Line 5 is a southwest–northeast line of
Suzhou Rail Transit. It opened on June 29, 2021. The line is 44.1 kilometers long.
Its south-western terminus is at
Taihu Xiangshan station
Taihu Xiangshan Station () is the South-Western terminus of Line 5, Suzhou Rail Transit. The station is located in Wuzhong District, Jiangsu, within the Xiangshan area of Lake Tai
Taihu (), also known as Lake Tai or Lake Taihu, is a lake ...
in
Wuzhong District, with its north-eastern terminus at
Yangchenghu South station
Yangchenghu Station () is the North-Eastern terminus Line 5, Suzhou Rail Transit. The station is located in Suzhou Industrial Park, Jiangsu. It has been in use since June 29, 2021; when Line 5 first opened to the public, and is located on the ...
in
Suzhou Industrial Park
The China–Singapore Suzhou Industrial Park (), or Suzhou Industrial Park for short, abbreviated as SIP, is a county-level administrative area located in Suzhou, Jiangsu, China. The industrial park was established in February 1994, as part of th ...
.
50 six car type B fully automated subway trains were ordered for the line.
Stations
References
Suzhou Rail Transit lines
Railway lines opened in 2021
{{Suzhou-stub