The line will use 160 km/h Type-A trains. The investment is 14.93 billion CNY. The line will have both underground and ground level sections. It also passes through Tuo River between 1st Tuo River Bridge and 3rd Tuo River Bridge. Total investment for the line is 14.93 billion CNY. 40% is paid by Chengdu; relocation fee in Ziyang is paid by Ziyang Government; 54.1% left is mortgage from bank. * On 27 Nov 2020, construction officially started for Line S3. * On 10 March 2023, Line S3 finished all tunnel and bridge work, entering electric work stage. * On 31 May 2023, Line S3 (Ziyang Line) started mechanical and electrical work, after competing line construction.Stations
Operation
The line uses Type-A Trains operating at 160 km/h speed and powered by 25kV AC overhead lines. The whole line will use 4-car Trains in opening and foreseeable future, with 11 Trains (44 Cars) planning to be purchased.References