Msheireb Downtown Doha
   HOME

TheInfoList



OR:

Msheireb Downtown Doha is a
planned city A planned community, planned city, planned town, or planned settlement is any community that was carefully planned from its inception and is typically constructed on previously undeveloped land. This contrasts with settlements that evolve ...
in
Doha Doha ( ) is the capital city and main financial hub of Qatar. Located on the Persian Gulf coast in the east of the country, north of Al Wakrah and south of Al Khor (city), Al Khor and Lusail, it is home to most of the country's population. It ...
,
Qatar Qatar, officially the State of Qatar, is a country in West Asia. It occupies the Geography of Qatar, Qatar Peninsula on the northeastern coast of the Arabian Peninsula in the Middle East; it shares Qatar–Saudi Arabia border, its sole land b ...
being constructed in place of the current district of
Mushayrib Mushayrib (; also spelled Musheireb) is a Qatari district located in the municipality of Ad Dawhah. As of the 2010 census, the former district of Al Asmakh has been integrated into Mushayrib. It is one of the oldest districts of Doha, and contain ...
. It is promoted as being the world's first sustainable downtown regeneration project and one of the smartest cities on earth, strategically located in the heart of Doha. Initial construction began in January 2010. Located in the downtown area of Qatar's capital city, it is set to occupy 310,000 sq m with the total cost of construction amounting to approximately $5.5 billion. It was launched in six phases by Msheireb Properties, a subsidiary of
Qatar Foundation The Qatar Foundation for Education, Science and Community Development () is a state-led non-profit organization in Qatar, founded in 1995 by then-List of emirs of Qatar, emir Hamad bin Khalifa Al Thani and his second wife Moza bint Nasser Al-Miss ...
. The project is a flagship project for Msheireb Properties, and aims to preserve the historical downtown area of Doha.
Orange Business Orange Business, the business services arm of Orange S.A., is a Systems integrator, global integrator of communications, products, and services for multinational corporations. On 16 February 2023, Orange Business Services got renamed to Orang ...
helped transform the flagship project and it also been awarded in Smart City world congress in Barcelona. This prize recognizes the most innovative and successful smart city project being implemented and developed in the fields of governance and finance.


Project overview

Msheireb means 'a place to drink water' in Arabic. It is a QR20 billion (US$5.5 billion, €4.18 billion) project, covering an area of (310,000
square metre The square metre ( international spelling as used by the International Bureau of Weights and Measures) or square meter ( American spelling) is the unit of area in the International System of Units (SI) with symbol m2. It is the area of a square ...
s) offering a maximum floor space quantum of 764,176 square metres.


Construction phases

The city has six construction phases: Phase 1A, Phase 1B, Phase 1C, Phase 2, Phase 3 and Phase 4. Phase 1A's contract was awarded to a consortium consisting of
Hyundai Engineering & Construction Hyundai Engineering and Construction Co., Ltd. (HDEC; ) is a major construction company in South Korea. The company was founded by Chung Ju-yung in 1947 as the Hyundai Civil Works Company and was a major component of the Hyundai Group. Hyundai ...
and Hamad Bin Khalid Contracting Company. Phase 1B began in December 2011, and
Carillion Carillion plc was a British multinational construction and facilities management services company headquartered in Wolverhampton in the United Kingdom, prior to its liquidation in January 2018. Carillion was created in July 1999, following a ...
and Qatar Building Company were selected as the main contractors. In January 2018, Carillion's UK business went into
liquidation Liquidation is the process in accounting by which a Company (law), company is brought to an end. The assets and property of the business are redistributed. When a firm has been liquidated, it is sometimes referred to as :wikt:wind up#Noun, w ...
blaming its collapse on problem contracts including the Msheireb Downtown Doha project, where the company claimed it was owed £200m – former CEO Richard Howson said he felt like "a bailiff" in chasing the debt. However, this claim was quickly disputed by Msheireb Properties, who said it had continued to pay Carillion but Carillion did not pass funds on to its supply chain, leaving over 40 subcontractors unpaid, resulting in Msheireb incurring additional costs to pay Carillion's suppliers and engaging a new contractor to complete the project. The Qataris were prepared to testify to the UK Parliamentary committees investigating Carillion's collapse, provided written evidence to them, and were considering a £200m claim against Carillion. In June 2018, Carillion (Qatar) LLC went into liquidation.; Phase 4 of over 350,000 M2 BUA (15 residential, commercial, medical and 5start hotel buildings plus 6 basement technical and parking) was awarded to Consolidated Contractors Group (Offshore)(CCC) and Teyseer Contracting (JV) (US$630 M) (GOLDEN LEED Certified); which was started Jan. 2017 and completed in Mar. 2022. Phase 4 is considered to be one of the best phases in terms of quality of construction works and timely closure of technical and commercial works. Phase 4 was managed by Ihab Al Sharief (PD), Youssef Hazouri project (PM MEP), and Husam AJ Diyab (PM Controls/Contracts). The project was expected to take two years, but the customer was said to have changed architect three times and issued 40,000 new drawings. The project is now due to finish in December 2018. Brookfield Multiplex and Medgulf were contracted for Phase 1C in November 2012. Phase 2 began in December 2012, with Arabtec being awarded the contract. In May 2013,
Obayashi Corporation is one of five major Japanese construction companies along with Shimizu Corporation, Takenaka Corporation, Kajima Corporation, and Taisei Corporation. It is listed on the Tokyo Stock Exchange and is one of the Nikkei 225 corporations. Its h ...
and Hamad Bin Khalid Contracting Company were awarded the contract for Phase 3.


Location

Msheireb Downtown Doha is located at Mohamed Bin Jassim District – central Doha, bordered by: * Al Rayyan Road to the North; * Jassim Bin Mohamed Street to the East; * Msheireb Street to the South; and * Al Diwan Street (part of Ring Road A) to the West. The Msheireb project site is immediately adjacent to the Amiri Diwan, Qatar's seat of government and
Ruler A ruler, sometimes called a rule, scale, line gauge, or metre/meter stick, is an instrument used to make length measurements, whereby a length is read from a series of markings called "rules" along an edge of the device. Usually, the instr ...
's palace. The site is also adjacent to the redeveloped Souk Waqif, a successful mixed-use scheme based on a traditional Qatari souk and the historical Al Koot Fort.


Master plan

The master plan comprises six distinct phases. The first phase, referred to as the 'Diwan Amiri Quarter', currently under construction, features a combination of three major government buildings including the National Archive, along with heritage sites, a museum and an Eid Prayer Ground. Subsequent phases include a 5-star Mandarin Oriental Hotel,
Park Hyatt Hyatt Hotels Corporation, commonly known as Hyatt Hotels & Resorts, is an American multinational hospitality company headquartered in the Riverside Plaza area of Chicago that manages and franchises luxury and business hotels, resorts, and vac ...
Doha &
MGallery Mercure is a French midscale hotel chain owned by Accor. Created in 1973 in France, the brand was acquired by Accor in 1975, and subsequently became a major part of the company's midscale hotel portfolio, alongside Novotel. As of 2021, Mercure o ...
along with 1 additional hotel, commercial office space, a multitude of residential types and a wide variety of retail shops and restaurants. There is also a significant community and arts focus, featuring a cultural forum, school, nurseries and mosques.


Quarters


Diwan Amiri Quarter

Anchored at the northeast corner of the project, the Diwan Amiri Quarter is adjacent to both the Amiri Diwan and the Al Koot Fort.


Heritage Quarter

The Heritage Quarter is a historic area which contains traditional courtyard houses and the recently restored Msheireb Eid Prayer Ground, dating to the first decade of 20th century, alongside a newly constructed mosque. The newly renovated Msheireb Eid Prayer Ground, found opposite of Al Koot Fort and in close proximity to
Souq Waqif Souq Waqif () is a marketplace ( souq) in Doha, the capital of Qatar. The souq sells traditional garments, spices, handicrafts, and souvenirs. It is also home to restaurants and shisha lounges. The original building is a specimen of traditional ...
, was inaugurated in October 2014. It occupies 3,200 square meters and can hold up to 3,600 worshippers. This quarter hosts the Heritage Houses, which include the Bin Jelmood House, the Company House, the Mohammed bin Jassim House and the Radwani House. The Heritage Houses have been refurbished and re-purposed as individual museums that collectively constitute the
Msheireb Museums Msheireb Museums is a project by Msheireb Properties which celebrates the histories of four historic heritage houses in the heart of Msheireb Downtown Doha, a planned city in the Qatari capital Doha. Msheireb Museums are an integral part of the ...
, a project that was formally opened to the public in October 2015.


Retail Quarter

The largest of all five quarters, the Retail Quarter will feature the Galleria an enclosed shopping mall, with several international flagship stores, cinema, supermarket, children's edutainment zone and numerous dining outlets.


Mixed-Use & Residential Quarter

Mixed-Use Quarter will have a combination of commercial, retail and residential properties that overlap the Retail Quarter.


Business Gateway

Spread over 193,000 square metres, the Business Gateway will offer business amenities, supported by a mix of banking, personal and civic services.


Construction updates


Phase 1A

Consists of Diwan Ameri Quarter (Diwan Annex, Amiri Guard and National Archive), heritage buildings, mosque, amenities and infrastructure (district cooling plant, substations and service corridors); seven buildings in total. Status: * Enabling Works: The works are 100% complete. * Infrastructure Works: The works are 100% complete. * Main Building Works: The works are 100% complete.


Phase 1B/1C

Comprises offices, town houses, apartments, amenities, hotel, civil buildings, school, cultural centre and mosque; total of 56 buildings. Status: * Enabling works are 100% complete. * Piling works are 100% complete. * 1B Main Building Works: 62.8% of the work completed. (Target completion July-2016). * 1C Main Building Works: 66.8% of the work completed (Target completion Aug-2016). * Substructure works are 100% complete.


Phase 2

Mainly comprises retail, offices, apartments, cinemas, department store and hotel; ten buildings in total. Status: * Enabling works: was awarded to Ammico in Jun-2010 and 100% complete * Construction works: 55.8% of the work completed (Target Completion Jun-2016)


Phase 3

Comprises retail, offices, apartments and hotel; 14 buildings in total. Status: * Demolition works 100% completed. * Enabling works 100% completed. * Raft package 100% completed. * Main work package: 51.0% complete (target completion Oct-2016).


Phase 4

Mainly comprises residential and commercial buildings, retail, turn-key apartments, 5-star hotel, medical buildings, soft/hard landscapes, and interface with Metro projects. Fifteen buildings plus six basements (technical/service area and parking). The fourth and final phase was officially completed in February 2022. All three residential blocks with hotel and service apartments, as well as the six commercial blocks are sustainable buildings architecturally similar to other buildings in the city.


Design

Three-year project with leading architects, city planners, engineers, and academics (including specialists from
Harvard Harvard University is a private Ivy League research university in Cambridge, Massachusetts, United States. Founded in 1636 and named for its first benefactor, the Puritan clergyman John Harvard, it is the oldest institution of higher lear ...
,
Princeton Princeton University is a private Ivy League research university in Princeton, New Jersey, United States. Founded in 1746 in Elizabeth as the College of New Jersey, Princeton is the fourth-oldest institution of higher education in the Unit ...
,
Yale Yale University is a private Ivy League research university in New Haven, Connecticut, United States. Founded in 1701, Yale is the third-oldest institution of higher education in the United States, and one of the nine colonial colleges ch ...
and
MIT The Massachusetts Institute of Technology (MIT) is a private research university in Cambridge, Massachusetts, United States. Established in 1861, MIT has played a significant role in the development of many areas of modern technology and sc ...
) to understand how insights from the past can be combined with present-day technologies and thinking to achieve a new, distinctly Qatari architectural language. Language comprises seven 'steps' or distinct design principles: Past and Future; Individual and Collective; Space and Form; Aspects of Home; Aspects of the Street; Climate Design; Language of Architecture. Approximately 25% of the city will be allocated towards residential developments. Hotels, shops and retail establishments will take up a combined space of 26%, while government buildings have been allotted roughly more than one-third of the entire area. The city is expected to accommodate around 15,000 residents. Msheireb Downtown Doha is set to contain one of the largest collection of LEED-certified buildings in the world.


Sustainability

Sustainability is central to the Msheireb project, in terms of both the conservation of natural resources and the quality of its design. All buildings within the development will target an average Gold rating under the internationally recognized
LEED Leadership in Energy and Environmental Design (LEED) is a Green building certification systems, green building certification program used worldwide. Developed by the non-profit U.S. Green Building Council (USGBC), it includes a set of rating ...
(Leadership in Energy and Environmental Design) certification system developed by the
US Green Building Council The U.S. Green Building Council (USGBC), founded in 1993, is a private 501(c)(3), membership-based non-profit organization that promotes sustainability in building design, construction, and operation. USGBC is best known for its development of t ...
, while several buildings will aim for a Platinum rating. The entire project features sustainable design that consumes fewer resources, generates less waste, costs less to operate, and achieves a reduced
carbon footprint A carbon footprint (or greenhouse gas footprint) is a calculated value or index that makes it possible to compare the total amount of greenhouse gases that an activity, product, company or country Greenhouse gas emissions, adds to the atmospher ...
. Sustainability facts: * Streets within Msheireb are oriented to capture cool breezes from the Gulf and shade most pedestrian routes from the hot sun. * Buildings are massed to shade one another, and light coloured to reduce cooling requirements. * Eco-friendly building material, thicker walls, heat-isolating glass that prevent the heat loss and keeps the internal temperature, resulting in lower use of energy for cooling. * The city integrates 6,400 solar panels for electricity generation and 1,400 for water heating, alongside water treatment systems repurposed for cooling and irrigation. Energy-saving measures like insulating glass and thick walls. * 30% energy reduction due to the improved building envelopes of walls and windows, recessed windows, energy recovery to the outside air entering the building, optimised and a high-efficiency district cooling plant.


Gallery

Msheireb development construction (1).jpg, Construction in Msheireb Downtown Doha in 2013 Msheireb development construction (2).jpg, Roadside view of construction in Msheireb Downtown Doha in 2013 Musheireb downtown on Abdullah Bin Thani Street in 2021.jpg, Musheireb downtown on Abdullah Bin Thani Street in 2021. Msheireb Downtown Doha tram at night.jpg , Msheireb Tram at night in Msheireb Downtown. Msheireb Museums (0I0R8782).jpg , Msheireb Museums.


See also

*
Mushayrib Mushayrib (; also spelled Musheireb) is a Qatari district located in the municipality of Ad Dawhah. As of the 2010 census, the former district of Al Asmakh has been integrated into Mushayrib. It is one of the oldest districts of Doha, and contain ...
*
Msheireb station Msheireb () is a rapid transit station in Doha, Qatar located between Msheireb Downtown Doha and Mushayrib. It serves as a transfer station for the Red Line (Doha Metro), Red, Gold Line (Doha Metro), Gold and Green Line (Doha Metro), Green lines ...


References

{{Coord, 25, 17, 9.9, N, 51, 31, 37.6, E, display=title Planned communities in Qatar Doha