The Mochovce Nuclear Power Plant (, abbr. EMO) is a
nuclear power plant A nuclear power plant (NPP), also known as a nuclear power station (NPS), nuclear generating station (NGS) or atomic power station (APS) is a thermal power station in which the heat source is a nuclear reactor. As is typical of thermal power st ...
located between the towns of
Nitra Nitra (; also known by other #Etymology, alternative names) is a city in western Slovakia, situated at the foot of Zobor Mountain in the valley of the river Nitra (river), Nitra. It is located 95 km east of Bratislava. With a population of ...
and
Levice Levice (; , Hungarian pronunciation: ; ) is a town in western Slovakia. The town lies on the left bank of the lower Hron river. The Old Church Slavonic, Old Slavic name of the town was ''Leva'', which means "the Left One". The town is located i ...
, on the site of the former village of Mochovce, Slovakia. Two up-rated 470 MW (originally 440 MW) reactors plus a 471 MW VVER 440 reactor are presently in operation, with a fourth of the same type under commissioning. In 2022 it generated almost 7,000 GWh of electricity, the power plant provided approximately 20% of Slovakia's electricity needs.


History

A power plant consisting of four VVER 440/V-213
pressurized water reactor A pressurized water reactor (PWR) is a type of light-water nuclear reactor. PWRs constitute the large majority of the world's nuclear power plants (with notable exceptions being the UK, Japan, India and Canada). In a PWR, water is used both as ...
s was proposed in the 1970s. The Czechoslovak government began with a geological survey to find a suitable seismically stable site. After taking into account all factors the location of the village of Mochovce was chosen. Preparatory work was started in June 1981, and site construction for Mochovce-1 and Mochovce-2 started in November 1982. Construction of the remaining two units, Mochovce-3 and Mochovce-4, began in 1985 but work on all four units was halted in 1991 due to a lack of funds. In 1995 the Slovak government approved a plan to finish the first pair with additional Western safety technology. The first two units were commissioned in 1998 and 1999 respectively. Commissioning of the plant has sparked protests in
Austria Austria, formally the Republic of Austria, is a landlocked country in Central Europe, lying in the Eastern Alps. It is a federation of nine Federal states of Austria, states, of which the capital Vienna is the List of largest cities in Aust ...
, a neighboring country strongly opposed to the use of nuclear energy in general. Installed capacity of units 1 and 2 was up-rated by 7% in 2008. Construction of Units 3 and 4 restarted in November 2008. They were planned initially to be completed in 2012 and 2013, but the completion date was shifted to 2016 and 2017. More recently the completion date has slipped to 2020 and 2022. The owner of the plant is Slovenské elektrárne, which is 34%
state-owned State ownership, also called public ownership or government ownership, is the ownership of an industry, asset, property, or enterprise by the national government of a country or state, or a public body representing a community, as opposed to ...
.
Enel Enel S.p.A. is an Italian multinational manufacturer and distributor of electricity and gas. Enel was first established as a public body at the end of 1962, and then transformed into a limited company in 1992. In 1999, following the liberali ...
, an Italian utility company, was the majority 66% owner, but sold half its stake to Czech energy group EPH in 2017. Enel plans to sell its remaining stake after completion of units 3&4.


Units 1&2 operations

Since late 2008 the two operating units at Mochovce NPP have uprated net electrical power output to 436 MW per turbogenerator, ergo the total installed capacity of units 1 and 2 in Mochovce NPP stands at 872 MW. In 2009, the plant managed to generate over 7 TWh of electricity during a one-year period for the first time in its history. This represents approximately one quarter of the overall annual electricity consumption in Slovakia. All units at Bohunice and Mochovce NPP feature evolutionary VVER pressurized water reactors, which are characteristic with: *relatively low power and power density *huge volume of water for cooling during normal operation as well as in emergency *robust design with reinforced concrete containment with walls thick up to 1.5 m *triple redundancy safety systems (3 x 100%) *high level of passive safety. Water flowing from the units' VVER-440 reactors to primary circuit heat exchangers has a temperature of about 297 °C. Cooling is by
cooling tower A cooling tower is a device that rejects waste heat to the atmosphere through the cooling of a coolant stream, usually a water stream, to a lower temperature. Cooling towers may either use the evaporation of water to remove heat and cool the ...
s.


Units 3&4 construction

Units 3&4 of Mochovce NPP are currently under construction. This project is: *one of the three projects of nuclear power plants currently under construction in the EU *the largest private investment in the history of Slovakia *2/3 of works on site are performed by Slovak companies *90% of the population around power plant is in favour of the completion of Units 3&4 *each unit will have 471 MWe gross 440 MWe net electrical output *annual production of two units will save over 7 million tonnes of emissions. Unit 3 was expected to be operational in 2021 and unit 4 in 2023, delayed from earlier plans for 2018 and 2019. The commissioning license was issued for unit 3 in January 2022. The technical start license was issued in August 2022. On the 26th of August 2022, the Slovak Nuclear Regulatory Authority (ÚJD) gives the final authorisation for the commissioning of Unit 3. The operator ( Slovenské elektráne) commenced fuel loading operations on 9 September 2022. The first reactor criticality was reached on 22 October 2022. The third reactor was operational as of October 2023. When all four units are operational, nuclear power is expected to produce 70% of Slovakia's electricity.


Safety

Although the original power plant design featured safety improvements such as seismically resistant attachment of equipment, it did not suit the safety and regulatory environment of the 1990s. To rectify this the German company
Siemens Siemens AG ( ) is a German multinational technology conglomerate. It is focused on industrial automation, building automation, rail transport and health technology. Siemens is the largest engineering company in Europe, and holds the positi ...
supplied a new control system, and Western and EU safety measures were implemented during the final phases of construction. According to the plant operator Mochovce nuclear power plant was the first Soviet-sourced nuclear plant in the former
Eastern Bloc The Eastern Bloc, also known as the Communist Bloc (Combloc), the Socialist Bloc, the Workers Bloc, and the Soviet Bloc, was an unofficial coalition of communist states of Central and Eastern Europe, Asia, Africa, and Latin America that were a ...
to meet the safety standards of Western nuclear power plants. The nuclear industry was conceived and developed with a conscientious awareness of having to face and respect strict safety guidelines, as well as technical, environmental and health standards. For this reason, safety at a power plant is verified and controlled at maximum possible levels in all of its phases (project design, authorization, construction, operation, decommissioning and final dismantlement), using procedures that have been elaborated exclusively for the needs of this specific sector. In addition, the realization of a nuclear power station is subordinated by a particularly complex authorization process comprising two different components: authorization from a nuclear safety standpoint, and in terms of its environmental impact (EIA – Environmental Impact Assessment). In concrete terms, safety in the electronuclear industry is entrusted to a set of technical, organizational and human measures enacted throughout all stages of an installation's lifetime, with the aim of protecting citizens and the surrounding environment from a release of radioactive material under any circumstances.


Environment

Nuclear power plants emit no greenhouse gas to the atmosphere, in this way NPPs annually contribute to CO2 emission reduction by 15 million tonnes in Slovakia. Nuclear power plants hence contribute significantly to the obligation to reduce emissions of harmful greenhouse gas to the atmosphere. Mochovce NPP meets all international requirements and that the operation impact is minimal. Water required for cooling is taken from a water dam built on the nearby Hron river, which ensures sufficient supply of water even in extremely dry climate conditions. The impact of the discharged water on the quality of the Hron river water, fauna and flora is negligible. Emissions to the atmosphere and effluents to the hydrosphere are regularly measured and assessed in the 15-km area around the plant. There are 25 monitoring stations of the tele-dosimetry system, which continuously monitor the dose rate of gamma radiation, activity of aerosols and radioactive iodine in the air, soil, water and food chain (feed, milk, agricultural products). The volume of radioactive substances contained in liquid and gaseous discharges is considerably lower than the limits set out by authorities.


Radiation protection

For radiation protection of the power plant staff and population, the ALARA principle is applied. This principle ensures that the radiation exposure inside and outside the power plant is As Low As Reasonably Achievable and well below the limits set by legislation. The impact of the NPP operation on the environment and human health is negligible with respect to other radiation sources present in everyday life. There are 24 monitoring stations of the tele-dosimetry system in the 20 km radius around the power plant, which continuously monitors the dose rate of gamma radiation, volume activity of aerosols and radioactive iodine in the air, soil, water and food chain (feed, milk, agricultural produces). The volume of radioactive substances contained in liquid and gaseous discharges is considerably lower than the limits set out by authorities.


Stress tests

Immediately after the Fukushima accident, European politicians, representatives of the nuclear industry and regulatory bodies agreed on the undertaking of power-plant safety reviews. All 15 member states of the EU operating nuclear power plants were involved. The testing of the two Bohunice NPP V2 units and all four Mochovce NPP units was carried out mainly through engineering analyses, calculations and reports. Stress tests analysed extraordinary external events – earthquakes, floods, and impacts of other events that might result in the multiple loss of power-plant safety functions. The combination of events, including loss of power supply, long-term water supply breakdown, as well as loss of power supply due to extreme climate conditions were also assessed. Stress tests revealed no deficiencies requiring immediate action; the further safe operation of neither the operating units nor the units under construction was put in doubt. Identified measures would further increase nuclear safety, for example by adding mobile diesel-generator for recharging of back-up batteries.


Technical data


See also

* Energoland * Nuclear energy in Slovakia * List of commercial nuclear reactors#Slovakia


References


External links


Official presentation of Mochovce NPP
{{Authority control Energy infrastructure completed in 1998 Nuclear power stations in Slovakia Czechoslovakia–Soviet Union relations Buildings and structures in Nitra Region Nuclear power stations using VVER reactors Nuclear power stations with reactors under construction Energetický a průmyslový holding