...
and beyond; the Harbour suburban line towards
Panvel Panvel () is a city and taluka in the Raigad district of Maharashtra, India. It is highly populated due to its closeness to Mumbai. Panvel is also governed for development purpose by the body of Mumbai Metropolitan Region. Panvel Municipal C ...
via
Vashi Vashi is a residential and commercial node in Navi Mumbai, Maharashtra, across the Thane Creek of the Arabian Sea on the outskirts of city of Mumbai. Vashi is named after the largest village present in Vashi Node. Overview Vashi is well-c ...
; and to the National Rail Network, because this is a major terminus for trains going to other cities across India) * (connects to Line-1 of Mumbai Metro which runs between
Ghatkopar Ghatkopar (Pronunciation: ʱaːʈkopəɾ is a suburb in eastern Mumbai, close to which, the City's International Airport is located. The area is located on the Western corner of the Western Ghats and marks the beginning of the Ghats from M ...
and Versova via this station, Marol) * (connects to Santacruz through skywalk; which connects Western suburban line) * (connects to Line-2 of Mumbai Metro which runs between
Dahisar Dahisar (Marathi pronunciation: ̪əɦisəɾ is the northernmost suburb (and railway station) of Mumbai. (Not to be confused with Dahisar Mori in Navi Mumbai). It is the last local railway station in Mumbai while travelling towards Dahanu Roa ...
and
Mankhurd Mankhurd (Pronunciation: aːnkʰuɾd̪(ə) is a suburb in eastern Mumbai, Maharashtra Maharashtra () is a state in the western peninsular region of India occupying a substantial portion of the Deccan Plateau. It is bordered by the Ara ...
via this station)


List of stations


Infrastructure

The car shed, where the metro rakes will be parked, is located opposite SEEPZ on a 33 hectare (81-acre plot) in Aarey Colony. In March 2017, the MMRC floated tenders for multiple works on Metro 3 including the traction system, power supply, tunnel ventilation, signalling, train control, platform screen doors and telecommunication system. The contracts include the manufacturing, supply and installation of these systems. Tenders for design, supply, installation, testing and commissioning of ballastless tracks for the underground section were floated by the MMRC in May 2017.


Rolling stock

The MMRC, a joint venture of the Government of India and the Government of Maharashtra invited bids to supply rolling stock for Metro 3 in December 2015. The process of procuring rolling stock was delayed due to a disagreement between the Central Government and JICA. The Centre wanted 75% of the total rolling stock procured for the line to be manufactured in India, as part of its
Make in India is an initiative by the Government of India to create and encourage companies to develop, manufacture and assemble products in India and incentivize dedicated investments into manufacturing. The policy approach was to create a conducive envi ...
program, even if the contract was awarded to a foreign company. However, JICA wanted the bid for rolling stock to have no restrictions. The MMRC argued that manufacturing rolling stock in India would reduce the cost of maintenance. The agency stated that although bids without restrictions would result in cheaper procurement cost for the rolling stock, the subsequent cost of importing spare parts would be expensive. Under pressure from the NITI Aayog, the Department of Economic Affairs, and the Ministry of Urban Development, JICA agreed to accept the Union Government's domestic manufacturing requirement for rolling stock for all JICA-funded metro systems in India. As a result, the winning bidder may only manufacture a maximum 25% metro cars required for Metro 3 outside India. The MMRC rejected criticism that the restrictions would favour BEML, Bombardier and Alstom, the only companies that manufacture rolling stock in India, by stating that a foreign company that won the bid could sub-contract to an India-based manufacturer. The MMRC restarted the bidding process, under the new conditions, in May 2017. The agency sought to procure 31 eight-car train sets. Each coach is 22.6 metres long and 3.2 metres wide. The MMRC received pre-qualification bids from seven firms -
Alstom Alstom SA () is a French multinational rolling stock manufacturer which operates worldwide in rail transport markets. It is active in the fields of passenger transportation, signaling, and locomotives, producing high-speed, suburban, regional ...
Transport India Ltd India & Alstom Transport S.A France (Consortium), CAF S.A, Spain, CRRC Nanjing, CRRC Changchun &
CRRC CRRC Corporation Limited (known as CRRC) is a Chinese state-owned and publicly traded rolling stock manufacturer. It is the world's largest rolling stock manufacturer in terms of revenue, eclipsing its major competitors of Alstom and Siemens. ...
International Corporation Ltd China (Consortium), Hitachi Ltd (Japan),
Kawasaki Heavy Industries is a Japanese Public company, public multinational corporation manufacturer of motorcycles, engines, Heavy equipment (construction), heavy equipment, aerospace and Military, defense equipment, rolling stock and ships, headquartered in Minato, To ...
Japan &
BHEL Bharat Heavy Electricals Limited (BHEL) is an Indian central public sector undertaking and the largest government-owned electrical/ industrial technology company. It is owned by the Government of India, with administrative control under ...
(Consortium) India, and
Mitsubishi Corporation is a Japanese general trading company ( ''sogo shosha'') and a core member of the Mitsubishi Group. For much of the post-war period, Mitsubishi Corporation has been the largest of the five great ''sogo shosha'' (Mitsubishi, Mitsui, Itochu, S ...
, Japan. In September 2018, the MMRC awarded a EUR 315 million contract to French transportation major Alstom and its Indian subsidiary to supply 336 coaches for Metro 3. The contractor will be responsible for the design, manufacture, supply, installation, testing and commissioning of 42 train sets of eight cars each. The trains will have a carrying capacity of 3,000 passengers and a seating capacity of around 300 passengers in each coach in longitudinal seating arrangements. All coaches will be designed and developed at Alstom's engineering centre in
Bangalore Bengaluru, also known as Bangalore (List of renamed places in India#Karnataka, its official name until 1 November 2014), is the Capital city, capital and largest city of the southern States and union territories of India, Indian state of Kar ...
, and manufactured by the company's plant in
Sri City Sri City or Satyavedu Reserve Infracity Pvt. Ltd. is an integrated business city (township) and special economic zone located in Tirupati district in the state of Andhra Pradesh, India. Founded by Ravindra Sannareddy, who is currently the Manag ...
, Andhra Pradesh. Metro 3 will be driverless. The line has an automation level of grade 4. However, the line will employ drivers during its first year in operation. Trains on the line will also utilize a time-interval system which allows them to maintain the minimum possible distance required for safety between each other. As all trains are connected with the operation control centre, every train is aware of the speed and distance of all other trains.


Signalling

Metro 3 will utilise the
Alstom Alstom SA () is a French multinational rolling stock manufacturer which operates worldwide in rail transport markets. It is active in the fields of passenger transportation, signaling, and locomotives, producing high-speed, suburban, regional ...
Urbalis 400
communications-based train control Communications-based train control (CBTC) is a railway signaling system that uses telecommunications between the train and track equipment for traffic management and infrastructure control. CBTC allows a train's position to be known more accura ...
(CBTC) signalling system. There are no signals on the line, and speed and distance between the trains is monitored by onboard computers that are connected with a central computer in the operations control centre.


Power

MMRDA joint project director Dilip Kawathkar stated that AC power was chosen for Aqua Line "after a proper study by a team of experts" which found that the AC model was "a better option". Experts believe that the decision to use AC escalated the project cost by 15%, since more digging is required for the rail to work on AC.


Operations

Despite providing connectivity to Mumbai's airport, passengers on Metro 3 will not be permitted to carry their check-in luggage onboard trains. Only hand/cabin baggage will be allowed. MMRC officials stated that Metro 3 was not an " Airport Express line", but a regular city metro corridor. Officials explained that providing luggage check-in would require additional dwell time at the Airport metro station, which would increase the overall headway of the line, and disrupt services for other passengers.


Fare collection

Metro 3 will utilize an open loop
automated fare collection system An automated fare collection (AFC) system is the collection of components that automate the ticketing system of a public transportation network – an automated version of manual fare collection. An AFC system is usually the basis for integrated t ...
. Passengers will be able to pay for travel using
contactless Contactless may refer to: * Contactless smart card * Proximity card, a contactless integrated circuit device used for security access or payment systems * Contactless payment, systems which use RFID for making secure payments * MasterCard Contactl ...
pre-paid and post-paid
smart cards A smart card (SC), chip card, or integrated circuit card (ICC or IC card), is a card used to control access to a resource. It is typically a plastic credit card-sized card with an Embedded system, embedded integrated circuit (IC) chip. Many smart ...
issued by partnering banks. Only
RuPay RuPay (portmanteau of Rupee and Payment) is an Indian multinational financial services and payment service system, conceived and owned by the National Payments Corporation of India (NPCI). It was launched in 2012, to fulfil the Reserve Bank ...
debit and credit cards will be accepted on Metro 3. In March 2017, the MMRC held a pre-bid meeting with all pre-qualified bidders for the "Design, Manufacture, Supply, Installation, Testing and Commissioning of Tunnel Ventilation & Environmental Control System." In the same month, the agency received 12 bids from consortia to set up an automatic fare collection system. In March 2020, MMRC expressed its displeasure over Tata Power's revised electricity tariffs and announced it could result in higher fares for passengers when the line opens.


Non-fare revenue

MMRCL licensed co-branding rights or semi-naming rights for five stations on the metro line at ₹216 crore on 22 September 2022. The naming rights were provided to the following entities for a period of five years: *
Kotak Mahindra Bank Kotak Mahindra Bank Limited is an Indian banking and financial services company headquartered in Mumbai. It offers banking products and financial services for corporate and retail customers in the areas of personal finance, investment banking, l ...
- BKC & CSMT Metro *
State Bank of India State Bank of India (SBI) is an Indian Multinational corporation, multinational Public sector undertakings in India, public sector bank and financial service body headquartered in Mumbai. It is the largest bank in India with a 23% market shar ...
- CSMIA Terminal 2, Dadar Metro & Vidhan Bhavan *
Life Insurance Corporation The Life Insurance Corporation of India (LIC) is an Indian public sector life insurance company headquartered in Mumbai. It is India's largest insurance company as well as the largest institutional investor with total assets under management wo ...
- Churchgate Metro & Hutatma Chowk *
ICICI Lombard ICICI Lombard General Insurance Company Limited is an Indian general insurance company headquartered in Mumbai, Maharashtra. ICICI is engaged with general insurance, reinsurance, insurance claims management and investment management. The co ...
- Siddhivinayak * Nippon India Mutual Fund - Acharya Atre Chowk The naming rights include the branding space inside the station, mentioning in train announcements and station maps and prefixing the name of the brand to the station name. Times Innovative media OOH Pvt. Ltd, a leading Indian OOH agency responsible for advertising in Metro line 1, has secured the advertisement rights from MMRCL for all the 27 stations and 31 trains. MMRCL leased over 1.3lac sq. ft of commercial spaces over 27 stations on 17 January 2025 to entities like majors such as Tata Trent, Chitale Bandhu and Delicia Foods. It aimed to earn a revenue of ₹20 crore.


Gallery

File:Metro Line 3 Rake at Aarey Metro Station.jpg, Metro Aqua Line rake at Aarey JVLR Metro Station File:Metro Line 3 Rake Interior.jpg, Interior of the train rake File:BKC Metro Station Concourse.jpg, Concourse of KOTAK BKC Metro Station File:Marol Naka Underground Metro Stationː View of Platform.jpg, Marol Naka Underground Metro Station, view of platform File:Marol Naka Station Platform.jpg, Platform of Marol Naka Station File:SEEPZ Underground Metro Station.jpg, SEEPZ Underground Metro Station File:View of CSMI-T2 Airport Metro Station Concourse.jpg, View of SBI CSMI-T2 Airport Metro Station concourse File:A Metro leaving BKC Metro Station.jpg, A Metro leaving KOTAK BKC Metro Station File:View of Aarey Metro Station.jpg, View of Aarey JVLR Metro Station File:Aarey Metro Stationː Post station tracks.jpg, Aarey JVLR Metro Station, post-station tracks


References

{{authority control Mumbai Metro lines Airport rail links in India Japan International Cooperation Agency