Manitoba Hydro Place (MHP) is an
office tower
A skyscraper is a tall continuously habitable building having multiple floors. Modern sources currently define skyscrapers as being at least or in height, though there is no universally accepted definition. Skyscrapers are very tall high-ri ...
serving as the headquarters building of
Manitoba Hydro
The Manitoba Hydro-Electric Board, operating as Manitoba Hydro, is the electric power and natural gas utility in the province of Manitoba, Canada. Founded in 1961, it is a provincial Crown Corporation, governed by the Manitoba Hydro-Electric B ...
, the electric power and natural gas utility in the province of
Manitoba
, image_map = Manitoba in Canada 2.svg
, map_alt = Map showing Manitoba's location in the centre of Southern Canada
, Label_map = yes
, coordinates =
, capital = Win ...
, Canada. Located at 360
Portage Avenue
Portage or portaging (Canada: ; ) is the practice of carrying water craft or cargo over land, either around an obstacle in a river, or between two bodies of water. A path where items are regularly carried between bodies of water is also called a ...
in
downtown
''Downtown'' is a term primarily used in North America by English speakers to refer to a city's sometimes commercial, cultural and often the historical, political and geographic heart. It is often synonymous with its central business distric ...
Winnipeg
Winnipeg () is the capital and largest city of the province of Manitoba in Canada. It is centred on the confluence of the Red and Assiniboine rivers, near the longitudinal centre of North America. , Winnipeg had a city population of 749 ...
and connected to the
Winnipeg Walkway
The Winnipeg Walkway System, also known as the Winnipeg Skywalk, is a network of pedestrian skyways and tunnels connecting a significant portion of downtown Winnipeg, Manitoba.
The City of Winnipeg described the Walkway as a system of 14 skyways ...
system, Manitoba Hydro Place received
LEED
Leadership in Energy and Environmental Design (LEED) is a
green building certification program used worldwide. Developed by the non-profit U.S. Green Building Council (USGBC), it includes a set of rating systems for the design, constructio ...
Platinum certification in May 2012, making it the most
energy-efficient office tower in North America and the only office tower in Canada to receive the LEED Platinum rating.
Opened as Winnipeg's 4th tallest building in September 2009,
the 21-story office tower brought together 1,650 employees
from 15 suburban locations
into one high-rise on a full, downtown block. With the design's
plan view
In technical drawing and computer graphics, a multiview projection is a technique of illustration by which a standardized series of orthographic two-dimensional pictures are constructed to represent the form of a three-dimensional object. Up to ...
resembling a capital letter ''"A"'', the project comprises two 18-storey twin wings framing three 6-storey, south-facing
atria (winter gardens). The design's stepped, three-storey, street-scaled podium
contains retail space as well as an interior pedestrian street and a single level of parking, partially below grade — over which sit the atria, office wings and their 3-storey mechanical penthouse.
Total project cost was C$278m.
The building's
bioclimatic
Green building (also known as green construction or sustainable building) refers to both a structure and the application of processes that are environmentally responsible and resource-efficient throughout a building's life-cycle: from planni ...
, energy-efficient design features a tall
solar chimney
:''This article refers to a device for ventilation. For the power generation technology, see Solar updraft tower.''
A solar chimney often referred to as a thermal chimney is a way of improving the natural ventilation of buildings by using convec ...
, a
geo-thermal HVAC
Heating, ventilation, and air conditioning (HVAC) is the use of various technologies to control the temperature, humidity, and purity of the air in an enclosed space. Its goal is to provide thermal comfort and acceptable indoor air quality. ...
system using 280 five-inch tubes bored 380 feet into an underground aquifer,
100% fresh air (24 hours a day, year-round, regardless of outside temperature)
and a one-meter-wide double exterior wall with computer-controlled motorized vents that adjust the building's exterior skin throughout the day and evening. Together, the various elements of the design enable a 70% energy savings over a typical large office tower.
In 2009,
CBC News
CBC News is a division of the Canadian Broadcasting Corporation responsible for the news gathering and production of news programs on the corporation's English-language operations, namely CBC Television, CBC Radio, CBC News Network, and CBC.c ...
called Manitoba Hydro Place one of "the most energy-efficient office towers in the world"
and the ''
Toronto Star
The ''Toronto Star'' is a Canadian English-language broadsheet daily newspaper. The newspaper is the country's largest daily newspaper by circulation. It is owned by Toronto Star Newspapers Limited, a subsidiary of Torstar Corporation and pa ...
'' called MHP the "most important building in Canada."
Background and design process
Construction of a downtown headquarters building was integral to the 2002 purchase agreement between
Manitoba Hydro
The Manitoba Hydro-Electric Board, operating as Manitoba Hydro, is the electric power and natural gas utility in the province of Manitoba, Canada. Founded in 1961, it is a provincial Crown Corporation, governed by the Manitoba Hydro-Electric B ...
and the City of Winnipeg for purchase of the formerly city-owned
electric utility
An electric utility is a company in the electric power industry (often a public utility) that engages in electricity generation and distribution of electricity for sale generally in a regulated market. The electrical utility industry is a majo ...
, Winnipeg Hydro.
Manitoba Hydro representatives toured to Europe to identify examples of energy efficient design a year prior to beginning the architect selection process.
Subsequently, the company assembled an
integrated design
Integrated design is a comprehensive holistic approach to design which brings together specialisms usually considered separately. It attempts to take into consideration all the factors and modulations necessary to a decision making process.
A few ...
team including members from the corporation itself along with the design architects, the architects of record, energy engineers, building system engineers, cost estimators, and project contractors — selecting the Design Architect first:
Kuwabara Payne McKenna Blumberg Architects of Toronto.
Smith Carter Architects of Winnipeg was the Architect of Record.
By December 2003, the design team had selected the final site,
and by 2004, Manitoba Hydro unveiled a series of design concepts for the building,
having created a design brief for the building:
The brief was developed into a project charter defining the project's core principles and against which design concepts would be measured: that it would be flexible and adaptable to new technology and workplace changes,
offer world-class energy efficiency,
offer a signature design to enhance the image of the company and the city,
help strengthen the city downtown,
and be a solid financial investment.
The company committed one year to developing the building concept, using another year to ensure the concept integrated the key elements, including architectural, structural, energy performance, cost, constructability, and
LEED
Leadership in Energy and Environmental Design (LEED) is a
green building certification program used worldwide. Developed by the non-profit U.S. Green Building Council (USGBC), it includes a set of rating systems for the design, constructio ...
factors. Sixteen alternatives were developed, subsequently reduced to three options from which the final concept was selected.
Energy efficient design
To meet its initial design target, that of a sustainable, energy-efficient building, Manitoba Hydro Place (MHP) was developed using an
Integrated Design Process to optimize the building's massing, orientation and exposed thermal mass and to use digital analysis and computerized building management systems to increase its efficiency.
MHP integrates
passive
Passive may refer to:
* Passive voice, a grammatical voice common in many languages, see also Pseudopassive
* Passive language, a language from which an interpreter works
* Passivity (behavior), the condition of submitting to the influence of on ...
elements (e.g., the south-facing winter gardens, natural daylighting, and the solar chimney) as well as
active
Active may refer to:
Music
* ''Active'' (album), a 1992 album by Casiopea
* Active Records, a record label
Ships
* ''Active'' (ship), several commercial ships by that name
* HMS ''Active'', the name of various ships of the British Royal ...
systems (e.g., dimmable, programmable fluorescent lighting and a computer-operated
building management system
Building automation (BAS), also known as building management system (BMS) or building energy management system (BEMS), is the automatic centralized control of a building's HVAC (heating, ventilation and air conditioning), electrical, lighting, ...
).
See: Conceptual diagram of building systems at MHP
Key specifics of the design include siting of the building to take advantage of prevailing winds and solar gain, minimizing north-facing surface area, using the building's south-facing atria to provide and precondition the building's constant fresh-air supply and using several 24-meter-tall waterfalls to humidify and dehumidify the fresh air intake.
Green roof
A green roof or living roof is a roof of a building that is partially or completely covered with vegetation and a growing medium, planted over a waterproofing membrane. It may also include additional layers such as a root barrier and drainag ...
s at the base of the building use plants to reduce
stormwater
Stormwater, also spelled storm water, is water that originates from precipitation (storm), including heavy rain and meltwater from hail and snow. Stormwater can soak into the soil ( infiltrate) and become groundwater, be stored on depressed land ...
runoff and minimize the building's
heat-island effect, including such native prairie plants as
sweet grass.
The design uses the building's concrete
thermal mass
In building design, thermal mass is a property of the mass of a building that enables it to store heat and provide inertia against temperature fluctuations. It is sometimes known as the thermal flywheel effect. The thermal mass of heavy structura ...
to mitigate extreme temperature swings and integrate
radiant heating
Radiant heating and cooling is a category of HVAC technologies that exchange heat by both convection and radiation with the environments they are designed to heat or cool. There are many subcategories of radiant heating and cooling, including: ...
and cooling systems,
with a
solar chimney
:''This article refers to a device for ventilation. For the power generation technology, see Solar updraft tower.''
A solar chimney often referred to as a thermal chimney is a way of improving the natural ventilation of buildings by using convec ...
to provide 100% fresh air by moving exhaust air to the bottom of the chimney to combine with the atria's preconditioned air and preheat incoming cold air to within room temperature,
and employing
geothermal technology via a closed loop system of 280 boreholes, six inches in diameter (variously reported as five inches in diameter), 400 feet deep, located between elements of the foundation. The geo-thermal boreholes are filled with tubing carrying
glycol
A diol is a chemical compound containing two hydroxyl groups ( groups). An aliphatic diol is also called a glycol. This pairing of functional groups is pervasive, and many subcategories have been identified.
The most common industrial diol is e ...
, which extracts heat from the building in warmer months while warming the thermal mass of the floor slabs radiantly in colder months. Heat pumps and exchangers maximize the system's efficiency, providing conditioned water that is then circulated in tubes in the exposed ceiling slabs, providing 100% of the mechanical temperature conditioning.
MHB features a high performance
building envelope A building envelope is the physical separator between the conditioned and unconditioned environment of a building including the resistance to air, water, heat, light, and noiseSyed, Asif. ''Advanced building technologies for sustainability''. Hoboke ...
with a glass skin that is effectively triple-glazed — where the interior layer is single-glazed and separated from the double-glazed exterior layer by a one meter wide buffer zone. Windows at the east and west include operable sashes of both motorized, centrally controlled panels in the outer glazing and manually operated panels at the inner glazing as — well as shading located in the interstitial space.
The floor plan shapes themselves (also known as floorplates) of MHP are shallow, with a distance of 11 meters from the face of the building to its interior core, facilitating natural daylighting.
Other systems integral to the design include high ceilings to maximize natural lighting, exterior walls of low-iron glass for maximum solar gain, automated solar shading, raised floors with a displacement ventilation system, high-output lighting with occupancy and light sensors on each fixture, a computer-based
building management system
Building automation (BAS), also known as building management system (BMS) or building energy management system (BEMS), is the automatic centralized control of a building's HVAC (heating, ventilation and air conditioning), electrical, lighting, ...
to coordinate operation of energy management and building systems as well as a group of
green roof
A green roof or living roof is a roof of a building that is partially or completely covered with vegetation and a growing medium, planted over a waterproofing membrane. It may also include additional layers such as a root barrier and drainag ...
s at the building's podium.
To achieve personal comfort levels, users have access to the operable elements of the façade and receives natural lighting 80% of normal office hours. In addition to the operable sashes, users can control their immediate environment via task lighting, shading devices and user-operable floor grilles.
Incidental to the building design itself, another idea behind MHP was indirect energy savings the project would facilitate by combining 15 disparate company entities in a single downtown location. Before MHP opened, 95 percent of the employees commuted to work via automobile.
After working at the new building for less than half a year, 50% of commuters were using forms of transportation other than the automobile.
MHP energy use
MHP targets electric usage less than 100 kWh/m
2/a compared to 400 kWh/m
2/a for a typical large scale North American office tower, located in a more temperate climate.
Specifically, the average cold-climate Class A Canadian office uses 400–550 kWh/m
2 per year.
A typical office space in Manitoba uses 495 kWh/m
2 per year. Five years before the MHB was designed the typical office space in Canada utilized used 550 kWh/m
2 per year.
Because of recent work to reduce energy consumption in Winnipeg, a typical office highrise in the city uses approximately 325 kWh/m
2 annually.
Current annual Canadian energy targets for Class A office towers are 260kWh/m
2.
MHP projected an annual use of 88 kWh/m
2 per annum, exceeding the ''Model National Energy Code for Buildings'' (MNECB) by 66%.
The building targets
Leadership in Energy and Environmental Design (LEED) certification at the platinum level, the highest level of a four tier rating system. On May 25, 2012, MHB was finally awarded formal certification,
achieving LEED Platinum, the first office building in North America to do so. As part of their announcement, it was confirmed that their annual energy use is 85 kWh/m
2, slightly lower than anticipated.
Cost
MHP was constructed at a cost of C$278 m,
or $400 per square foot.
This would place the cost of the building much higher than local building developers would typically target for a city that is not expanding rapidly.
The building was also financed internally, with a target construction payback period of more than 60 years rather than the much shorter typical return projection.
During the initial phase of construction, in 2006, engineers discovered a higher
water table
The water table is the upper surface of the zone of saturation. The zone of saturation is where the pores and fractures of the ground are saturated with water. It can also be simply explained as the depth below which the ground is saturated.
Th ...
than anticipated. As the basement had originally been designed to accommodate numerous mechanical systems, the building underwent substantial redesign, including its foundation. A level of the basement was also eliminated during the redesign.
Awards
*2009
Council on Tall Buildings and Urban Habitat (CTBUH)'s ''Best Tall Building Americas'' award. At the time, CTBUH said Manitoba Hydro Place "was designed to be completely site specific. The design could not be transplanted to another city and still work, thus making it the perfect response to the seeming homogenization of the world's skylines."
*2008 IBS Award, Highly Commended
*2009 ''Building of the Year, Office Category'' by Arch Daily.
*2010
American Institute of Architects
The American Institute of Architects (AIA) is a professional organization for architects in the United States. Headquartered in Washington, D.C., the AIA offers education, government advocacy, community redevelopment, and public outreach to ...
Committee on the Environment (COTE), Top Ten Green Buildings.
*2010 Sustainable Architecture & Building Magazine Award, Project Winner
*2010
Royal Architectural Institute of Canada
The Royal Architectural Institute of Canada (RAIC) is a not-for-profit, national organization that has represented architects and architecture for over 100 years, in existence since 1907. The RAIC is the leading voice for excellence in the built ...
, National Urban Design Award
*2010 the SAB (Sustainable Architecture and Building) Canadian Green Building Award.
*Engineers Canada – National Project Achievement Award
*2010 ACEC Canadian Consulting Engineering Award – Buildings
*2011
Royal Architectural Institute of Canada
The Royal Architectural Institute of Canada (RAIC) is a not-for-profit, national organization that has represented architects and architecture for over 100 years, in existence since 1907. The RAIC is the leading voice for excellence in the built ...
, Innovation in Architecture
*Canadian Consulting Engineering – Award of Excellence
*Association of Consulting Engineering Companies – Manitoba (Consulting Engineers of Manitoba) – Keystone Award and Award of Excellence
*Consulting Engineers of Alberta – Award of Excellence Sustainable Design
Gallery
Image:Manitoba Hydro June10.jpg, June 2007
Image:Manitoba hydro tower under construction.jpg, January 2008
See also
*
List of tallest buildings in Winnipeg
This is a list of tallest buildings in Winnipeg, the capital and largest city in Manitoba, Canada. Winnipeg has 7 buildings that stand taller than .
As of 2011, Winnipeg had 143 completed high-rise buildings, with 5 more under constructio ...
References
External links
*
*
*
*
Construction Photos at SkyscraperPage Discussion Forums*
* {{webarchive, url=https://web.archive.org/web/20071215173257/http://www.hydro.mb.ca/projects/downtown/index.shtml, date=December 15, 2007, title=Downtown Office Project
Manitoba Hydro
Headquarters in Canada
Office buildings completed in 2009
Skyscrapers in Winnipeg
2009 establishments in Manitoba
KPMB Architects buildings
Skyscraper office buildings in Canada
Buildings and structures in downtown Winnipeg